Sayyad Nojavan

Dr. Sayyad Nojavan

Department of Electrical Engineering, University of Bonab, Bonab, Iran
orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2017 in Energy Conversion and Management
Verified
Journal Article
Closed access
MVM.J. Vahid-Pakdel
M.J. Vahid-Pakdel
SNSayyad Nojavan
Sayyad Nojavan
Behnam Mohammadi-IvatlooBehnam Mohammadi-Ivatloo
Behnam Mohammadi-Ivatloo
KZKazem Zare
Kazem Zare


1 July 2016 in Energy Conversion and Management
Verified
Journal Article
Closed access
AGAfshin Najafi Ghalelou
Afshin Najafi Ghalelou
AFAlireza Pashaei Fakhri
Alireza Pashaei Fakhri
SNSayyad Nojavan
Sayyad Nojavan
MMMajid Majidi
Majid Majidi
HHHojat Hatami
Hojat Hatami


1 March 2017 in Solar Energy
Verified
Journal Article
Closed access
MMMajid Majidi
Majid Majidi
SNSayyad Nojavan
Sayyad Nojavan
NENaser Nourani Esfetanaj
Naser Nourani Esfetanaj
ANAfshin Najafi-Ghalelou
Afshin Najafi-Ghalelou
KZKazem Zare
Kazem Zare

1 March 2015 in IET Generation, Transmission & Distribution
Verified
Journal Article
Open access
PDF file
SNSayyad Nojavan
Sayyad Nojavan
Behnam Mohammadi-IvatlooBehnam Mohammadi-Ivatloo
Behnam Mohammadi-Ivatloo
KZKazem Zare
Kazem Zare
In restructured electricity markets, the electricity retailers try to obtain the consumers' electricity demand at the minimum cost of different resources such as self‐generating facilities, bilateral contracts and pool market purchases. Hence, more attention should be paid to the demand response programs (DRPs) which aim to electricity procurement cost reduction. Owing to the uncertain nature of pool prices and the price fluctuation in the pool markets, the uncertainty modelling is inevitable for retailers. In this study, a robust optimisation approach is proposed for decision making of electricity retailers. Meanwhile, considering the effect of DRP on total procurement cost, an optimal bidding strategy is proposed of electricity retailers with the time‐based model of DRP in the electricity market. For this purpose, a collection of robust mixed‐integer linear programming (RMILP) problem should be solved in the proposed method. Rather than using the forecasted prices as inputs, the upper and lower limits of pool prices are considered for the uncertainty modelling. The range of pool prices is sequentially partitioned into successive nested subintervals, which permits formulating the RMILP problems. The results of these problems give sufficient data to obtain an optimal bidding strategy for electricity retailers considering DRP. Detailed analysis is performed to delineate the proposed method.