Weiqiang Wu

Mr. Weiqiang Wu


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 January 2022 in Energies
Verified
Journal Article
Open access
PDF file
WWWeiqiang Wu
Weiqiang Wu
GGGuofang Gong
Guofang Gong
YCYuxi Chen
Yuxi Chen
XZXinghai Zhou
Xinghai Zhou
The tunnel boring machine (TBM) is widely used in tunnel construction projects. The thrust system plays a crucial role to drive the machine ahead and support gripper shoes stably while tunneling. More and more attention has been paid to the pressure and velocity regulation efficiency as the TBM advances in complex rock conditions to ensure the stabilization of the tunneling process. A thrust hydraulic control system, assembled with a proportional pressure reducing valve, is established with system operating parameters. The mathematical model of the thrust electro-hydraulic system is revealed. To improve the control characteristics of the thrust system, a self-tuning fuzzy PID controller is introduced in the pressure and velocity regulation procedures. After that, tests on a Φ2.5 m scaled TBM test rig are carried out. The test results show that the thrust system adopting the fuzzy PID controller results in less oscillation and a smoother regulation process. It takes less time to reach the target goal of pressure regulation with less vibration during the pressure regenerating periods, and both systems of conventional PID controller and fuzzy PID controller are qualified in velocity regulation movements. The proposed control methods show better benefits in reduction of vibrations and shorter time of regulation to stable conditions, which extends the machine’s life and affects the acceleration of the tunneling process.

8 February 2022 in Machines
Verified
Journal Article
Open access
PDF file
WWWeiqiang Wu
Weiqiang Wu
GGGuofang Gong
Guofang Gong
QHQuan Huan
Quan Huan
XZXinghai Zhou
Xinghai Zhou
YCYuxi Chen
Yuxi Chen
XPXiongbin Peng
Xiongbin Peng
The thrust system of a tunnel boring machine plays a crucial role by driving the machine ahead and supporting the gripper shoes stably. A thrust hydraulic control system, assembled with a proportional flow control valve and a pressure relief valve, is established with system operating parameters. The mathematical model of a thrust electrohydraulic system is presented. To improve the control characteristics of the thrust system, a self-tuning fuzzy PID controller was introduced in synchronization motion control situations. To attain the best control parameters, three synchronization motion control systems were used to control the thrust propel cylinders. Tests on a Ø2.5 m scaled TBM test rig were carried out to verify the capabilities of the ISCS, SRSCS and CRSCS. Comparative tests were conducted, and the results showed that the thrust system adopting SRSCS achieved the least oscillation and the quickest response. The steady-state displacement error decreased by about 33.3% in contrast to the ISCS and CRSCS.

1 February 2024 in International Journal of Control, Automation, and Systems
Verified
Journal Article
Closed access
PDF file
YCYuxi Chen
Yuxi Chen
GGGuofang Gong
Guofang Gong
XZXinghai Zhou
Xinghai Zhou
YZYakun Zhang
Yakun Zhang
WWWeiqiang Wu
Weiqiang Wu

20 January 2023 in Machines
Verified
Journal Article
Open access
PDF file
XZXinghai Zhou
Xinghai Zhou
GGGuofang Gong
Guofang Gong
YZYakun Zhang
Yakun Zhang
WWWeiqiang Wu
Weiqiang Wu
YCYuxi Chen
Yuxi Chen
Excavation load prediction is of great importance for the prior design and latter performance evaluation of tunnel boring machines (TBMs). In this paper, an improved load prediction model is developed based on classical Colorado school of mines model for TBMs equipped with constant cross-sectional disc cutters. The typical structure and principle are introduced to predict the single cutter force, and the total cutter group load is calculated by defining the equivalent diameter and cutter spacing. Subsequently, the improved model of a more brief and acceptable type is established via summation. Some novel performance indexes, including the reformed field penetration index, torque/thrust penetration index, and specific energy are, respectively, derived in formulaic form. By field data verification in the borehole zones of two cases, the proposed model is proven to be more accurate in the total load prediction. The single-factor regression results show that the reformed field penetration index reveals the nonlinear relationship between TBM load and penetration rate, and the torque/thrust penetration index is a new TBM inherent index to evaluate the working conditions. Specific energy, used to evaluate the excavation efficiency, is positive with rock strength and proved negative with penetration rate via a normalization analysis. Finally, suggestions on the cutter group configuration against abominable stratum are discussed.