Muhammad Cahyono

Dr. Muhammad Cahyono

Bandung Institute of Technology, Bandung, Jawa Barat, Indonesia
orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 June 2022 in Hydrology
Verified
Journal Article
Open access
PDF file
MCMuhammad Cahyono
Muhammad Cahyono
This study proposes seven equations to predict the settling velocity of sediment particles with variations in grain size (d), particle shape factor (SF), and water temperature (T) based on the artificial neural network procedure. The data used to develop the equations were obtained from digitizing charts provided by the U.S. Interagency Committee on Water Resources (U.S-ICWR) and compiled from the measurement data of settling velocity from several sources. The equations are compared to three existing equations available in the literature and then analyzed using graphical and statistical analysis. The simulation results show the proposed equations produce satisfactory results. The proposed equations can predict the settling velocity of natural particle sediments, with diameters ranging between 0.05 mm and 10 mm in water with temperatures between 0 °C and 40 °C, and shape factor SF ranging between 0.5 and 0.95.

25 November 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
ACAsrini Chrysanti
Asrini Chrysanti
AAAriz Adhani
Ariz Adhani
IAIsmail Naufal Azkiarizqi
Ismail Naufal Azkiarizqi
MAMohammad Bagus Adityawan
Mohammad Bagus Adityawan
MKMuhammad Syahril Badri Kusuma
Muhammad Syahril Badri Kusuma
MCMuhammad Cahyono
Muhammad Cahyono
Demak is highly vulnerable to flooding from both fluvial and coastal storms, facing increasing pressures on its sustainability and resilience due to multiple compounding flood hazards. This study assesses the inundation hazards in Demak coastal areas by modeling the impacts of compound flooding. We modeled eight scenarios incorporating long-term forces, such as sea level rise (SLR) and land subsidence (LS), as well as immediate forces, like storm surges, wind waves, and river discharge. Our findings reveal that immediate forces primarily increase inundation depth, while long-term forces expand the inundation area. Combined effects from storm tides and other factors resulted in a 10–20% increase in flood extent compared to individual forces. Fluvial flooding mostly impacts areas near river outlets, but the combination of river discharge and storm tides produces flood extents similar to those caused by SLR. Land subsidence emerged as the primary driver of coastal flooding, while other factors, adding just 25% to area increase, significantly impacted inundation depth. These findings underscore the effectiveness of mangroves in mitigating floods in low-lying areas against immediate forces. However, the resilience and sustainability of the Demak region are challenged by SLR, LS, and the need to integrate these factors into a comprehensive flood mitigation strategy.

21 June 2022 in Fluids
Verified
Journal Article
Open access
PDF file
MCMuhammad Cahyono
Muhammad Cahyono
This study proposes hybrid models to solve the Colebrook–White equation by combining explicit equations available in the literature to solve the Colebrook–White equation with an error function. The hybrid model is in the form of fH=fo−eA. fH  is the friction factor value f predicted by the hybrid model, fo is the value of f calculated using several explicit formulas for the Colebrook–White equation, and eA is the error function determined using the neural network procedures. The hybrid equation consists of a series of hyperbolic tangent functions whose number corresponds to the number of neurons in the hidden layer. The simulation results showed that the hybrid models using five hyperbolic tangent functions could produce reasonable predictions of friction factors, with the maximum absolute relative error (MAXRE) around one tenth, or ten times lower than that produced by the corresponding existing formula. The simplified hybrid models are also given using four and three tangent hyperbolic functions. These simplified models still provide accurate results with MAXRE of less than 0.1%.

