In Wastewater Stabilization Ponds (WSPs), baffle walls (BWs) have the dual benefit of reducing area requirements and increasing contaminant removal efficiency up to a certain threshold. However, this advantage is mitigated by the increased demand for construction materials, highlighting the need for optimization. Effectively optimizing WSPs to suit diverse climatic regions can substantially alleviate nationwide wastewater treatment challenges. This study focuses on optimizing WSPs across seven distinct climatic regions in Turkey. In the initial phase, a comprehensive analysis was conducted using design spreadsheets for the WSPs to determine the best configuration based on traditional methodology (TM). The results demonstrated a significant decrease in WSPs area and hydraulic retention time (RT), validating the effectiveness of BWs provision. However, this approach requires additional time and effort. Subsequently, mathematical modeling (MM) was used to further reduce the time required for the optimization process. Using the interior-point algorithm in MATLAB and the generalized reduced gradient (GRG) algorithm in MS Excel Solver, both algorithms within MM effectively decreased the WSPs area and RTby approximately 10%, while decreasing the required concrete volume by approximately 5% compared with TM. As other algorithms may yield better optimization, they can be investigated by developing specialized software for WSPs. Doi: 10.28991/CEJ-2023-09-11-014 Full Text: PDF
1 January 2021 in Mehran University Research Journal of Engineering and Technology
Wastewater management is one of the biggest challenges in the world due to increase in population and industrialization. In Faisalabad (FSD), wastewater treatment is being done through Wastewater Stabilization Ponds (WSPs) at Chokera, which is one of the most economical methods of Wastewater Treatment (WWT). Various parameters were examined to check wastewater treatment efficiency of the ponds under diverse climatic conditions. These included Biochemical Oxygen Demand (BOD), pH, Chemical Oxygen Demand (COD), Turbidity, Copper, Total Solids (TS), Total Dissolved Solids (TDS) and Lead. Six locations which were selected for monitoring treatment efficiency, included inlet and outlet of treatment plant, influent of anaerobic ponds, effluent of anaerobic ponds, effluent of facultative ponds, and Pharang drain before and after blending with treated sewage. The testing was performed in two seasons (i.e. Winter 2015 and Summer 2016) in Environmental Engineering Laboratory, Department of Civil Engineering, The University of Lahore, Pakistan. BOD5 removal efficiency of the treatment plant was found 30.08% in winter and 51.74% in summer against designed value of 90% removal. Most of the parameters of the effluent were not meeting the Punjab Environmental Quality Standards (PEQS). The reasons of low efficiency are; variation in climatic conditions (i.e. less solar heat intensity, wind speed and ceased microbial activity in winter), lack of funds by government, increased population, mixing of industrial sewage with domestic sewage and less attention being paid to maintain the performance of Ponds. The study was carried out to assess and compare the efficiency of treatment plant with PEQS in two climatic conditions.
1 January 2023 in Mehran University Research Journal of Engineering and Technology
This research work proposes a mathematical optimization model for constructing two ponds (1. Facultative pond and 2. Maturation pond) provided in series. The model uses concrete volume as its objective minimization function. There were two decision variables; the first was the detention time (DT) and the second in the list was the number of provided baffle walls (NBW) in both ponds. The constraint parameters include fecal coliforms and biochemical oxygen demand (BOD5). The model was applied with the help of an Add-Ins of MS Office: Excel solver. The generalized reduced gradient algorithm was utilized in the solver (GRG). Before applying the mathematical optimization model, ponds were designed with the conventional method and then using optimized values of the variables. A comparison of the findings reveals that a 13.79 percent reduction in the DT, an 11.55 percent reduction in the area, and a 7.19 percent reduction in the volume of concrete occurred. The reduction values mentioned above are significant since these systems' fundamental drawback is the area's requirement. In addition, sensitivity analyses of the objective function and the removal of pollutants are also provided. The model described above is sensitive to variations in the parameters. Both analyses demonstrated that the effluent characteristics comply with the class-B irrigation standards in Turkey. It is advised to do more optimization studies for WSPs with the help of other algorithms and tools available in the literature for distinct wastewater treatment plants.
30 September 2022 in Environmental Research and Technology
Natural systems are a cost-effective way to clean wastewater from small communities. This paper aims to use an optimization technique to minimize the volume of concrete needed to construct a facultative pond provided within a series of three ponds. A nonlinear constrained optimization model was written and then solved using one of the Add-Ins of MS office. The add-in used was Excel Solver, and the algorithm was generalized reduced gradient (GRG). Before applying the optimization model, wastewater stabilization ponds (WSPs) were de-signed using various configurations and arrangements. The best possible configuration that gave minimum area and hydraulic detention time was selected for the study area. Afterward, the optimization model was applied that further reduced the area by 11.46 %, hydraulic detention time by 11.47%, and concrete volume by 6.94% compared to the traditional approach. In both methods, effluents satisfy the Turkish class-B stand-ards for irrigation. It is recommended that a small-scale application of the model be made to compare the results before applying it on a large scale.