Ade Irman

Mr. Ade Irman

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2019 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
AIAde Irman
Ade Irman
EFE Febianti
E Febianti
UKU Khasanah
U Khasanah
Scheduling is defined as the process of allocating resources over time to perform a collection of tasks within a certain period of time. PT KHI Pipe Industries in Cilegon Indonesia, has been producing high quality longitudinal and spiral weld steel pipes. The company uses FCFS (first come first serve) rule for scheduling their jobs, which means that job processing based on the first incoming prioritizes orders. In October 2018 there was delay in their production, namely 1771 pipes are still in work in process (WIP) of total demand is 6, 296 pipes. Based on these problems, this research tries to determine a better production scheduling by getting minimum makespan as scheduling performance. Heuristic and metaheuristic methods used in this research for minimizing the makespan, there are Campbell Dudek Smith (CDS) for heuristic and Particle Swarm Optimization (PSO) for metaheuristic. We also proposed a new heuristic algorithm for this problem. The results show the makespan of each method, there are CDS method: 742.87 hours, PSO method: 711.96 hours, Proposed Heuristic Algorithm method: 694.64 hours, and existing production scheduling of FCFS rules is 746.43 hours. Based on the results, the Proposed Heuristic Algorithm has smaller makespan than the others.

19 March 2018 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
SISirajuddin
Sirajuddin
MHM Cut Gebrina Hisbach
M Cut Gebrina Hisbach
RERatna Ekawati
Ratna Ekawati
AIAde Irman
Ade Irman
North container terminal known as North TPK is container terminal located in Indonesia Port Corporation area serving domestic container loading and unloading. It has 1006 ground slots with a total capacity of 5,544 TEUs and the maximum throughput of containers is 539,616 TEUs / year. Container throughput in the North TPK is increasing year by year. In 2011-2012, the North TPK container throughput is 165,080 TEUs / year and in 2015-2016 has reached 213,147 TEUs / year. To avoid congestion, and prevent possible losses in the future, this paper will analyze the flow of containers and the level of Yard Occupation Ratio in the North TPK at Tanjung Priok Port. The method used is the Autoregressive Integrated Moving Average (ARIMA) Model. ARIMA is a model that completely ignores independent variables in making forecasting. ARIMA results show that in 2016-2017 the total throughput of containers reached 234,006 TEUs / year with field effectiveness of 43.4% and in 2017-2018 the total throughput of containers reached 249,417 TEUs / year with field effectiveness 46.2%.

1 December 2019 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
AIAde Irman
Ade Irman
DSD Satria
D Satria
NDN M Dewantari
N M Dewantari
ARArliannur
Arliannur
TET Ero
T Ero
Almost the big cities in the world has the traffic jam problem. Serang City as the capital city of Banten-Indonesia has the same traffic problem, without a good integrated public transport, makes the problem of traffic transportation in Serang City becomes heavier. Virtual traffic simulation is known as powerful tool for generating alternative solution to minimize the traffic problems. This research use PTV Vissim as virtual traffic simulation software to minimize the traffic problems in Serang City. Serang City has 6 sub-district area, there are Cipocok, Curug, Kasemen, Serang, Taktakan, and Walantaka. This research focus on vehicles traffic only in area of sub-district Serang with 5 main traffic lights crossroad. PTV Vissim uses to simulate the 5 of the main crossroads and find the average of the existing vehicles queue length in rush hour. Trial and error operations such as traffic lights timing and routing modification use to generate alternative solutions for minimizing vehicles queue length as traffic performance in this research. The result of this research has found the rush hour in Serang City occured at 06.00-10.00 and 14.01-18.00 (UTC +07:00), and the routing modification in Kebon Jahe can reduce the average of queue length for 53%.

