Jiming Cao

Prof. Jiming Cao


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
JCJiming Cao
Jiming Cao
CLCong Liu
Cong Liu
GWGuangdong Wu
Guangdong Wu
Xianbo ZhaoXianbo Zhao
Xianbo Zhao
ZJZhou Jiang
Zhou Jiang
This study developed and tested a model, which involves the effects of work–family conflicts on job satisfaction and job performance of construction professionals, with a focus on the mediating role of affective organizational commitment. A structured questionnaire survey was conducted among construction professionals in China, resulting in 317 valid responses. The results, generated from structural equation modelling, revealed two interrelated dimensions of work-family conflicts, work’s interfering with family life and family life’s interfering with work. We found these two types of work-family conflicts directly, negatively affected affective organizational commitments and job satisfaction but not job performance. Additionally, affective organizational commitment positively affected job satisfaction and job performance, and mediated the effects of work–family conflicts on job satisfaction. This study advances our understanding of how or why work–family conflicts produce dysfunctional effects on employees’ job outcomes in the context of construction projects.

CLCong Liu
Cong Liu
JCJiming Cao
Jiming Cao
PZPeng Zhang
Peng Zhang
GWGuangdong Wu
Guangdong Wu
This study explored the effects of work-to-family conflict on job burnout and job outcomes in the construction industry, focusing on the moderating effects of affective commitment. Based on the conservation of resources theory, a theoretical model introducing affective commitment as a moderating variable was established. A structured questionnaire survey was then implemented among construction professionals in China. A total of 376 valid responses were obtained. Structural equation modeling was used to analyze the valid data. The results revealed the following: (i) work-to-family conflict has a significant positive impact on job burnout, but a significant negative impact on job satisfaction and job performance; (ii) job burnout negatively affects job satisfaction and job performance; (iii) affective commitment negatively moderates the effects of work-to-family conflict on job burnout. This study provides a reference for construction companies to manage work-to-family conflict and job burnout of employees, while also improving their affective commitment and job outcomes.

JCJiming Cao
Jiming Cao
CLCong Liu
Cong Liu
YZYubin Zhou
Yubin Zhou
Kaifeng DuanKaifeng Duan
Kaifeng Duan
This study explored the effects of work-to-family conflict on job burnout and project success in the construction industry. First, a theoretical model with affective commitment as a moderating variable was developed according to the conservation of resources theory. A structured questionnaire survey was then performed with Chinese construction professionals, with 309 valid responses received. In the valid data, the proportion of male construction professionals is 73% and that of female construction professionals is 27%. The analysis of the valid data used structural equation modeling. The results indicate that: (i) work-to-family conflict has a positive and significant effect on job burnout, and a negative and significant effect on project success; (ii) job burnout negatively affects project success; (iii) affective commitment negatively moderates the relationship between work-to-family conflict and job burnout. This study extends the existing body of knowledge on work-to-family conflict and helps us to better understand the functional and moderating roles of affective commitment in the context of construction projects. Furthermore, this study provides theoretical guidance and a decision-making reference to help construction enterprises manage the work-to-family conflict and job burnout of construction professionals and advance their levels of affective commitment.

Verified
Journal Article
Open access
PDF file
LDLiuqun Dong
Liuqun Dong
JCJiming Cao
Jiming Cao
LXliu xian
liu xian
With the rapid development of urbanization around the world, the sea-level-rise problem is gaining more and more attention in the 21st century. Sea-level rise is the result of a combination of climate-related factors, structural factors and human activities. Recent studies related to the contributions of these factors to sea-level rise are reviewed and analyzed in this paper. The results suggest that the melting of glaciers and ice sheets have contributed the most to sea-level rise and will continue to be the dominant factor in sea-level rise for the following decades. As sea-level rise becomes an increasingly serious problem, geological disasters related to sea-level rise are also gaining more attention. To better understand the effect of sea-level rise on geological disasters, relevant issues including storm surges, seawater intrusion, the loss of coastal wetland, seismicity, seismic liquefaction and submarine mass failure are further reviewed and highlighted. In response to the risks of those disasters caused by sea-level rise, some disaster mitigation measures are proposed, and in the end, the quantitative disaster assessment concept based on resilience is introduced to the coastal urban system, to assess its ability to resist and recover from geological disasters due to the sea-level rise.

7 November 2022 in Buildings
Verified
Journal Article
Open access
PDF file
HZHui Zeng
Hui Zeng
JCJiming Cao
Jiming Cao
QFQun Fu
Qun Fu
Megaprojects have been redefined as dynamic collaboration networks, which are characterized by the strength of the ties between teams. In China, megaprojects have long been criticized for low productivity, poor project implementation processes, and inter-team confrontation. Few studies in the construction domain have explored the relationship between the strength of ties, inter-team conflict, and project success. This research aims to investigate the relationship between the strength of ties, inter-team conflict, and project success in megaprojects. Strong ties and weak ties reflect the strength of ties. Inter-team conflict is measured by task-related conflict and relationship-related conflict. A questionnaire survey was conducted on Chinese megaprojects, and 306 questionnaires were collected. The data were analyzed by a structural equation model. The results indicate that strong ties positively impact task-related conflict while negatively impacting relationship-related conflict. Weak ties positively impact inter-team conflict. Task-related conflict and relationship-related conflict have positive and negative effects on project success, respectively. The effect of the strength of the ties on a project’s success is mediated by conflict. This study adds to existing research on the strength of ties and emphasizes the significance of megaproject network governance. The results reveal the constructive effects of the strength of ties and task-related conflict, as well as the non-constructive effects of relationship-related conflict. This provides a reference for megaproject managers to implement project governance.

28 March 2024 in Buildings
Verified
Journal Article
Open access
PDF file
CLCong Liu
Cong Liu
HZHui Zeng
Hui Zeng
JCJiming Cao
Jiming Cao
Prefabricated construction (PC) is considered to be a low-carbon construction method. Implementing prefabricated construction projects (PCPs) requires multiple industry organizations to participate and collaborate. As different PCPs are initiated and implemented, industry organizations will gradually gather into a complex and evolving collaborative network at the industry level based on specific collaboration relationships with different project backgrounds. The evolution of the collaborative network is related to how industry organizations interact with each other, and how PC-related knowledge and innovation has spread among organizations in the long term. However, the laws of network evolution and the micro effects that drive network evolution are still unknown. This study analyzes 236 prefabricated construction projects (PCPs) in Shanghai during 2015–2023, using the stochastic actor-oriented models (SAOM) method to explore how the macro structure of project-based inter-organizational collaborative networks for prefabricated construction (PC) technology implementation evolves over time, and how micro effects jointly support the evolution of the networks. The macro-level descriptive analysis of the network indicates that the collaborative network has become increasingly dense over time and continues to show a core–peripheral structure, with a small number of super-connected organizations. The micro-level SAOM analysis further reveals that the evolution of the collaborative network structure is driven by structure-based preferential attachment and geographic proximity effects, as well as attribute-based ownership similarity effect. This exploratory effort applies a network dynamics model to investigate the micro mechanism of the evolution of inter-organizational collaboration. The research results provide theoretical guidance and decision-making references for PC industry organizations to develop efficient network action strategies. In addition, it can help industry managers to formulate appropriate network management strategies.