Jun Feng

Prof. Dr. Jun Feng

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 May 2017 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
YZYu Zhang
Yu Zhang
YLYuanxue Liu
Yuanxue Liu
YTYizhong Tan
Yizhong Tan
JFJun Feng
Jun Feng

1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
YZYuxia Zhao
Yuxia Zhao
JFJun Feng
Jun Feng
KLKangqi Liu
Kangqi Liu
HXHongwei Xu
Hongwei Xu
LWLiqun Wang
Liqun Wang
HLHongyan Liu
Hongyan Liu
Due to the threat of global warming and the accelerated melting of glaciers and permafrost, the stability of slopes in permafrost regions has received an increasing amount of attention from scholars. However, research on the stability of soil‐rock road cutting slopes in high‐latitude and low‐altitude permafrost regions of the Greater Khingan Mountains in the Inner Mongolia Autonomous Region has not been reported. For this reason, a study of the stability of a slope with a high ice content in section K105 + 600 to K105 + 700 of National Highway 332 is conducted. The slope is 20 m high and the slope angle is 45°, and the risk of landslides on this slope under the action of freeze‐thaw erosion is very high. Because of this, field in situ monitoring, indoor freeze‐thaw tests, thermal parameter tests, and ABAQUS numerical simulation models are used to study the stability of the slope. After collecting the continuous temperature, moisture, settlement, and slope deformation data, it was found that the slope was undergoing dynamic changes. The creep of shallow slopes increased with the number of freeze‐thaw cycles. After approximately 150 freeze‐thaw cycles, the slope safety factor was less than 1, which means that the slope had reached the limit equilibrium state. Therefore, freeze‐thaw erosion greatly reduced the stability of the slope. Hence, the stability of the slope must be protected during its entire life cycle. This study provides a reference for the design and construction of road cutting slopes in the high‐latitude and low‐altitude permafrost regions of the Greater Khingan Mountains.

22 January 2024 in Polish Journal of Environmental Studies
Verified
Journal Article
Open access
JFJun Feng
Jun Feng
XLXiaomei Lu
Xiaomei Lu
YLYanjun Liu
Yanjun Liu
JWJian Wu
Jian Wu
JHJizhe He
Jizhe He
ZZZhuoya Zhao
Zhuoya Zhao
In order to ensure flight safety, the requirement of foundation settlement of high-plateau airport is stricter than that of airport in plain area. In order to monitor the abnormal state of runway foundation in the process of use of a high-plateau airport and prevent and resolve the major risk of foundation settlement to flight safety. It takes a high-plateau airport in the southwest mountain area as an example, selecting two representative A and B sections for analysis. It takes the first 60 days’ monitoring data as training samples, which shows nonlinear characteristics. The Long and Short Term Memory neural network (LSTM) prediction model and BP neural network model are constructed to predict the trend of foundation settlement after construction. In the process of building the LSTM model, the minimum root-mean-square error of test samples was selected as the fitness function, and the parameters of the LSTM model were modified by Genetic Algorithm (GA). And then the modified LSTM prediction model based on the early settlement of the foundation was constructed. The results shows that the modified LSTM model and BP model constructed in this paper are generally consistent with the field measured values in the prediction of airport foundation settlement of high-plateau, but the modified LSTM model is more sensitive to the abrupt change of data and has a more stable trend than the BP model. The predicted values of the modified LSTM model are all greater than those of the BP model, and the predicted values of the modified LSTM model are closer to the monitored values in the field than the predicted values of the BP model, and the relative error between the predicted values and the monitored values is less than 3%. The research can provide a reliable theoretical reference for the design, construction, operation management and later maintenance of high-plateau airport.

