Pei Fengque

Dr. Pei Fengque

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2021 in Journal of Manufacturing Systems
Verified
Journal Article
Closed access
FPFengque Pei
Fengque Pei
YTYi-Fei Tong
Yi-Fei Tong
MYMing-Hai Yuan
Ming-Hai Yuan
KDKun Ding
Kun Ding
XCXi-Hui Chen
Xi-Hui Chen

14 March 2017 in Mechanics
Verified
Journal Article
Closed access
PDF file
FPFengque Pei
Fengque Pei
TYTong Yifei
Tong Yifei
HFHe Fei
He Fei
LDLi Dongbo
Li Dongbo
Research on Design of the Smart Factory for Forging Enterprise in the Industry 4.0 Environment

28 July 2025 in Chinese Journal of Mechanical Engineering
Verified
Journal Article
Open access
PDF file
KLKunping Li
Kunping Li
JLJianhua Liu
Jianhua Liu
SZSikuan Zhai
Sikuan Zhai
CZCunbo Zhuang
Cunbo Zhuang
PFPei Fengque
Pei Fengque
Efficient preparation and assembly guidance for complex products relies heavily on semantic information in assembly process documents. This information encompasses various levels of elements and complex semantic relationships. However, there is currently a scarcity of effective modeling techniques to express these documents’ inherent assembly process knowledge. This study introduces a method for constructing an Assembly Process Knowledge Graph of Complex Products (APKG-CP) utilizing text mining techniques to tackle the challenges of high costs, low efficiency, and difficulty reusing process knowledge. Developing the assembly process knowledge graph involves categorizing entity and relationship classes from multiple levels. The Bert-BiLSTM-CRF model integrates BERT (bidirectional encoder representations from transformers), BiLSTM (bidirectional long short-term memory), and CRF (conditional random field) to extract knowledge entities and relationships in assembly process documents automatically. Furthermore, the knowledge fusion method automatically instantiates the assembly process knowledge graph. The proposed construction method is validated by constructing and visualizing an assembly process knowledge graph using data from an aerospace enterprise as an example. Integrating the knowledge graph with the assembly process preparation system demonstrates its effectiveness for process design.

2 January 2026 in Renewable Energy
Verified
Journal Article
Closed access
FPFengque Pei
Fengque Pei
BZBowen Zhang
Bowen Zhang
SLSuyan Long
Suyan Long
MYMinghai Yuan
Minghai Yuan

29 September 2024 in Chinese Journal of Mechanical Engineering
Verified
Journal Article
Open access
PDF file
FPFengque Pei
Fengque Pei
JLJianhua Liu
Jianhua Liu
CZCunbo Zhuang
Cunbo Zhuang
LZLiang Zheng
Liang Zheng
JZJiapeng Zhang
Jiapeng Zhang
When several traditional flow-shop lines operate in parallel, the operation mode with no communication between production lines will no longer be the optimal production paradigm. This paper describes matrix manufacturing systems (MMS) in a general manner from the perspective of related works, comparing different manufacturing organizational forms and their characteristics. Subsequently, MMS are extracted during the parallel production of multiple surface mount technology (SMT) lines. An overall equipment effectiveness (OEE) online calculation model and a collaborative optimization method are proposed based on the OEE of the MMS. The innovative idea of this study is to divide existing multiple parallel SMT lines into MMS. The efficiency of each matrix unit (MU) was calculated, and a collaborative optimization method was proposed based on an indicator (OEE). In this paper, an example of eight SMT lines is presented. The partitioning of MUs, OEE calculation of each MU, and the low OEE unit collaborative optimization method are described in detail. Through a case study, the architecture of the collaborative optimization model for the MMS was constructed and discussed. Finally, the improvement in the OEE proved the effectiveness and usability of the proposed architecture.

8 October 2022 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
FPFengque Pei
Fengque Pei
JZJiaxuan Zhang
Jiaxuan Zhang
MSMei Song
Mei Song
HSHaojie Song
Haojie Song
The nature of construction and formulation of the multi-objective functions in the flexible job shop (FJS) provides great insights about the study of the technique and the mechanism in scheduling helping to prioritize efforts for optimizing the manufacturing execution performance, which draw the focus of the researchers at home and abroad. From the perspective of the model, the solution method and the objective function, this paper reviews and analyzes the related academic papers and conferences articles during past few years. As a result, the construction forms of the multi-objective function and the scheduling scenarios show strongly positive correlation with the Makespan, the delivery tardiness, the energy consumption or the cost. Consequently, facing with the characteristic in a general way, the detailed construction analysis on the function for the flexible job shop scheduling problem (FJSP) is critical reviewed, and a total 6 types with 49 kinds classification are discussed. Obviously, the main goals are to summarize, analyze, discuss, and synthesize the existing achievements, the current research status, and the ongoing studies on the FJSP functions construction, and additionally to give useful insight into future research. Combined with the development trend of the intelligent manufacturing and the operations research, arguing for the formulation of the multi-obj. function, this review is expected to contribute to the future research of FJSP.