Alireza Soroudi

Dr. Alireza Soroudi

University College Dublin

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2013 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
ASAlireza Soroudi
Alireza Soroudi
TATuraj Amraee
Turaj Amraee


30 August 2011 in IEEE Systems Journal
Verified
Journal Article
Closed access
ASAlireza Soroudi
Alireza Soroudi
MAMorteza Aien
Morteza Aien
MEMehdi Ehsan
Mehdi Ehsan
The rapid growth in use of renewable intermittent energy resources, like wind turbines (WTs) and solar panels, in distribution networks has increased the need for having an accurate and efficient method of handling the uncertainties associated with these technologies. In this paper, the unsymmetrical two point estimate method (US2PEM) is used to handle the uncertainties of renewable energy resources. The uncertainty of intermittent generation of WT, photo voltaic cells, and also electric loads, as input variables, are taken into account. The variation of active losses and imported power from the main grid are defined as output variables. The US2PEM is compared to symmetrical two point estimate method, Gram-Charlier method, and Latin hypercube sampling method, where Monte Carlo simulation is used as a basis for comparison. The validity of the proposed method is examined by applying it on a standard radial 9-node distribution network and a realistic 574-node distribution network.

1 August 2014 in Energy
Verified
Journal Article
Closed access
MTMohammad Amin Tajeddini
Mohammad Amin Tajeddini
ARAshkan Rahimi-Kian
Ashkan Rahimi-Kian
ASAlireza Soroudi
Alireza Soroudi

31 January 2012 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
ASAlireza Soroudi
Alireza Soroudi
The distribution network operators (DNOs) are responsible for securing a diverse and viable energy supply for their customers so the technical and economical impacts of distributed generation (DG) units are of great concerns. Traditionally, the DNOs try to maximize the technical performance of the distribution network, but it is evident that the first step in optimizing a quantity is being able to calculate it. The DG investment/operation which is performed by distributed generation operators/owners (DGOs) (under unbundling rules) has made this task more complicated. This is mainly because the DNO is faced with the uncertainties related to the decisions of DG investors/operators where some of them can be probabilistically modeled while the others are possibilistically treated. This paper proposes a hybrid possibilistic-probabilistic DG impact assessment tool which takes into account the uncertainties associated with investment and operation of renewable and conventional DG units on distribution networks. This tool would be useful for DNOs to deal with the uncertainties which some of them can be modeled probabilistically and some of them are described possibilistically. The proposed method has been tested on a test system and a large-scale real distribution network to demonstrate its strength and flexibility.

1 March 2012 in IET Renewable Power Generation
Verified
Journal Article
Closed access
ASAlireza Soroudi
Alireza Soroudi
MAM. Afrasiab
M. Afrasiab
This study proposes a stochastic dynamic multi-objective model for integration of distributed generations in distribution networks. The proposed model optimises three objectives, namely technical constraint dissatisfaction, costs and environmental emissions and simultaneously determines the optimal location, size and timing of investment for both distributed generation (DG) units and network components. The uncertainties of electric load, electricity price and wind power generations are taken into account using scenario modelling. A scenario reduction technique is used to reduce the computational burden of the model. The Pareto optimal solutions of the problem are found using a binary particle swarm optimisation (PSO) algorithm and finally a fuzzy satisfying method is applied to select the optimal solution considering the desires of the planner. The effectiveness of the proposed model is demonstrated by applying it to a realistic 201-node distribution network.