Yangyang Yuan

Prof. Dr. Yangyang Yuan

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 September 2024 in Journal of Cleaner Production
Verified
Journal Article
Closed access
YYYangyang Yuan
Yangyang Yuan
WGWei Guo
Wei Guo
STSiqi Tang
Siqi Tang
JZJiaqi Zhang
Jiaqi Zhang

24 June 2023 in Ecological Indicators
Verified
Journal Article
Open access
YYYangyang Yuan
Yangyang Yuan
STSiqi Tang
Siqi Tang
JZJiaqi Zhang
Jiaqi Zhang
WGWei Guo
Wei Guo

11 March 2024 in Ecological Indicators
Verified
Journal Article
Open access
YYYangyang Yuan
Yangyang Yuan
STSiqi Tang
Siqi Tang
WGWei Guo
Wei Guo
JZJiaqi Zhang
Jiaqi Zhang

1 January 2018 in Educational Sciences: Theory & Practice
Verified
Journal Article
Open access
ZLZhe Li
Zhe Li
YCYuning Cheng
Yuning Cheng
YYYangyang Yuan
Yangyang Yuan

3 January 2022 in Water
Verified
Journal Article
Open access
PDF file
YYYangyang Yuan
Yangyang Yuan
YGYu Gan
Yu Gan
YXYuhan Xu
Yuhan Xu
QXQining Xie
Qining Xie
YSYuqing Shen
Yuqing Shen
YYYue Yin
Yue Yin
The types of urban mountains are diverse, and the surrounding environment is complex. The conditions of runoff generation and convergence in different regions of the same mountain vary. Using the Lijia Mountain in China’s Nanjing City as a case study, this study investigates the effects of such mountain-region-based LID (Low Impact Development) systems. Based on the hydrological analysis of this mountain region, SWMM (Storm Water Management Model) software is used to model and compare the runoff control effects of two LID systems schemes, namely segmental detention and retention and terminal detention and retention. The study’s findings demonstrate that the terminal detention and retention scheme can effectively delay the time of peak flooding and partly reduce peak discharge. In contrast, the segmental detention and retention scheme has a limited delay effect on flood peaks but significantly reduces the peak discharge. This research breaks through the limitations of the previous construction of a single LID scheme for mountainous regions in built-up urban areas. It serves as a theoretical model and technical reference for selecting LID scenarios in response to different mountain conditions.

10 May 2022 in Water
Verified
Journal Article
Open access
PDF file
QHQinghe Hou
Qinghe Hou
YCYuning Cheng
Yuning Cheng
YYYangyang Yuan
Yangyang Yuan
Mo WangMo Wang
Mo Wang
Within the concept of sponge city in China, green stormwater measures have been widely used in urban mountain parks. This study provides an integrated assessment framework for hydrological cost-effectiveness in the Nanjing Guanyao Mountain Park under various precipitation scenarios. A grey drainage basic strategy and four multi-level control strategies with progressively increasing graded interception or storage facilities at mid-and terminal levels were designed and evaluated. Results show that the multi-level interception and storage strategy (S4) proved to be the most beneficial, followed by the multi-level interception strategy (S2) having slightly lower results than the multi-level storage strategy (S3), while the terminal strategy (S1) showed poor results. However, the hydrological cost-effectiveness exhibits the opposite trend under 2–5-year storms. A high multi-level strategy limited by life-cycle costs may not impart high hydrological cost-effectiveness in response to each return period of storms in this mountain stormwater practice. This study validates the hydrological performance and cost-effectiveness of multi-level distributed strategies in an urban mountain park, bridges the limitations of the previous studies on single scheme design and hydrological performance assessment for sloped sites, and provides a technical reference and design basis for similar studies and practices.