This paper describes a probabilistic study of the two-dimensional bearing capacity of a vertically loaded strip footing on spatially random, cohesive soil using numerical limit analyses (NLA-CD). The analyses use a Cholesky decomposition (CD) technique with midpoint discretization to represent the spatial variation in undrained shear strength within finite-element meshes for both upper- and lower-bound analyses and assumes an isotropic correlation length. Monte Carlo simulations are then used to interpret the bearing capacity for selected ranges of the coefficient of variation in undrained shear strength and the ratio of correlation length to footing width. The results are compared directly with data from a very similar study in which bearing capacity realizations were computed using a method of local average subdivision (LAS) in a conventional displacement-based finite-element method (FEM-LAS). These comparisons show the same qualitative features but suggest that the published FEM calculations tend to ov...
1 July 2011 in Journal of Water Resources Planning and Management
This paper describes and demonstrates an efficient method for online hydraulic state estimation in urban water networks. The proposed method employs an online predictor-corrector (PC) procedure for forecasting future water demands. A statistical data-driven algorithm (M5 Model-Trees algorithm) is applied to estimate future water demands, and an evolutionary optimization technique (genetic algorithms) is used to correct these predictions with online monitoring data. The calibration problem is solved using a modified least-squares (LS) fit method (Huber function) in which the objective function is the minimization of the residuals between predicted and measured pressure at several system locations, with the decision variables being the hourly variations in water demands. To meet the computational efficiency requirements of real-time hydraulic state estimation for prototype urban networks that typically comprise tens of thousands of links and nodes, a reduced model is introduced using a water system–aggregat...
Nearly one billion people worldwide receive water through piped networks that are not continually pressurized and operate intermittently. The prevalence and persistence of these Intermittent Water Supplies (IWS) is surprising as this mode of operation induces water contamination and customer equity issues. Shortages of source water, customers' water demand, and leaking pipes are frequently cited as necessitating IWS. We propose a framework for understanding the persistence and operation of IWS. The supply system is represented by an average customer and a spatially averaged leakage rate. With this macroscopic hydraulic model, we relate customer demand satisfaction, source water availability, customer demand, and leakage. While this approach ignores the complexities of network topology, we find that the model approximates real systems well (calibrating to four intermittent reference networks achieved R2>0.94). The calibrated model is robust to moderate changes in demand and leakage (maintaining R2>0.83). Using the model, we show that the tipping point between satisfied demand and unsatisfied demand is a local optimum for utilities, which may explain the persistence of IWS. Beyond this point, the volume received by customers does not increase, but utilities must supply more water to the network. The generality of the proposed model enables its use when regulating and upgrading IWS. We demonstrate the latter by critiquing a performance‐based contract that was intended to improve an intermittent supply in India. Demand satisfaction has profound implications for hydraulics and human welfare. We propose the degree of demand satisfaction as a metric for evaluating IWS and for tracking the United Nations Sustainable Development Goal 6.1.
This paper describes the application of a quasi-one-demensional (1D) network, bubble model to simulate the filtration of a microfine cement suspension injected through a column of sand. The bubble model represents the soil column as a series of homogeneous sites linked through bundles of cylindrical bonds that characterize the distribution of pores. The model captures mechanisms of particle sieving at the inlet sites and infiltration within each of the bonds under the action of hydrodynamic and gravitational forces. The behavior of each bond is based on numerical simulations of particle transport, collection, mounding, and clogging within a cylindrical model pore. Two empirical parameters are introduced to account for uncertainties in particle attachment at the pore wall and observed mechanisms of resuspension of hindered particles. In principal, these parameters can be calibrated from measurements of effluent concentrations. The bubble model provides useful physical insights to explain the transient dyna...
1 June 2022 in Journal of Geotechnical and Geoenvironmental Engineering
The catastrophic failure of the Córrego do Feijão Dam 1 in January 2019 has raised many questions regarding the safety of tailings storage facilities constructed by upstream methods. The stability of these structures is strongly affected by the internal stratigraphy and properties of the hydraulically deposited, segregated tailings materials (from slimes to coarse sands) and by control of seepage conditions. The authors conducted an independent review of site investigation data reported by an Expert Panel (December 2019) and evaluated the stability for a critical section of the Feijão Dam 1 using 2D numerical limit analyses under various representations of fill stratigraphy and shear strength properties. The results show that the structure has a low factor of safety, on average, based on conventional assumptions of drainage conditions for fill strata. The computed failure mechanism is strongly affected by the presence of a layer of normally consolidated, low permeability slimes near the base of the fill, and by the lack of drainage provisions within the starter dam. The analyses show a clearly defined critical mechanism of failure over the full height of the fill and suggest that the dam has smaller margins of safety than previously published limit equilibrium results. The analyses do not resolve or identify causes of the actual dam failure, which occurred more than three years after the end of construction but do suggest that more reliable methods of slope stability are needed in design.