Minglei Ren

Dr. Minglei Ren


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 April 2022 in Water
Verified
Journal Article
Open access
PDF file
MRMinglei Ren
Minglei Ren
QZQi Zhang
Qi Zhang
YYYuxia Yang
Yuxia Yang
Gang WangGang Wang
Gang Wang
XWXu Wei
Xu Wei
LZLiping Zhao
Liping Zhao
This paper took the Foziling Reservoir in the Pi River Basin as an example, used an improved genetic algorithm to optimize the flood control dispatching during the flood process, and compared the results with the traditional genetic algorithm and the dispatching plan in the 2020 large-scale reservoir flood control operation plan. The results showed that, compared with the traditional genetic algorithm, the improved genetic algorithm saved the time for the model to determine the penalty coefficients and made the model application more convenient. At the same time, the design of the original scheduling scheme also has certain limitations. The scheduling results obtained by improving the genetic algorithm could occupy a small flood control capacity as much as possible under the premise of ensuring the safety of the reservoir itself and the downstream area.

15 March 2024 in Water
Verified
Journal Article
Open access
PDF file
YNYawei Ning
Yawei Ning
MRMinglei Ren
Minglei Ren
SGShuai Guo
Shuai Guo
GLGuohua Liang
Guohua Liang
BHBin He
Bin He
RTRong Tang
Rong Tang
Multi-objective reservoir operation of reservoir flood control involves numerous factors and complex model solving, and exploring effective methods for solving the operation models has always been a hot topic in reservoir optimization operation research. The Multi-Objective Ant Lion Algorithm (MOALO) is an emerging heuristic intelligent optimization algorithm, but it has not yet been applied in reservoir optimization operation. Testing the effectiveness of this method on multi-objective reservoir scheduling and further improving the optimization performance of this method is of great significance for enhancing the overall benefits of reservoir operation. In this study, MOALO is applied to the optimal scheduling of reservoir flood control. To increase the search efficiency of MOLAO, the advanced MOALO method (AMOLAO) is proposed by reconstructing the search distribution in MOALO using a power function. Taking the Songshu Reservoir and Dongfeng Reservoir in the Fuzhou River Basin in Dalian City as an example, MOALO, AMOLAO, and other two traditional methods are applied for solving the multi-objective reservoir operation problem. Results show that the AMOALO method has high search efficiency, strong optimization ability, and good stability. AMOALO performs better than MOALO and the two traditional methods. The study provides an efficient method for solving the problems in multi-objective reservoir operation.

26 June 2021 in Water
Verified
Journal Article
Open access
PDF file
XFXiaodi Fu
Xiaodi Fu
GWGang Wang
Gang Wang
MRMinglei Ren
Minglei Ren
LDLiuqian Ding
Liuqian Ding
XJXiaoming Jiang
Xiaoming Jiang
NWNan WU
Nan WU
Flood control risk is one of the main risks affecting the safe operation of large-scale water transfer projects. Systematically identifying the flood control risk in the project and carrying out risk classification and hierarchical management are problems for project managers. Based on the theory of system and risk assessment, this paper starts with the various risk sources and risk events involved in the whole process of the flood disaster chain, the risk of flood disaster factors, the exposure of the disaster-bearing body, and the vulnerability of the disaster-originating environment are combined. Then, we systematically and comprehensively identify the flood control risks of a large-scale water transfer project, which are divided into four types of risk elements: rainfall–runoff; confluence and flow capacity; the geological characteristics of canal section; economic and social layouts. Specific risk factors are identified for each type of risk element, and a flood control risk evaluation index system for a water transfer project is proposed. According to the framework of the analytic hierarchy process (AHP), a quantitative assessment of comprehensive flood control for water transfer projects is carried out. Taking the middle route of the South-to-North Water Transfer Project in China as an example, this paper evaluates the integrated flood control risks of 39 engineering units, identifies six units with higher risk levels, analyzes the causes, and suggests engineering and non-engineering countermeasures to prevent and reduce the occurrence of risk accidents. This method is not only used for comprehensive flood control risk assessment and risk management in the operation and management stage of the large-scale inter-basin water transfer project, but also has a reference value in considering the optimal layout of the project water transmission line from the perspective of flood control in the planning and design stage.

