Sunita Bansal

Mrs. Sunita Bansal


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 May 2023 in Structures
Verified
Journal Article
Closed access
LGLilesh Gautam
Lilesh Gautam
SBSunita Bansal
Sunita Bansal
KSKul Vaibhav Sharma
Kul Vaibhav Sharma
PKPawan Kalla
Pawan Kalla

1 June 2017 in International Journal of Sustainable Built Environment
Verified
Journal Article
Open access
SBSunita Bansal
Sunita Bansal
SBSrijit Biswas
Srijit Biswas
SSS K Singh
S K Singh
A big challenge in sustainable projects is selection of appropriate construction method and is considered to be the decisive factor for its success. Many environment friendly prefabricated elements are entering into the market at an increasing pace. This has increased the workload and inquisitiveness of the stakeholders who will need information about their environmental, technical and esthetic aspects. The use of prefabrication in sustainable construction is advantageous but appropriate decision criteria and their weightage for applicability assessments for a project from every stakeholder’s perspective is found to be deficient. Decisions to use prefabricated elements are still largely based on anecdotal evidence or cost-based evaluation rather than holistic sustainable performance. But authenticated information is seldom available and suitability within the project requirements is always debatable. Environmental decisions, being closely coupled with society’s built-in uncertainties and risks, are uncertain since ecological systems as well as social systems change in the future. Thus the selection of a suitable construction method has been perceived as a multi-criteria decision-making problem highly intensive in knowledge with partial information and uncertainty. This knowledge or perception base from the minds of experts has to be collected and processed for a decision. Fuzzy synthetic evaluation method using analytic hierarchy process by Saaty has been adopted to provide an analytical tool to evaluate the applicability of prefabricated or on-site construction method

21 May 2019 in Journal of Building Engineering
Verified
Journal Article
Closed access
SBSunita Bansal
Sunita Bansal
SBSrijit Biswas
Srijit Biswas
SSS K Singh
S K Singh

15 December 2021
Verified
Book Chapter
Closed access
PDF file
KVKavita Vaishnav
Kavita Vaishnav
GLGift Pon Lazarus
Gift Pon Lazarus
SBSunita Bansal
Sunita Bansal
YHYaman Hooda
Yaman Hooda

13 June 2019
Verified
Book Chapter
Closed access
PDF file
SBSunita Bansal
Sunita Bansal
RTRaj Kumar Tamang
Raj Kumar Tamang
PBPrince Bansal
Prince Bansal
PBPratik Bhurtel
Pratik Bhurtel

14 August 2018 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
SBSunita Bansal
Sunita Bansal
SBSrijit Biswas
Srijit Biswas
SSS K Singh
S K Singh
Purpose: There is a tremendous growth of housing stock with subsequent resource consumption due to rapid urbanization. Most of the existing small-scale constructions have no planning, leading to both environmental degradation and negligible resilience to hazards. The contemporary sustainability and green building concepts are difficult to apply to small individual housing units but a collective regional assessment can be made. The regulatory bodies need to assess regions for resiliency and sustainability to prioritize fund allocation. Due to varying housing typologies and unaccounted resource consumption, reliable spatial information/data are not available to quantify risks and sustainability. The paper aims to discuss these issues. Design/methodology/approach: The fuzzy logic approach has been used here to propose a regional assessment factor to give a coarse relative status of each region (and not individual houses). The criterion considered incorporates both hazard safety and environmental aspects. Findings: A model of fuzzy technique for order preference by similarity to ideal solution based on experts’ linguistic opinions has been designed with appropriate negations for prioritizing regions. Originality/value: This paper anticipates that apart from pressing the need for increasing resilience to hazards, this simplified opinion-based tool will assist the government and administrators to prioritize and strategize their funds/efforts toward achieving safety and sustainability. Depending on the evaluation and assessment, specific retrofits can be planned and executed. The assessment may be used by NGOs working in housing sector and architects and engineering professionals or academicians.