Container ships are becoming larger and larger in recent years, requiring more evident assurance of the structural safety. To achieve this, it is essential to grasp actual stress history experienced by the ship structures to facilitate efficient design and maintenance, and to use them for optimal operation of the ship. To perform accurate estimation of these stress histories, it is important to precisely estimate the sea state which the ship is actually encountering. In this study, the authors studied a new method to estimate directional wave spectra using measured ship responses and discussed the following three cases. The first one is the combination of two components, vertical bending stress and horizontal bending stress. The second one is the combination of three components, vertical bending stress, horizontal bending stress and double bottom bending stress. The last one is the combination of three components of ship motion (pitch, roll and heave). The estimated sea states are compared with the ocean wave hindcast database and radar data, and then, accuracy and selection of appropriate combination of the responses are discussed.
Production planning is an important factor for production efficiency in the shipyard. However, planning is currently executed by manual operations based on the experience of field workers because of the complexity of the target shipbuilding project. This paper proposes a method of creating a realistic production plan automatically by modeling the complex shipbuilding project and using the developed process simulation. Specifically, we propose a method to represent the target shipbuilding process by four system models—Product, Workflow, Workplace, and Team. By executing the developed process simulation using system models, a Gantt chart can be created as a realistic production plan. From the case studies of a virtual shipyard manufacturing a ship hull block, it can be said that the proposed method can create a good production plan considering the complexity of the target shipbuilding project. In addition, the proposed method can evaluate the bottleneck of the target shipyard and the re-allocation plan for workers quantitatively.