zhang siyu

Dr. zhang siyu


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 June 2022 in Mathematics
Verified
Journal Article
Open access
PDF file
QJQingqing Ji
Qingqing Ji
ZSzhang siyu
zhang siyu
QDQiao Duan
Qiao Duan
YGYuhan Gong
Yuhan Gong
YLYaowei Li
Yaowei Li
XZXu Zhao
Xu Zhao
With the continuous development of economy and society, power demand forecasting has become an important task of the power industry. Accurate power demand forecasting can promote the operation and development of the power supply industry. However, since power consumption is affected by a number of factors, it is difficult to accurately predict the power demand data. With the accumulation of data in the power industry, machine learning technology has shown great potential in power demand forecasting. In this study, gradient boosting decision tree (GBDT), extreme gradient boosting (XGBoost) and light gradient boosting machine (LightGBM) are integrated by stacking to build an XLG-LR fusion model to predict power demand. Firstly, preprocessing was carried out on 13 months of electricity and meteorological data. Next, the hyperparameters of each model were adjusted and optimized. Secondly, based on the optimal hyperparameter configuration, a prediction model was built using the training set (70% of the data). Finally, the test set (30% of the data) was used to evaluate the performance of each model. Mean absolute error (MAE), root mean square error (RMSE), mean absolute percentage error (MAPE), and goodness-of-fit coefficient (R^2) were utilized to analyze each model at different lengths of time, including their seasonal, weekly, and monthly forecast effect. Furthermore, the proposed fusion model was compared with other neural network models such as the GRU, LSTM and TCN models. The results showed that the XLG-LR model achieved the best prediction results at different time lengths, and at the same time consumed the least time compared to the neural network model. This method can provide a more reliable reference for the operation and dispatch of power enterprises and future power construction and planning.

24 November 2022
Verified
Book Chapter
Closed access
PDF file
VTVanha Tran
Vanha Tran
LWLizhen Wang
Lizhen Wang
ZSzhang siyu
zhang siyu
JZJinpeng Zhang
Jinpeng Zhang
SPSonTung Pham
SonTung Pham