An integrated problem of optimising the operations at a commercial bulk material port terminal is studied in this paper. We simultaneously optimise the stockyard operations and rake schedule for outbound cargo, in conjunction with the arriving vessels and the status of the stockyards at the port. A mixed integer linear programming model for the problem is developed while incorporating the inherent complexities of the integrated model. To solve the real-life instances, two heuristic methods are proposed specifically for the considered problem. Firstly, genetic algorithm coupled with a greedy heuristic and later, block-based evolutionary algorithm (BBEA) is employed. After applying both techniques, we obtain the optimised schedule for loading of rakes and allotment of stockyard space for vessels as well as rakes at the terminal. Finally, we test the results of both models in three traffic scenarios between themselves and with real-life data from a port situated along the Eastern coast of India. The study resulted in significant reduction of turnaround time for rakes at the port terminal, which in turn lead to monetary savings. The model also automates the day to day operational decision-making at the port.
This study investigates the quay crane allocation problem with respect to vessel assigned to a particular discrete berth at a bulk material handling port. In the proposed model,vessels at the anchorage are berthed on a First in, first out (FIFO) basis at the port, and then the quay cranes are assigned to the berth dynamically before berthing and during unloading of the vessel. To solve the model, we used the Block Based Genetic Algorithm (BBGA) and Genetic Algorithm (GA). Computational study is conducted using the real data provided by a port located on theEastern Coast of India.