Purpose: – The purpose of this paper is to address current knowledge gaps in off-site sub-element fabrication efficiency factors, by identifying an explicit relationship between productivity and employee empowerment.Design/methodology/approach: – The research is based on two engineering fabrication-yard case studies that investigate both qualitatively (via analysis of semi-structured interviews that incorporate a five-point Likert scale, with fabrication-product stakeholders), and also quantitatively (via assessment using SPSS statistical analyses to determine significance and trends in the data-set) the relationship between empowerment and productivity.Findings: – The results reveal a positive linear relationship in off-site construction between “employee empowerment factors” and, explicitly fabrication-yard “productivity-levels”. An especially strong and significant positive correlation is found to exist in resource development, worker involvement, process improvement, and task recognition as they refer to off-site construction productivity.Practical implications: – Most academic studies of off-site construction remain largely anecdotal and lack an empirical objective study; as a result, this (fabrication-yard) case-study research provides a useful approach to measure empirically the link between employee empowerment and productivity of off-site construction.Originality/value: – Employee empowerment in the construction industry has long been a focus of analyses; however, there remains a lack of consensus and very few studies into the direct relationship between employee empowerment on the one-hand, and productivity in off-site construction on the other-hand. It is argued here that the on-going new research undertaken in the present study will go beyond subjective opinion towards objective measurement of actual performance in off-site construction.
1 July 2017 in Journal of Construction Engineering and Management
A significant number of offshore oil and gas installations in the U.K. North Sea have either exceeded or are approaching the end of their designed economic life. Operators and contractors are confronted with an array of challenges that hinder the cost-effective and safe completion of decommissioning projects. The costing and technological challenges that confront the oil and gas industry are identified using a series of semistructured interviews. One of the most prominent challenges identified was the inability to reliably estimate the volume and cost of work to be undertaken. This is exacerbated by a supply chain with limited capacity and experience in executing decommissioning projects in this fledgling sector in the oil and gas industry. As a result of the analysis that is undertaken, it is recommended that an industrywide decommissioning forum be established to facilitate the sharing of experience and knowledge, particularly with regard to cost information so that operators and contractors can ameliorate the planning and management of the decommissioning process.
13 September 2017 in Production Planning & Control
There has been limited research that has examined how the public sector can guarantee their major capital projects are delivered within budget. A Strategic Asset Management Framework (SAMF) developed by the Western Australian State Government, was implemented that ensured their major capital projects were delivered within 5% of their budget. Interviews were conducted with stakeholders who had participated in the delivery of capital projects using the SAMF to understand how it had been used to successfully deliver projects. The interviews highlighted the importance of the SAMF in addressing optimism bias and strategic misrepresentation with the use of independent auditors. The research provides invaluable insights from practice that have been used to control and manage the capital expenditure of assets. Such knowledge is pivotal for ensuring strides are made forward to addressing the cost growth phenomenon that continues to plague major capital projects.
Growing demand for road infrastructures and accompanying environmental footprint calls for the replacement of pavement materials with recycled options. The complexities in real-world usability are dependent upon project-specific characteristics and are affected by budgetary constraints of local governmental agencies, material applicability, and climatical conditions. This study conducts a comprehensive lifecycle cost analysis (LCCA) of an urban highway section “E10” in the hot Middle Eastern climate of Abu Dhabi, where virgin asphalt usage is dominant, using actual cost data under multiple scenarios and recycled construction waste (RCW) usage across aggregate layers and recycled asphalt pavement (RAP) across wearing, binder, and asphalt base courses. Blast furnace slag as partial cement replacement for road concrete works is also analysed. Impacts across all lifecycle stages from initial earthworks and construction to routine maintenance and operation were compared. Results found that cost of sustainable construction is lower. Cost reduction was highest for RAP and RCW usage, particularly when the usage was accumulated. The optimum cost scenario used 25% RCW in the sub-base, 80% RCW in the unbound base, 25% warm-mix asphalt (WMA) RAP in the asphalt base, 15% warm-mix RAP in the binder and wearing courses, and 65% slag for concrete roadworks and resulted in USD 2.6 million (15%) cost reduction over 30 years from 2015 to 2045.
In this study a novel microsimulation-based methodology for environmental assessment of urban systems is developed to address the performance of autonomous mass-mobility against conventional approaches. Traffic growth and microsimulation models, calibrated using real data, are utilised to assess four traffic management scenarios: business-as-usual; public bus transport case; public-bus rapid transit (BRT) case; and, a traffic-demand-responsive-autonomous-BRT case, focusing on fuel energy efficiency, headways, fleet control and platooning for lifecycle analysis (2015–2045) of a case study 3.5 km long 5-lane dual-carriageway section. Results showed that both energy consumption and exhaust emission rates depend upon traffic volume and flow rate factors of vehicle speed-time curves; acceleration-deceleration; and braking rate. The results measured over-reliance of private cars utilising fossil fuel that cause congestions and high environmental footprint on urban roads worsen causing excessive travel times. Public transport promotion was found to be an effective and easy-to-implement environmental burden reduction strategy. Results showed significant potential of autonomous mass-mobility systems to reduce environmental footprint of urban traffic, provided adequate mode-shift can be achieved. The study showed utility of microsimulations for energy and emissions assessment, it linked bus network performance assessment with environmental policies and provided empirical models for headway and service frequency comparisons at vehicle levels. The developed traffic fleet operation prediction methodology for long-term policy implications and tracking models for accurate yearly simulation of real-world vehicle operation profiles are applicable for other sustainability-oriented urban traffic management studies.