24 April 2020 in Journal Industrial Servicess
Verified
Journal Article
Open access
PDF file
SSSupriyanto Supriyanto
Supriyanto Supriyanto
ARAsep Ridwan
Asep Ridwan
RSRia Sudiana
Ria Sudiana
MBMoh Sofyan Budiarto
Moh Sofyan Budiarto
SSSilfiana Silfiana
Silfiana Silfiana
ARArta Rusidarma
Arta Rusidarma
Pengukuran Kualitas E-Commerce Pariwisata Banten Menggunakan Metode Importance-Performance Analysis (IPA)

16 January 2020 in Jurnal Ilmiah Teknik Industri
Verified
Journal Article
Open access
PDF file
YMYusraini Muharni
Yusraini Muharni
AIAde Irman
Ade Irman
TRTania Ero Rubyanti
Tania Ero Rubyanti
Sistem produksi di sebuah perusahaan fabrikasi seingkali mengalami permasalahan salah satunya adalah ketika perusahaan tidak mampu mengirim order kepada customer di waktu yang telah ditentukan. Hal ini dapat menyebabkan perusahaan harus menanggung biaya pinalti. Masalah ini dapat diatasi apabila dilakukannya penjadwalan produksi dengan baik. Pentingnya penjadwalan produksi adalah untuk mengelola dengan tepat sumber daya yang ada agar terciptanya efektivitas dan efisiensi dalam penggunaan sumber daya. Salah satu usaha yang dilakukan untuk tercapainya penjadwalan yang optimal adalah dengan meminimalkan makespan. Produk Steel Bridge B-60 merupakan salah satu dari jenis jembatan Truss Bridge yang diproduksi oleh Perusahan Fabrikasi Baja Struktur Kontruksi yang berlokasi di Cilegon. Perusahan tersebut memiliki sistem produksi make to order dengan alur produksi flow shop dan susunan mesin paralel. Penelitian ini dilakukan dengan menerapkan pendekatan heuristic metode LPT (Longest Processing Time) dan pendekatan metaheuristic dengan menggunakan metode Cross Entropy yang dikombinasikan dengan Genetic Algorithm yang dikenal dengan sebutan CEGA (Cross Entropy Genetic Algortihm). Algoritma metaheuristic diterjemahkan ke dalam Bahasa pemograman Matlab. Hasil perbandingan kedua metode menunjukkan bahwa kedua metode usulan yaitu LPT dan CEGA lebih baik dari metode eksisting dan memiliki efisiensi sebesar 7.94%.

8 October 2019 in FLYWHEEL : Jurnal Teknik Mesin Untirta
Verified
Journal Article
Open access
PDF file
AIAde Irman
Ade Irman
YMYusraini Muharni
Yusraini Muharni
AAArliannur Arliannur
Arliannur Arliannur
Proses produksi dalam sebuah perusahaan seringkali mengalami terjadi gangguan salah satunya adalah kerusakan mesin. Gangguan ini dapat teratasi jika perusahaan melakukan kegiatan perawatan yang optimal. Perawatan yang optimal dilakukan guna menjamin agar mesin dapat beroperasi dengan baik. Salah satu upaya yang dilakukan agar kegiatan perawatan menjadi optimal yaitu dengan membuat kegiatan preventive maintenance. Penelitian ini dilakukan pada salah satu perusahaan yang memproduksi tinplate. Perusahaan ini mengalami downtime sebesar 144 jam pada salah satu mesinnya. Penelitian ini menggunakan metode reliability block diagram untuk menentukan keandalan mesin Electrolitic Tinning Line (ETL) lalu dibuatkan penjadwalan preventive maintenance untuk setiap komponen kritis menggunakan simulasi monte carlo. Pada pengolahan data dihasilkan periode waktu perawatan diantaranya circulation – piping setiap 31 hari, roll – bearing/sol plate setiap 31 hari, roll – timming belt setiap 23 hari, roll – seal setiap 23 hari, circulation – nozzle setiap 2 hari, polisher setiap 23 hari, roll – universal joint setiap 33 hari, circulation – filter setiap 21 hari, roll – rotaty joint setiap 25 hari, roll – leveling setiap 48 hari, hydraulic – valve setiap 86 hari, pneumatic – piping setiap 42 hari, circulation – seal setiap 140 hari, dan circulation – valve setiap 14 hari. Dari hasil preventive maintenance yang dibuat, availability preventive maintenance lebih besar dari availability corrective maintenance maka dengan demikian penerapan preventive maintenance yang diusulkan tidak mengurangi availability dari mesin Electrolitic Tinning Line (ETL).