Load shedding control is an emergency control measure to maintain the frequency stability of the power system. Most of the existing load shedding methods use the extensive form of directly cutting off the outlet of the substation, featuring low control accuracy and high control cost. A network reconfiguration technique can adjust the topology of the distribution network and offers more optimization space for load shedding control. Therefore, this paper proposes a reconfiguration–load shedding coordination optimization scheme to reduce the power loss caused by load shedding control. In the proposed method, a load shedding mathematical optimization model based on distribution network reconfiguration is first established. The tie switches and segment switches in the distribution network are used to perform the reconfiguration of the distribution network, and the load switches are adopted to realize the load shedding. To improve the solving efficiency of the model, a solving strategy that combined a minimum spanning tree algorithm with an improved genetic algorithm is trailed to address the nonlinear and nonconvex terms. The application of the proposed method and model are finally verified via the IEEE 33 bus system, and the advantages in reducing the loss cost and the number of outage users are accordingly proven.
Inter-plant hydrogen integration can reduce the consumption of hydrogen utility in petrochemical parks. However, the fluctuation of operating conditions will lead to complex multi-period problems of hydrogen network integration. This work develops a simultaneous optimization approach to solving multi-period optimization problems for the inter-plant hydrogen network. To do this, we consider the inter-plant hydrogen integration and the fluctuation of operating conditions in each plant at the same time, and aim to minimize the total annualized cost of the entire hydrogen system of all plants involved. An industrial case study of a three-plant hydrogen network with seven subperiods was adopted to verify the effectiveness of the proposed method. Results show that the optimal structure and the corresponding scheduling scheme can be obtained when the lowest cost of the system is targeted. Compared with the stepwise methods, the proposed approach features taking the characteristics of all subperiods into account simultaneously and making the structure of the hydrogen network much more effective and economical. For the scheduling schemes, the utilization efficiency of the internal hydrogen sources is increased by hydrogen exchange among the plants.
25 April 2023 in Industrial & Engineering Chemistry Research