Fuyuan Jia

Dr. Fuyuan Jia


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
YXYutong Xue
Yutong Xue
PXPengcheng Xiang
Pengcheng Xiang
FJFuyuan Jia
Fuyuan Jia
Zhaowen LiuZhaowen Liu
Zhaowen Liu
Due to their characteristics and multiple objectives, high-speed rail (HSR) projects carry more complex risks than conventional projects and high correlation and conductivity are among the associated risk factors. Previous risk assessment frameworks for rail infrastructure have ignored the effects of risk interactions that inflate risk levels, namely, risk coupling effects. Based on a system dynamics method, this paper develops a risk coupling model for HSR project risk assessments. A risk factor list is established from a literature review, and relationships analysed using a case study and expert interviews. System dynamics equations are constructed and their parameters obtained by expert evaluations of risk factors. The proposed model is applied to a real-world HSR project to demonstrate it in detail. The model can evaluate the risk levels of HSR projects during a simulation period. In particular, it can identify the key coupling effects that are the main increased risk. It provides a significant resource, using which HSR project managers can identify and mitigate risks.

DCDan Chen
Dan Chen
PXPengcheng Xiang
Pengcheng Xiang
FJFuyuan Jia
Fuyuan Jia
JZJian Zhang
Jian Zhang
Zhaowen LiuZhaowen Liu
Zhaowen Liu
Mega infrastructure projects provide a basic guarantee for social development, economic construction, and livelihood improvement. Their operation and maintenance (O&M) management are of great significance for the smooth operation and the realization of the value created by the projects. In order to provide an approach for effectively evaluating O&M management, this study develops a holistic indicator system using a mixed-review method from the national macro perspective in China. In this study, literature analysis, policy texts, expert interviews, and grounded theory were used to collect relevant data at home and abroad, and establish an initial evaluation indicator system with 23 indicators covering two dimensions and five aspects. Then the questionnaire survey and factor analysis were used to score and categorize the indicators, and finally an evaluation indicator system for O&M management of mega infrastructure projects was formed. The results show that social relations, environmental benefits, macro policy, and operational capacities play an important role in the evaluation of the O&M of mega infrastructure projects. This study helps the management team to avoid negative impacts in the O&M management of mega infrastructure projects and lays a theoretical foundation for future research. The indicator system in this study is based on the Chinese context, and it remains to be verified whether the indicator system is applicable to other countries due to the differences in political and cultural backgrounds in different regions.