Shu Tang

Dr. Shu Tang

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2019 in Automation in Construction
Verified
Journal Article
Closed access
STShu Tang
Shu Tang
DSDennis R. Shelden
Dennis R. Shelden
CECharles M. Eastman
Charles M. Eastman
PPPardis Pishdad-Bozorgi
Pardis Pishdad-Bozorgi
XGXinghua Gao
Xinghua Gao

1 February 2020 in Automation in Construction
Verified
Journal Article
Closed access
STShu Tang
Shu Tang
DSDennis R. Shelden
Dennis R. Shelden
CECharles M. Eastman
Charles M. Eastman
PPPardis Pishdad-Bozorgi
Pardis Pishdad-Bozorgi
XGXinghua Gao
Xinghua Gao

17 April 2023 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
GQGuofeng Qiang
Guofeng Qiang
STShu Tang
Shu Tang
JHJianli Hao
Jianli Hao
LSLuigi Di Sarno
Luigi Di Sarno
GWGuangdong Wu
Guangdong Wu
SRShaoxing Ren
Shaoxing Ren

1 January 2017
Verified
Book Chapter
Closed access
LTLlewellyn Tang
Llewellyn Tang
CCChao Chen
Chao Chen
STShu Tang
Shu Tang
ZWZhuoqian Wu
Zhuoqian Wu
Polina TrofimovaPolina Trofimova
Polina Trofimova

5 May 2022 in Buildings
Verified
Journal Article
Open access
PDF file
KWKeyao Wu
Keyao Wu
STShu Tang
Shu Tang
China’s urban housing demand has directly influenced urbanization development. To stabilize the level of urbanization, it is urgent to optimize the whole life-cycle efficiency of construction and the preliminary design as the first step is even more significant. Building Information Modeling (BIM) is widely used as information technology in the construction industry to promote the implementation and management of projects. However, the traditional preliminary design approach still occupies the mainstream market without forming a systematic BIM workflow, which causes inefficiency. To address this issue, this research aims to construct a BIM-assisted workflow to enhance the preliminary design efficiency of architecture. This study creates traditional and BIM-assisted workflows for comparative analysis to capture duration data with a questionnaire and validate by practical simulation. The findings show that the BIM-assisted workflow consumes less time than the traditional workflow. This research indicates that the BIM-assisted workflow can significantly reduce operation time to enhance preliminary design efficiency and deserves to be strongly promoted in the Chinese Architecture, Engineering, and Construction (AEC) industry.

23 September 2025 in Journal of Building Engineering
Verified
Journal Article
Closed access
STShu Tang
Shu Tang
DSDennis R. Shelden
Dennis R. Shelden
XGXinghua Gao
Xinghua Gao
Cheng ZhangCheng Zhang
Cheng Zhang
JHJianli Hao
Jianli Hao
HZHaoyu Zhang
Haoyu Zhang