1 July 2021 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
MRMinglei Ren
Minglei Ren
LYLiu Yingfei
Liu Yingfei
FXFu Xiaodi
Fu Xiaodi
DLDing Liuqian
Ding Liuqian
WGWang Gang
Wang Gang
ZYZhu YaFeng
Zhu YaFeng
Since the 19th National Congress of the Communist Party of China, the high-quality development of China’s economy has put forward higher requirements for scientific and technological support of water safety guarantee. The flood control conditions of the design unit of water transfer project have changed to a certain extent compared with the initial design stage, especially the underlying surface of rivers and engineering conditions in the northern region have changed greatly, which has seriously affected the conveyance safety of water transfer project and the supply guarantee of water receiving area. Therefore, it is necessary to evaluate the change degree of flood control conditions in the design unit of water transfer project, and point out the weak links of flood control, so as to guide the flood control safety construction of the left bank area. In this paper, from the aspects of the change of underlying surface conditions, the actual flood discharge conditions of upstream and downstream, and the actual discharge capacity of buildings, the change of actual flood discharge conditions of water transfer project design unit compared with the original flood control design conditions is comprehensively considered. According to the principle of relatively independent, quantifiable and easy to obtain between indexes, the evaluation index system of flood control design condition change is established, On the basis of determining the classification standard for the quantitative and qualitative indexes, the entropy weight and fuzzy mathematics comprehensive evaluation model are used to evaluate the change degree of the current flood discharge conditions and the original flood control design conditions of each design unit of the water transfer project. For the units with large changes in flood control design conditions in the evaluation results, corresponding measures to eliminate risk factors and risk control will be taken. Finally, taking the flood control risk evaluation of a management office in a large-scale water transfer project as an example, this paper evaluates the change degree of the current flood discharge conditions and the original flood control design conditions of 16 three-level units in the management office. The results show that there are 6 three-level units with changes in the original flood control design conditions, including 4 great changes and 2 significant changes. The application example shows that the entropy weight and fuzzy mathematics comprehensive evaluation model can accurately reflect the change degree of each three-level design unit in the management office, and play a certain technical support role in the study of the performance change law in the life cycle of water transfer project and the theory of water transfer project and service environment evaluation. PACS: J0101

14 October 2024 in Water
Verified
Journal Article
Open access
PDF file
LMLilian Thomas Momburi
Lilian Thomas Momburi
CLChangwen Li
Changwen Li
FMFrank N. M. Masami
Frank N. M. Masami
MRMinglei Ren
Minglei Ren
IOIsaac Otoo
Isaac Otoo
This study utilizes the MIKE 11 hydrodynamic model developed by the Danish Hydraulic Institute to simulate flood behavior downstream of Karot Dam under multi-year in-flow conditions. The key parameters analyzed include breach characteristics, flood duration, water depth, flow velocity, discharge rate, and downstream distance. After dam failure, the peak discharge reaches 33,171 m3/s, exceeding the 10,000-year recurrence peak flow of 32,300 m3/s, with a breach duration of 2 h. The estimated peak discharge after simulation using empirical equations and comparative analyses showed maximum flood discharges of 28,187 m3/s, 28,922 m3/s, and 29,769 m3/s, with breach widths of 181 m, 256 m, and 331 m, respectively. The peak discharge predicted to reach the outlet with travel time ranging from 4 h 25 min to 4 h 40 min. Under multi-year average inflow conditions, Mangla Dam faces no risk of failure, with a maximum outflow of 12,097 m3/s and a spillway capacity of 30,147 m3/s. The model accurately predicted discharge values, with a strong correlation coefficient of R2 = 0.9653, indicating strong agreement between the actual water level data and predicted discharge. These insights are essential for developing effective emergency response strategies to mitigate the risks associated with dam failure.

14 June 2025 in Water
Verified
Journal Article
Open access
PDF file
NYNing Yang
Ning Yang
Gang WangGang Wang
Gang Wang
MRMinglei Ren
Minglei Ren
Qingqing SunQingqing Sun
Qingqing Sun
RTRong Tang
Rong Tang
YNYawei Ning
Yawei Ning
Based on the regional disaster system theory, this study constructed a comprehensive flood risk indicator system for small reservoirs, covering the entire flood disaster process from three dimensions: hazard, vulnerability, and exposure. The analytic hierarchy process (AHP) and entropy weight method (EW) were used to determine indicator weights, and a risk assessment was conducted for small reservoirs in Huangshan City, Anhui Province, China. The results indicate that most reservoirs exhibit medium–low overall risk, yet distinct localized high-risk zones exist. High-economic-density areas such as Tunxi District, the central–eastern parts of Huangshan District, and the central and eastern parts of Qimen County have become high-risk clusters due to prominent exposure indicators (numbers of villages and medical facilities). Reservoirs in western and northern regions exhibit higher hazard levels, primarily driven by rainfall and catchment areas. Dam height and reservoir capacity are the main factors affecting vulnerability, with no significant spatial clustering for high-vulnerability reservoirs. Through the decoupling of three-dimensional indicators, this study reveals the differentiated driving mechanisms of “hazard–vulnerability–exposure,” providing a scientific basis for optimizing flood control engineering (e.g., reservoir capacity expansion, dam reinforcement) and risk zoning management (e.g., emergency evacuation planning in high-exposure areas) for small reservoirs.