Jingyu Shi

Dr. Jingyu Shi

Commonwealth Scientific and Industrial Research Organisation, Canberra, Australian Capital Territory, Australia

Research Focus & Metrics

Academic Career Length

34Years (1993-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 October 2023 in Processes
Verified
Journal Article
Open access
PDF file
XZXin Zhou
Xin Zhou
XZXingdong Zhao
Xingdong Zhao
QQQingdong Qu
Qingdong Qu
JSJingyu Shi
Jingyu Shi
A reliable design of stopes is critical to ensure both safety and efficiency in mining operations. The evolving mining methods and technologies as well as increasing mining depth dictate the need to continually improve stope designs. This paper presents a comprehensive review in order to compare and consolidate various stope design methods. This review covers various aspects of stope design, including design principles, factors to consider, and the diverse range of design methods available. The results led to the classification of various methods encompassing engineering analogies, fundamentals, numerical simulations, and industrial tests. Of particular significance, the review furnishes detailed insights into the research conducted on each method, as well as each method’s practical performance in engineering applications. Furthermore, the review highlights the inherent limitations in current design methods and suggests potential avenues for future research. Finally, by comprehensively considering the functional roles and advantages of each design method, it overcomes the limitations of relying solely on a single method for stope structural parameter design, and a general process is proposed.

23 January 2024 in Tunnelling and Underground Space Technology
Verified
Journal Article
Open access
BSBaotang Shen
Baotang Shen
MKManoj Khanal
Manoj Khanal
JSJingyu Shi
Jingyu Shi
Dirk MallantsDirk Mallants
Dirk Mallants

26 March 2022 in Energies
Verified
Journal Article
Open access
PDF file
JSJingyu Shi
Jingyu Shi
Baotang ShenBaotang Shen
Baotang Shen
MKManoj Khanal
Manoj Khanal
Dirk MallantsDirk Mallants
Dirk Mallants
The safety of high-level radioactive waste disposal has been studied across the world considering mined geologic repositories. Here, we introduce large-diameter, deep borehole disposal as one of the potential solutions for small volumes of long-lived intermediate-level waste (ILW). The short- and long-term stability of deep disposal boreholes is critical for environmental safety and public health. In this paper, we first use a recently revisited extensional strain criterion for fracture initiation and apply analytical solutions of a two-dimensional stress model to predict the fracturing region around a 2 km deep and 0.7 m diameter disposal borehole. Analytical solutions of fracture initiation are compared with results from the numerical simulator FRACOD, while the latter model also predicts dynamic effects such as fracture propagation. Both analytical and numerical methods predicted similar fracture initiation characteristics around the minor horizontal compressive stress springline, consistent with literature data. Numerical results showed deeper fracturing zones than those predicted by analytical solutions, mainly because the analytical predictions provide static snapshots under specific given conditions, while the numerical model calculates additional dynamic effects of fracture propagation. Including stress dynamics is shown to further weaken the rock around the borehole. At the bottom plane of the borehole, three-dimensional numerical simulations showed the development of fracturing zones around the major horizontal compressive stress springline. Borehole stability analyses are essential to plan the safe operation of drilling operations while also giving insights as to what borehole depths are more prone to fracturing and hence potentially less suitable as a waste disposal zone.

23 May 2022 in Energies
Verified
Journal Article
Open access
PDF file
QQQingdong Qu
Qingdong Qu
JSJingyu Shi
Jingyu Shi
AWAndy Wilkins
Andy Wilkins
Coal seam permeability is a critical factor in coal seam gas extraction and gas outburst control. In Australian coal mines, coal seam permeability is normally estimated using a packer test or drill stem test. In contrast, Chinese coal mines generally estimate a parameter called the “gas conductivity coefficient” by measuring natural gas flow rates from an underground borehole drilled through a coal seam. With this method, it has been frequently reported that the permeability of many Chinese coal seams is between 0.0001 mD and 0.01 mD, which is extremely low compared to that of Australian coal seams (1–100 mD). It is therefore natural to wonder how closely the Chinese method measures permeability. Resolving this question will allow knowledge and experience in outburst management to be shared between Australian and Chinese coal mines. This question is investigated by the numerical modelling of gas desorption and flow through a seam of known permeability and by using the model’s borehole gas flow rate to estimate the permeability using the Chinese method. A total of 126 simulations were run with various input reservoir parameters. The results suggest that the Chinese method estimates permeability at an accuracy of 85% to 100%, which is adequate for mine pre-drainage design and outburst control. For the high diffusion rate (e.g., high gas content and short desorption time) and low Darcy flow rates (e.g., low permeability), these errors are reduced.

27 March 2025 in Minerals
Verified
Journal Article
Open access
PDF file
MKManoj Khanal
Manoj Khanal
JSJingyu Shi
Jingyu Shi
QQQingdong Qu
Qingdong Qu
Tailings from metalliferous ore processing are stored in tailing-storage facilities. Fresh tailings contain high content of water, and this may contribute to the instability of the facilities. One way of depositing tailings into the facilities is to lay a layer of fresh tailings on top of previously deposited tailings and let the newly deposited tailings settle down for some time before another layer is laid. This paper utilises GeoStudio’s software packages SEEP/W, SLOPE/W, and SIGMA/W to analyse the effects of such deposition processing on the stability of a tailing dam. It is found that, generally, as more layers are added, the factor of safety of the upstream slope surface of the dam embarkment increases, while the factor of the safety of the downstream slope surface is not affected. The thickness of the layers does not affect the factor of safety of the downstream slope surface. The factor of safety of the upstream slope surface is affected by the thickness of the layers: the thicker the layers, the higher the factor of safety. Hydraulic conductivity is one of the factors that influence the settlement times of the deposited tailing layers.

5 July 2019 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
BSBaotang Shen
Baotang Shen
JSJingyu Shi
Jingyu Shi
NBNick Barton
Nick Barton