Hartmut Schmeck

Dr. Hartmut Schmeck

orcid

Research Focus & Metrics

Academic Career Length

45Years (1982-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 November 2002 in IEEE Transactions on Evolutionary Computation
Verified
Journal Article
Closed access
DMDaniel Merkle
Daniel Merkle
MMM. Middendorf
M. Middendorf
HSHartmut Schmeck
Hartmut Schmeck
An ant colony optimization (ACO) approach for the resource-constrained project scheduling problem (RCPSP) is presented. Several new features that are interesting for ACO in general are proposed and evaluated. In particular, the use of a combination of two pheromone evaluation methods by the ants to find new solutions, a change of the influence of the heuristic on the decisions of the ants during the run of the algorithm, and the option that an elitist ant forgets the best-found solution are studied. We tested the ACO algorithm on a set of large benchmark problems from the Project Scheduling Library. Compared to several other heuristics for the RCPSP, including genetic algorithms, simulated annealing, tabu search, and different sampling methods, our algorithm performed best on average. For nearly one-third of all benchmark problems, which were not known to be solved optimally before, the algorithm was able to find new best solutions.

1 June 2001 in Advances in Engineering Software
Verified
Journal Article
Closed access
JBJ Branke
J Branke
TKT Kaußler
T Kaußler
HSHartmut Schmeck
Hartmut Schmeck

1 January 2000
Verified
Book Chapter
Closed access
PDF file
JBJürgen Branke
Jürgen Branke
TKThomas Kaussler
Thomas Kaussler
CSChristian Smidt
Christian Smidt
HSHartmut Schmeck
Hartmut Schmeck

1 December 2009 in European Journal of Operational Research
Verified
Journal Article
Closed access
JBJ. Branke
J. Branke
BSB. Scheckenbach
B. Scheckenbach
MSM. Stein
M. Stein
KDK. Deb
K. Deb
HSHartmut Schmeck
Hartmut Schmeck

1 March 2016 in IEEE Transactions on Smart Grid
Verified
Journal Article
Closed access
SGSebastian Gottwalt
Sebastian Gottwalt
JGJohannes Garttner
Johannes Garttner
HSHartmut Schmeck
Hartmut Schmeck
CWChristof Weinhardt
Christof Weinhardt
The share of renewable generation (RG) in the energy mix has seen constant growth in recent years. RG is volatile and not (fully) controllable. Consequently, the alignment of stochastic demand with supply, which is fundamental for ensuring grid stability, becomes more difficult. The utilization of demand side flexibility as well as RG portfolio design are attractive opportunities to avoid excessive investments in conventional power plants and costs for balancing power. This paper provides a comprehensive centralized scheduling model to exploit demand flexibility from residential devices. We analyze the monetary value of households for demand response (DR) by determining the potential of various current and possible available future end consumer devices to reduce generation costs of a flexibility aggregator in a microgrid with a large share of RG. Furthermore, we identify key characteristics affecting the value of demand flexibility and derive recommendations for an aggregator's RG portfolio structure. Our simulation results indicate that electric vehicles, stationary batteries, and storage heaters are the most promising devices for residential DR. Furthermore, we show that the potential of a device to directly utilize intermittent RG is largely influenced by the composition of the renewable energy source portfolio.

1 May 2002 in Journal of Heuristics
Verified
Journal Article
Closed access
PDF file
MMMartin Middendorf
Martin Middendorf
FRFrank Reischle
Frank Reischle
HSHartmut Schmeck
Hartmut Schmeck