For ensuring safety and efficiency during the construction of deep engineering, it is essential to explore the failure mode of the surrounding rock mass under dynamic disturbance and high geo-stress. We conducted true triaxial load tests for rock-like material with a preexisting circular hole, and monitored the acoustic emission (AE) signal during the whole test. The result demonstrates the evolution characteristics of damage and failure mode with different cyclic dynamic load amplitudes and intermediate principal stress. With the increase in cyclic dynamic load amplitude or the decrease in intermediate principal stress, the failure source mainly occurs at the two horizontal side walls of the surrounding rock where the failure patterns change from the slabbing to wall caving and, finally, to rockburst. The former failure mode can actually serve as an important precursor for the latter. Based on such mechanisms, the precursor can be indirectly detected in forms of AE signal released by microcracking. The research can provide a reliable guidance for the rock stability control and faithfully forecasting the larger-scale failure during the excavation of deep circular cavern.
Original fracture structures always present discontinuity in the real rock mass, and many invisible fractures hide inside the rock mass, which may cause serious engineering safety issues. To mimic the true 3D fracture structures through the experimental method, the gypsum rock-like samples containing both 2D through-type and 3D internal-type preset flaws are prepared, and multiple sets of inclination angles of the twin parallel flaws are set in the test. By applying the AE and DIC monitoring technologies during the uniaxial compression tests, the main results are as follows: (1) The flaw inclination angle presents a direct influence on the surface cracks distribution, maximum principal strain field, and the density of secondary failure in the middle rock; (2) AE events initially distribute around the internal 3D preset flaw, while the gradient inclination angle shows a slight impact on the events’ location before reaching the UCS status of samples; (3) mutations in b-values and S values can serve as evidence for predicting local damage, and the final failures quickly form at various scales and energy levels; (4) when the statistical analysis grid is divided sufficiently, the data window width and moving step length have little impact on the evaluation results, while the recommended bin width of event magnitude is 0.5 or 1.0.
Based on the Mohr-Coulomb elastic-plastic model and the practical engineering background of Mopanshan tunnel, this paper applies the finite-difference software FLAC3D to simulate and analyse the whole process of loess tunnel construction. Then, it analyses the stability of the surrounding rock and sup-port structure after partial excavation of the loess tunnel under the shallow burying and unsymmetrical load-ing condition. The study showed that in the absence of support, the shear failure occurred to the top/upper pilot tunnel of the tunnel face, the failure zone under tensile stress happened to the shallow soil of the earth surface, and the soil of tunnel face appeared to be damaged. Finally, according to the analysis results, a rea-sonable construction method suitable for the shallow and bias loess tunnel is determined.