22 February 2019 in MATEC Web of Conferences
Verified
Journal Article
Open access
OPOlivia Putri Purnama
Olivia Putri Purnama
HKHadi Kardhana
Hadi Kardhana
HIHarry Indrawan
Harry Indrawan
RARasgianti
Rasgianti
MCMuhammad Cahyono
Muhammad Cahyono
DCDan Anna Nurganah Chaidar
Dan Anna Nurganah Chaidar
Climatic conditions in Indonesia warm up indicated by the increasing of the average annual temperature by 0.3°C. This may cause higher water evaporation and increased rainfall intensity. Changes in rainfall patterns shift the start of the rainy season to be slower and end faster. These changes the dry season to become longer with shorter time intervals. In case of dam operation, dam manager needs to adapt the effects of climate change. This paper presents trend and future projection in Riam Kanan Catchment Area, Banjar Regency, South Kalimantan. Climate change historical trend analysis was carried out with the observation data used were rainfall and maximum temperature from BMKG climatology station, Banjarbaru Station, in the period 1983 - 2017. Future projection analysis was carried out by using RCP2.6 and RCP8.5 scenario data for projecting rainfall and temperature in the period 2018 - 2100. The result shows that the rainfall, maximum temperature, and evapotranspiration trends in Banjarbaru from 1983 - 2017 were not too significant by +0.1 mm, -0.5°C, and +0.1 mm. While the projection of RCP2.6 and RCP8.5 scenario shows increase by +0.1 mm, +0.1°C, +0.1 mm and by +0.1 mm, +3.3°C, and +0.1 mm. Keywords: Climate Change, Trend, Rainfall, Temperature, Evapotranspiration, RCP 2.6, RCP8.5.

29 September 2023 in Jurnal Riset Rekayasa Sipil
Verified
Journal Article
Open access
PDF file
DRDian Afifah Rahmawati
Dian Afifah Rahmawati
Eka Oktariyanto NugrohoEka Oktariyanto Nugroho
Eka Oktariyanto Nugroho
MKMuhammad Syahril Badri Kusuma
Muhammad Syahril Badri Kusuma
MCMuhammad Cahyono
Muhammad Cahyono
IJImroatul C. Juliana
Imroatul C. Juliana
TGTaufik Ari Gunawan
Taufik Ari Gunawan
Drought occurs quite often in Indonesia, closely related to water availability for community needs. One of the districts in West Java Province experiencing drought problems is Karawang district, where the RWH (Rainwater Harvesting) concept will be applied. This study aimed to analyze the risk of drought-related to applying the potential RWH in reducing drought risk. This study only focuses on meteorological drought, determined by SPI (Standardized Precipitation Index). Identification of potential areas for the application of RWH is carried out using the Weighted Method Overlay approach in the Geographic Information System (GIS), which was modified by adding a parameter of potential drought hazard. The potential reliability of RWH, as seen from Volumetric Reliability (VR) for supplying the average water requirement of MCK (Bath Washing Toilet) per year, indicates that most of the Karawang district area is potential for applying RWH. The results of adding the potential drought hazard parameters on applying the RWH concept show the decreasing area of very potential and potential category areas into 5,38%, the increase of drought resistance capacity is 17.5%, and the risk-reducing to 8.3%. Those results are due to the changes in the area of drought in the risk analysis. The assumptions of 60 rainy days on the average rainy day in a year and all households making RWH storage systems were used in the analysis. The results of this study can be used as a first step to see the potential of RWH in Karawang Regency both in terms of area and reliability.