4 January 2015
Verified
Book Chapter
Closed access
PDF file
WWWen-Can Wang
Wen-Can Wang
JFJun Feng
Jun Feng
XWXi-Yong Wu
Xi-Yong Wu
QYQi-Xiang Yang
Qi-Xiang Yang
BZBao-Long Zhu
Bao-Long Zhu

23 September 2022 in Geofluids
Verified
Journal Article
Open access
PDF file
JFJun Feng
Jun Feng
HYHui-Juan Yang
Hui-Juan Yang
YZYu Zhang
Yu Zhang
In view of the geological environment, in which the upper part is the “soft” layer of completely weathered siliceous rock and the lower part is the “hard” layer of weakly weathered limestone, the rail surface line is designed to pass through the interface between the upper “soft” layer and lower “hard” layer. First, the MIDAS/GTS software was used to comprehensively simulate the stress and deformation law of surrounded rock under three excavation methods, which are the positive benching and retaining core soil method, CRD method, and double side drift method, for selecting the appropriate excavation method. After the excavation method was determined, the rule of change in the stress and deformation of the surrounded rock with time in the actual excavation process was analyzed by field monitoring means. Finally, on the basis of the findings in the numerical analysis as well as the field monitoring, the engineering characteristics, such as the stress and deformation of the surrounded rock during the excavation of deep buried tunnels in the upper-soft lower-hard ground, were analyzed. The results revealed the following: (1) Under all three excavation methods, the tunnel deformation was small and met the requirements for tunnel deformation control. (2) Due to the different excavation support sequence, the distribution of lining bending moment of the three excavation methods was widely different. The bending moment of the lining produced by the positive benching method was far less than that of the other two methods. (3) Due to the difference in lithology, the stress of the tunnel lining in the thick upper “soft” and “hard” strata was mainly concentrated on the upper soft rock area, while the stress in the lower hard rock area was relatively small, and the lining stress value generated using the three excavation methods was relatively large. In general, the deformation and stress in the positive benching method construction were less than those in the other two methods. In addition, the positive benching method was convenient for mechanized operation, the construction progress was fast, and the cost was relatively low. Therefore, the positive benching and retaining core soil method is adoptable for this kind of tunnel. (4) The measured stress and deformation at the rail surface line exhibited a change law of first increase, and subsequently, this tended to be stable. The change in stress-time can be expressed by the Boltzmann function, and the change in deformation with time can be well expressed by exponential functions. (5) The stress value and deformation value detected in the actual excavation were greater than the results of the theoretical numerical analysis. However, the findings in the theoretical numerical analysis still have certain guiding significance for actual excavation.

21 October 2020 in Geofluids
Verified
Journal Article
Open access
PDF file
YZYuxia Zhao
Yuxia Zhao
JFJun Feng
Jun Feng
KLKangqi Liu
Kangqi Liu
QWQi Wu
Qi Wu
LWLiqun Wang
Liqun Wang
HLHongyan Liu
Hongyan Liu
National Highway 332 (referred to as line 332) is the most convenient way for the forest areas (Oroqen Autonomous Banner, etc.) in northern China. This area is located in the high-latitude permafrost regions of the Daxing’anling Mountains. The section of line 332 from Ali River to Kubuchun Forest Farm is 116 km long, and the permafrost section is 7.45 km. Part of the section, K105+700-K105+800, is a road cutting slope with high ice content, and it is also our research object. The slope to be studied is difficult to construct and has high landslide risk, so we arranged thirty-five temperature sensors, four moisture sensors, and eighteen landmarks on the slope to grasp the dynamic changes of the slope under freeze-thaw conditions. After collecting the continuous data of temperature, moisture, settlement, and deformation of the slope, we found that the slope was undergoing freeze-thaw cycles, and the shallow slippage of the slope reached 6.811 cm in 2019. Besides, the drilled core samples were tested in the laboratory and relevant parameters were obtained. Then, the slope stability was numerically simulated in ABAQUS numerical simulation software. After two hundred freeze-thaw cycles, the slope safety factor reached 0.997, indicating that the slope was in a state of extreme equilibrium, so the potential freeze-thaw disasters must be considered during road operation, and higher requirements for the permanent protection of slopes should also be put forward. The study can provide guidance for the design and construction of road cutting slope in the permafrost regions of the Daxing’anling Mountains.