Marcos Tadeu Oliveira

Mr. Marcos Tadeu Oliveira


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 February 2021 in IEEE Access
Verified
Journal Article
Open access
POPatricia de Sousa Oliveira
Patricia de Sousa Oliveira
MOMarcos Tadeu Barros de Oliveira
Marcos Tadeu Barros de Oliveira
MOMarcos Tadeu Oliveira
Marcos Tadeu Oliveira
LCLucas Reis Conceição
Lucas Reis Conceição
André Luís Marques MarcatoAndré Luís Marques Marcato
André Luís Marques Marcato
CJCarlos Alberto Veiga de Alencar Junior
Carlos Alberto Veiga de Alencar Junior
The maintenance schedule planning of hydro plant generating units is a subject of great interest to several agents in the energy industry. A correct approach for this problem can prevent the degradation of physical assets and minimize the probability of forced shutdowns of their equipment. In addition to these factors, due particularities of the Brazilian system, the operational strategies of its agents are also affected by the maintenance schedule of the generating units. This occurs due to the Availability Factor (AFA), which is directly influenced by the hours of maintenance performed at the plant and, in case of a performance below the stipulated in the concession contracts, it can lead to financial losses or administrative sanctions applied by the regulatory agent. With this motivation in mind, the present work proposes a methodology for Generator Maintenance Scheduling (GMS) of a hydroelectric plant, developing a mathematical model to determine the ideal moment to perform maintenance, considering operational restrictions and regulatory aspects of hydroelectric plants. The optimization methodology proposed for this problem is done through mixed-integer linear programming, where the integer variables consist of the operating state and start date of maintenance of each generating unit. In the end, to validate the proposed modeling, a case study is carried out for a real large plant in the Brazilian system.

13 December 2021 in Energies
Verified
Journal Article
Open access
PDF file
MOMarcos Tadeu Oliveira
Marcos Tadeu Oliveira
PSPatrícia de Sousa Oliveira Silva
Patrícia de Sousa Oliveira Silva
EOElisa Oliveira
Elisa Oliveira
André Luís Marques MarcatoAndré Luís Marques Marcato
André Luís Marques Marcato
Giovani Santiago JunqueiraGiovani Santiago Junqueira
Giovani Santiago Junqueira
The present work proposes a Monte Carlo Simulation (MCS) to obtain availability projections for Hydroelectric Power Plants (HPP), based mainly on regulatory aspects involving the Availability Factor (AFA). The main purpose of the simulation is to generate scenarios to obtain statistics for risk analysis and decision-making in relation to the HPP. The proposed methodology consists of two steps, firstly, the optimization of the maintenance schedule of the hydroelectric plant is carried out, in order to allocate the mandatory maintenance in the simulation horizon. Then, for the MCS, scenarios of forced shutdowns of the Generating Units (GU) will be generated, which directly influence the operation and, consequently, the availability of the HPP. The scenarios will be inserted into an operation optimization model, which considers the impact of forced shutdown samples on the MCS. The proposed modeling was applied using real data from the Santo Antônio HPP, which is one of the largest hydroelectric plants in Brazil.

15 November 2021 in Journal of Control, Automation and Electrical Systems
Verified
Journal Article
Closed access
PDF file
PSPatrícia de Sousa Oliveira Silva
Patrícia de Sousa Oliveira Silva
MOMarcos Tadeu Oliveira
Marcos Tadeu Oliveira
EOElisa Oliveira
Elisa Oliveira
LCLucas Reis Conceição
Lucas Reis Conceição
Giovani Santiago JunqueiraGiovani Santiago Junqueira
Giovani Santiago Junqueira
Fernando Luiz Cyrino OliveiraFernando Luiz Cyrino Oliveira
Fernando Luiz Cyrino Oliveira