Feet-lock steel pipes have been widely applied in soft-rock tunnels, but their installation quantity and parameters depend on engineering experience. In this study, by simplifying the force between the feet-lock steel pipe and the primary lining, the load-deformation characteristics were analyzed separately, and inconsistent deformation was revealed. Next, combined with the passive and active bearing scheme, a design optimization method for feet-lock steel pipes was proposed under two working conditions, including the predicted large deformation and observed large deformation before the primary lining construction. Finally, the design method was applied to the Yulinzi Tunnel, and the results show that the original design of the feet-lock steel pipes could not meet the requirements of the controlling settlement. After the optimized design, both the passive bearing scheme installing two ϕ108 × 3-millimeter steel pipes and the active bearing scheme installing one ϕ108 × 4-millimeter steel pipe could meet the requirements of the controlling settlement. The active bearing design can significantly reduce the amount of steel required and the engineering cost. The scientificity and feasibility of the design optimization method were proven by the on-site monitoring and measurement.
Foot steel pipe was the main arch foot supporting structure to control large deformation of loess tunnels, but the supporting effect was not ideal. Taking Yulinzi Tunnel in Qingyang, Gansu Province, as the engineering background, the design concept and implementation scheme of a foot steel pipe active bearing was put forward. The purpose was to solve the problem that it was difficult to control the surrounding rock settlement with the foot steel pipe. Numerical simulation and field experiments were used to verify the effect of the active bearing technology of the foot steel pipe. The main conclusions were as follows: (1) The effect of increasing the diameter of the foot steel pipe is better than that of increasing the number of foot steel pipes. (2) The active bearing mode of exerting its bearing capacity in advance by prepressing the foot steel pipe can effectively reduce the settlement of the vault. The settlement rate of the vault can be reduced by about 70% in 1–2 days and more than 50% in 1–3 days. (3) At the initial stage of surrounding rock deformation, this technology can provide a large bearing capacity, thereby reducing the overall deformation of the surrounding rock, slowing down the release of the surrounding rock pressure, and playing a positive role in the settlement control of the vault.