29 March 2020 in Prosiding Temu Profesi Tahunan PERHAPI
Verified
Journal Article
Open access
PDF file
TPTiara Andrianie Putri
Tiara Andrianie Putri
ABAhmad Baiquni
Ahmad Baiquni
MCMuhammad Cahyono
Muhammad Cahyono
ABSTRAK   Pit E dan Pit 7B West adalah Pit yang berada di Blok-7 Tambang Binungan PT Berau Coal yang berdekatan dengan bibir sungai. Kedua pit ini memiliki resiko tinggi terhadap potensi banjir luapan air sungai. Sungai Kelay termasuk kategori Sungai Besar karena memiliki luas daerah aliran sungai (DAS) 7,027km2 (>500km2) dan panjang ±155 km. Seiring dengan peningkatan target produksi PT Berau Coal (PTBC) tahun 2019 maka, bukaan penambangan menuju kearah utara mendekati bibir sungai. Kondisi ini akan berpotensi meluapnya air Sungai Kelay menuju Pit Blok-7 karena menerima kiriman banjir dari hulu. Banjir yang terjadi di area penambangan akan mempengaruhi kondisi keselamatan dan operasional penambangan serta ketercapaian produksi PTBC pada tahun 2019 secara keseluruhan. Berdasarkan historis kejadian banjir di Pit Blok-7 yang terjadi pada bulan Juni tahun 2017, luapan banjir dari Sungai Kelay mencapai elevasi +8.3MRL. Arah aliran banjir melalui area rawa pada sisi utara Pit dan menggenangi Pit 7B West. Sistem mitigasi telah dibangun di akhir tahun 2017 dan selesai pada akhir tahun 2018. Sistem mitigasi ini mencakup pengambilan data batimetri, HEC-HMS, HEC-RAS hingga analisis Neural Network yang menghasilkan waktu prediksi banjir untuk setiap titik pantau terdekat Pit yang telah ditentukan. Waktu prediksi banjir akan digunakan sebagai waktu tenggang untuk evakuasi alat beserta manusia. Sistem ini didukung oleh pembangunan instrumen monitoring otomatis berupa Automatic Rain Gauge dan Automatic Water Level Recorder pada titik hulu dan hilir Sungai Kelay, sehingga mampu menghasilkan analisis yang lebih cepat dan akurat terhadap kondisi aktual di lapangan serta dapat menggambarkan daerah terdampak banjir untuk kala ulang 50 tahun dan rekomendasi geometri tanggul penahan banjir yang sesuai. Sistem mitigasi dibagi menjadi 4 kode berdasarkan sisa waktu evakuasi mulai dari aman hingga bahaya yaitu hijau (≥12h), kuning (≤12h), oranye (≤5h), dan merah(≤2h). Dalam keberjalanannya selama periode Des’18-Juli’19, ketinggian elevasi muka air Sungai Kelay beberapa kali melewati batas hijau dan kuning. Ketika kondisi ini terjadi, instrumen pemantauan secara otomatis mengirimkan peringatan melalui surel, sms, serta fitur whatsapp sesuai dengan peruntukan tingkatan peringatannya. Sistem mitigasi ini juga memberikan peringatan secara otomatis melalui alarm yang terpasang di Control Room. Dengan adanya notifikasi secara otomatis, informasi peringatan dapat tersampaikan dengan cepat sehingga proses evakuasi di lapangan dapat segera dilakukan sesuai prosedur mitigasi bencana banjir PT Berau Coal. Kata kunci: peringatan dini, mitigasi banjir, hec-hms, hec-ras, neural network   ABSTRACT   Pit E and Pit 7B West  are Pits located in Block-7 Binungan Mine Operation of PT Berau Coal which is adjacent to the river bank. The Pits have high risk of flood potential from the river. Kelay River belongs to the Great River category because the river basin area (DAS) is covering 7,027km2 (>500km2) and the length of ± 155km. In line with the increase of PT Berau Coal's (PTBC) production target in 2019 resulting the advancement of Pits mining sequence towards the north approching the river bank. This condition will cause a high risk of overflowing the Kelay River water to Pit Block-7 especially when the heavy rain occurred in the upstream of the river. Flood that occurs inside the mining area will affect safety conditions of mining operations and the overall production achievements of PT Berau Coal in 2019. Historically, flood had been occurred in June, 2017 where the flood from Kelay River overflowed at +8.3 elevation through the swamp area in the north and inundated Pit 7B West. Thus, the mitigation system has built at the end of 2017 and completed by the end of 2018. The mitigation system covered from bathymetry data collection, HEC-HMS, HEC-RAS to Neural Network analysis which results the water elevation prediction for each predetermined monitoring station. This prediction time will be used as lag time for the evacuation of equipments and human. This system is also integrated with automatic monitoring instruments as off Automatic Rain Gauge and Automatic Water Level Recorder at the Kelay River’s upstream and downstream station. The overall system will generate fast and accurate analysis results based on actual condition, also describe affected flood area for 50 year return period, and recommendations for the appropriate flood embankment geometry in areas that need to be protected. Mitigation system is divided into 4 codes based on remaining evacuation time as off green(≥12h), yellow (≤12h), orange (≤5h), and red (≤2h). Along December 2018 to July 2019, several elevations were exceeded the green and yellow code. This event triggered the monitoring instrument to automatically sends warning notification via e-mail, message, and whatsapp. The system also provides an automatic warning through alarm installed in Control Room. With the automatic notifications, warning can be conveyed quickly to carry out field evacuation process immediately according to Flood Mitigation Procedure of PT Berau Coal.   Keywords: early warning, flood mitigation, hec-hms, hec-ras, neural network