Anish Kumar Sachdeva

Prof. Dr. Anish Kumar Sachdeva

Industrial & Production Engg. Dr. B.R. Ambedkar National Institute of Technology, Jalandhar, India
orcid

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 February 2010 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
RGR. K. Garg
R. K. Garg
KSKalyan Kumar Singh
Kalyan Kumar Singh
ASAnish Kumar Sachdeva
Anish Kumar Sachdeva
VSVishal Sharma
Vishal Sharma
KOKuldeep Ojha
Kuldeep Ojha
Sharanjit SinghSharanjit Singh
Sharanjit Singh

1 March 2020 in Renewable Energy
Verified
Journal Article
Closed access
SCSuraj Choudhary
Suraj Choudhary
ASAnish Kumar Sachdeva
Anish Kumar Sachdeva
PKPramod Kumar
Pramod Kumar

1 April 2010 in International Journal of Precision Engineering and Manufacturing
Verified
Journal Article
Closed access
PDF file
MDManu Dogra
Manu Dogra
VSVishal Sharma
Vishal Sharma
ASAnish Kumar Sachdeva
Anish Kumar Sachdeva
NSNarinder Mohan Suri
Narinder Mohan Suri
JDJasminder Singh Dureja
Jasminder Singh Dureja

21 October 2019 in Journal of Manufacturing Technology Management
Verified
Journal Article
Closed access
Rahul S MorRahul S Mor
Rahul S Mor
DBDr. Arvind Bhushan Bhardwaj
Dr. Arvind Bhushan Bhardwaj
SSSarbjit Singh
Sarbjit Singh
ASAnish Kumar Sachdeva
Anish Kumar Sachdeva
Purpose: The purpose of this paper is to identify the non-value-adding activities (NVAs) of core making process and to eliminate them through the standardization-of-work (SW) procedures in a manufacturing company. Design/methodology/approach: The action-research methodology was adopted for the current study. First, various lean tools were identified through literature review, and the bottleneck area was identified in discussion with the shop-floor executives. NVAs were recorded after a continuous process study including method study and motion analysis followed by the standard operating procedure. Second, the standardized work combination tables were prepared and NVAs were eliminated using the SW procedures. SW has been opted because it is a set of actions which helps in analyzing, improving and controlling the process and it leads to continual improvement. Findings: The production logbook revealed that the capacity in this particular workstation was 54 pieces per 7 h work shift against the current production of approx. 45–50 pieces (past data). SW saved 31.6 s per cycle which boosted the production up to 58 pieces per 7 h work shift. Finally, the authors came to know that the productivity of this particular process increased up to 6.5 percent which may upsurge if this action is executed continually with the support from shop-floor executives and management. These results were also compared with previous research works in this area and found significant relevance, and hence, the results appear to be reliable. Research limitations/implications: This is a unique study in itself which explores the lean model by assessing NVAs of core making process. The proposed approach needs to be tested across different other core making processes of the case company so as to generalize the effectiveness of SW as well as the results obtained in the current study. Practical implications: The current study illustrates an important step to give more visibility to the lean concept by addressing the problem of lack of standard procedures. This study will help the shop-floor executives and managers to focus their efforts in achieving high performance through effective implementation of SW. The study should be of the interest of researchers in the area of lean manufacturing, operations management, productivity analysis, etc. Originality/value: The findings of this study are based on the problem formulation for productivity gains using SW procedures in the case company. The study introduces a new perspective for the execution of SW for core making processes. SW created transparency in workflow, enhanced the safety and eliminated the 3Ms. The outcome of the current study was discussed with the production team and management of the company to validate the productivity gains and received an optimistic response. Most importantly, these improvements were achieved with no investment in machinery or tooling.

28 April 2012 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
ASAnish Kumar Sachdeva
Anish Kumar Sachdeva
Sharanjit SinghSharanjit Singh
Sharanjit Singh
VSVishal Sharma
Vishal Sharma

1 January 2018 in Uncertain Supply Chain Management
Verified
Journal Article
Closed access
HSHarjit Singh
Harjit Singh
RGR. K. Garg
R. K. Garg
ASAnish Kumar Sachdeva
Anish Kumar Sachdeva