Nan Zhang

Dr. Nan Zhang


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 May 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
NZNan Zhang
Nan Zhang
TJTianru Jiang
Tianru Jiang
ZLZhimin Lv
Zhimin Lv
As the main energy-consuming equipment, the reheating furnace plays an important role in the scheduling of continuous casting and hot rolling for a steel mill. This paper studies the energy consumption of cold and hot slab conversion mode in a reheating furnace, forming four conversion relationships, with the goal of minimizing the coupling function between the maximum completion time of the hot rolling and the energy waste of the reheating furnace, and modelling the scheduling of a continuous casting–hot rolling process. An improved ordered pair bat algorithm is used to solve for special process conditions of the proposed scheduling model. The effectiveness of the proposed model and algorithm is verified by solving the different slab charging sequence and conversion mode. Moreover, a comparative study of different types of batches is also conducted, and it is found that the model can save more than 5000 GJ per month for the steel mill, which can achieve the goal of effective energy saving and increasing enterprise profit.

22 June 2024 in Processes
Verified
Journal Article
Open access
PDF file
TJTianru Jiang
Tianru Jiang
NZNan Zhang
Nan Zhang
YXYongyi Xie
Yongyi Xie
ZLZhimin Lv
Zhimin Lv
The hot rolled strip is a basic industrial product whose surface quality is of utmost importance. The condition of hot rolling work rolls that have been worn for a long time is the key factor. However, the traditional scheduling method controls risks to the surface quality by setting fixed rolling length limits and penalty scores, ignoring the wear condition differences caused by various products. This paper addresses this limitation by reconstructing a hot rolling-scheduling model, after developing a model for pre-assessment of the risk to surface quality based on the Weibull failure function, the deformation resistance formula, and real production data from a rolling plant. Additionally, Ant Colony Optimization (referred to as ACO) is employed to implement the scheduling model. The simulation results of the experiments demonstrate that, compared to the original scheduling method, the proposed one significantly reduces the cumulative risk of surface defects on products. This highlights the efficacy of the proposed method in improving scheduling decisions and surface quality of hot rolled strips.