Three types of payments confront in business dealings viz. advance, cash and credit. A cash payment is ubiquitously practiced, while a credit payment scheme escalates sales and advance payment technique is implemented to avoid cancellation of orders. These are recognized as advance-cash-credit (ACC) payment scheme which is conventional in business transactions. By implicating ACC the aim is to determine optimal pricing and ordering policies. Inventory items observes quadratic demand being sensitive to unit selling price. Promising concavity of the profit function for both selling price and cycle time is posed numerically. Managerial insights are revealed as a concluding note.
1 January 2017 in Uncertain Supply Chain Management
Due to uncertainty in economy, business players examine different ways to ensure the survival and growth in the competitive atmosphere. In this scenario, the use of effective promotional tool and co-ordination among players enhance supply chain profit. The proposed model deals with the effect of quantity discount on an integrated inventory system for constantly deteriorating items with fix life time. We use advertisement and quantity discount to accelerate stock dependent demand and further, the offered preservation technology for controlling deterioration rate. The model is validated numerically, and the sensitivity analysis for critical supply chain parameters is carried out. The results can be used in the decision making process of the supply chains associated with the supply of cosmetic, tinned food, drugs, and other FMCGs.
2 November 2012 in Journal of Petroleum Exploration and Production Technology
In this paper, a mathematical model is developed to study crude oil extraction from oil wells. Due to advancement in technical, procedural and reservoir management the estimated lifetime and subsequently field hardware utilization has increased. Continuous high-quality and efficient production can lead to complacency about the integrity of the wellhead, but can also cause lack of focus on routine maintenance. Lack of critical component maintenance and over exposure can take its toll on mechanical assemblies, increasing the likelihood of production downtime caused by equipment failure. In extreme cases it may also lead to an emergency shutdown. The objective of the paper is to optimize the total cost per unit time in light of critical factors which involve spills or leakage, system failure and maintenance cost for optimum extraction. The model is valid with empirical data and sensitivity analysis is carried out.