The article deals with the principle of using gyrotheodolite in connection and orientation measurements. It describes orientation measurements with gyrotheodolite, provides basic information about the device and explains how it works. The first part describes gyrotheodolite and methods of determining astronomical true north. The workflow for measurement and subsequent data processing is described below. In the second part, two orientation measurements are described and processed. Finally, the accuracy achieved and the possibility to use the device for activities other than mine measurement are assessed. Keyword : connection and orientation measurements, basic orientation line, gyrotheodolite, gyro station, instrument constant, mining measurement baseline, astronomical north This work is licensed under a Creative Commons Attribution 4.0 International License.
While Pavement Management Systems are commonly used for effective roadway inspection and maintenance, similarly efficient solutions for sidewalk assessment remain underdeveloped. This study introduces a semi-automated method for sidewalk evaluation based on a mobile device equipped with a 2D LiDAR scanner, and image processing techniques. The proposed approach includes the design of a cost-effective sensor-equipped vehicle, data acquisition and processing workflows, elevation barrier detection methods, and a comprehensive validation framework. The system integrates data from a 2D LiDAR scanner, wheel encoders, and a localization unit to generate a local digital elevation model (DEM) via constrained spline interpolation. Barrier detection is performed using both a focal range thresholding method and a machine learning-based segmentation approach. Validation is conducted using high spatial resolution reference DEMs (1 mm and 2 cm) derived from Terrestrial Laser Scanning across two pilot sites. Detection quality is evaluated using three key metrics: Coefficient of Area Correspondence, Identification Accuracy, and Point Accuracy. The focal range method achieved overall accuracies of 91% and 92% at the two test sites, while the machine learning approach reached only 36% and 38%. Spatial coincidence indicators revealed reduced agreement, particularly due to shape distortions and segmentation inconsistencies; however, Point Accuracy proved to be the most robust validation metric. The results confirm that the proposed 2D LiDAR-based system and focal range method are effective in identifying significant elevation barriers on sidewalks. The compact design, low operational cost, and ease of use make the solution suitable for widespread deployment in municipal infrastructure assessment.
The purpose of depth measurement is to bring the altitude from the surface to the connected horizon (level) by means of a vertical mine. Points, for which the height is determined in this way, are part of the fundamental mining vertical control, and their height should therefore be determined as accurately as possible. There are several ways of this measurement and the temperature has influence on accuracy of each of them. The paper is dedicated to evaluation of influence of temperature, applying results of height connection measurement carried out at Karviná mine. Two measurements were performed in ČSA 2 shaft and the other in shaft Mír 5 of Darkov mine in Ostrava-Karviná Coal District, CZE. Height connection measurement by a vertical mining work was done in two ways: using the depth tape and using the electro-optical distance meter.
18 February 2020 in Arabian Journal of Geosciences
The purpose of depth measurement is to bring the altitude from the surface to the connected horizon (level) by means of a vertical mine. Points, for which the height is determined in this way, are part of the fundamental mining vertical control, and their height should therefore be determined as accurately as possible. There are several ways of this measurement and the temperature has influence on accuracy of each of them. The paper is dedicated to evaluation of influence of temperature, applying results of height connection measurement carried out at Karvina mine. Two measurements were performed in ČSA 2 shaft and the other in shaft Mir 5 of Darkov mine in Ostrava-Karvina Coal District, CZE. Height connection measurement by a vertical mining work was done in two ways: using the depth tape and using the electro-optical distance meter.