The events industry is a project-based industry where sustainable development has been of ever-increasing interest over the last decade. In this regard, the importance of managing risks and delivering quality outcomes in corporate events and the events industry in general cannot be overstated. This paper aims to contribute to the enhancement of project management processes and quality of corporate events, with a focus on risk management. For this purpose, a set of semi-structured interviews with event managers was conducted and thematic analysis was used to qualitatively analyse the research data gathered. Data analysis resulted in the development of a set of tools and methods that have the potential to assist corporate event managers in the project risk management process. This set comprises of a work breakdown structure (WBS) template, a risk breakdown structure (RBS), and a set of risk treatment and mitigation strategies for corporate events. These tools are innovative in the sense that they are based on and correspond to the phases of the event life-cycle rather than individual management domains, have not been developed in unison before, and can be utilized collectively for greater benefits realization.
In today's rapidly evolving management world, the scheduling of multiple projects where each one's execution depends on another's successful completion, is of great importance. This paper presents a hybrid meta-heuristic algorithm composed of an external Genetic Algorithm (GA) and an encapsulated Ant Colony Optimization (ACO) algorithm for the flexible resource constrained multi-project scheduling problem (MPFRCPSP). The proposed idea is grounded on the concept of prioritizing the sub-projects' scheduling based on: a) the number of external (to other sub-projects) relations and b) the resource requirements as compared to the resource shortage for each resource type and each sub-project. The implementation uses the Genetic Algorithm to deal with the classification and prioritization of the projects to be scheduled and the inner ACO algorithm, to perform the activity list optimization for each project. The proposed method was validated using a consistent number of PSP Lib[l] data sets.