Dr. Muhammad Auchar Zardari

Dr. Dr. Muhammad Auchar Zardari

orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2013 in Canadian Geotechnical Journal
Verified
Journal Article
Closed access
LOLinda Ormann
Linda Ormann
DZDr. Muhammad Auchar Zardari
Dr. Muhammad Auchar Zardari
HMHans Mattsson
Hans Mattsson
ABAnnika Bjelkevik
Annika Bjelkevik
SKSven Knutsson
Sven Knutsson
The consolidation process could be slow in an upstream tailings dam; therefore, the stability can reduce due to an increase in excess pore pressures when the dam is raised. The safety of the dam can be enhanced by constructing rockfill berms on the downstream side. This paper presents a case study on the strengthening of an upstream tailings dam with rockfill berms. The finite element analyses were performed for modelling the staged construction of the dam and for optimizing the volume of the rockfill berms. The dam was raised in 11 stages; each stage consisting of a raising phase and a consolidation phase. The study shows that the slope stability of the dam reduced due to an increase of excess pore pressures during the raising phase. The stability of the dam was successfully improved by utilizing rockfill berms as supports on the downstream side. A technique has been presented to minimize the volume of the rockfill berms so that the required stability can be achieved at minimum cost. This paper shows that the finite element method can be a useful tool for modelling the consolidation behaviour of an upstream tailings dam and minimizing the volume of the rockfill berms that may be needed to maintain the stability of the dam during staged construction.

1 January 2017 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
DZDr. Muhammad Auchar Zardari
Dr. Muhammad Auchar Zardari
HMHans Mattsson
Hans Mattsson
SKSven Knutsson
Sven Knutsson
MKMuhammad Shehzad Khalid
Muhammad Shehzad Khalid
MAMaria V. S. Ask
Maria V. S. Ask
BLBjörn Lund
Björn Lund
Much of the seismic activity of northern Sweden consists of micro-earthquakes occurring near postglacial faults. However, larger magnitude earthquakes do occur in Sweden, and earthquake statistics indicate that a magnitude 5 event is likely to occur once every century. This paper presents dynamic analyses of the effects of larger earthquakes on an upstream tailings dam at the Aitik copper mine in northern Sweden. The analyses were performed to evaluate the potential for liquefaction and to assess stability of the dam under two specific earthquakes: a commonly occurring magnitude 3.6 event and a more extreme earthquake of magnitude 5.8. The dynamic analyses were carried out with the finite element program PLAXIS using a recently implemented constitutive model called UBCSAND. The results indicate that the magnitude 5.8 earthquake would likely induce liquefaction in a limited zone located below the ground surface near the embankment dikes. It is interpreted that stability of the dam may not be affected due to the limited extent of the liquefied zone. Both types of earthquakes are predicted to induce tolerable magnitudes of displacements. The results of the postseismic slope stability analysis, performed for a state after a seismic event, suggest that the dam is stable during both the earthquakes.

4 April 2020 in Engineering, Technology & Applied Science Research
Verified
Journal Article
Open access
PDF file
ABA. H. Bhutto
A. H. Bhutto
GBG. S. Bhurgri
G. S. Bhurgri
SZS. Zardari
S. Zardari
DZDr. Muhammad Auchar Zardari
Dr. Muhammad Auchar Zardari
RBRiaz Bhabhro
Riaz Bhabhro
BMB. A. Memon
B. A. Memon
Numerical analysis for the safe rate determination of lowering of an embankment dam was performed in this study with the use of the finite element method. Coupled deformation and consolidation analysis were carried out for staged construction and drawdown of a 59m embankment dam for varying undrained shear strength of the clay core. The lowering of the reservoir was performed at different depths between two extreme scenarios, i.e. rapid lowering rate (1m/day) and slow lowering rate (0.1m/day). The reservoir of the dam was lowered to a depth from 10m to 55m in gradual increments. The results indicated that the safety of the dam was satisfactory when the reservoir was lowered at the quick rate for a depth of 10m, 20m, 30m respectively when the undrained shear strength of the clay core was taken as 20, 25 and 30kN/m2. Regarding the case of slow drawdown rate of the reservoir, it was found that the reservoir could be lowered up to a depth of 55m at a rate of 0.1m/day when the undrained strength of clay core was 25kN/m2. The stability of the dam was also found satisfactory even though the reservoir was lowered at a rate of 0.25m/day for a depth of 55m when the undrained shear strength of clay core was 30kN/m2.

6 May 2018 in Scientia Iranica
Verified
Journal Article
Closed access
PDF file
RBRiaz Bhanbhro
Riaz Bhanbhro
RKRoger Knutsson
Roger Knutsson
DZDr. Muhammad Auchar Zardari
Dr. Muhammad Auchar Zardari
TETommy Edeskär
Tommy Edeskär
SKSven Knutsson
Sven Knutsson
In an upstream tailings dam, loose layers might occur at different depths due to melting of frozen layers deposited during freezing temperature in Sweden. Reduced shear strength of such layers in a tailings dam might cause stability problems. Due to slow consolidation process, it is unknown, whether self-weight of a high tailings dam could have influence on strength and stiffness of soft tailings located at different depths. For numerical modelling, appropriate strength and stiffness properties of soft tailings are needed. For this purpose, loose layers in an upstream tailings dam were identified based on results of cone penetration tests. Consolidated Drained (CD) triaxial tests were conducted on undisturbed soft tailings collected from different depths of the dam. The results indicated that depth did not have considerable influence on strength and stiffness of tailings. Hardening Soil Model (HSM), at high confining pressures and axial strains underestimated stiffness of soft tailings under CD triaxial state. This study shows that: (i) proper care is needed in evaluating strength and stiffness parameters for soft tailings, and (ii) use of the HSM is likely to predict more deformations which could give an early warning before an actual failure of a tailings dam.

1 March 2021 in Journal of Materials in Civil Engineering
Verified
Journal Article
Closed access
PDF file
RBRiaz Bhabhro
Riaz Bhabhro
DZDr. Muhammad Auchar Zardari
Dr. Muhammad Auchar Zardari
BMBashir Ahmed Memon
Bashir Ahmed Memon
MSMukhtiar Ali Soomro
Mukhtiar Ali Soomro
TETommy Edeskär
Tommy Edeskär
SKSven Knutsson
Sven Knutsson
Tailings dam disasters are reported almost every year and are triggered by mechanisms, such as overtopping, piping, and others. The failures due to inadequate management cannot be neglected as well. These dams are constructed mostly in a step-by-step construction method that leads to a continuously changing state of vertical loads during construction and may lead to particle breakage and changes in strength. Therefore, a layer of tailings dam today may not be the same tomorrow during the construction phase. To study the effects of different loads on particle breakage and strength, direct shear tests were performed on remolded tailings samples that were separated into different particle sizes. The tests were performed using different normal stresses that ranged from 50 to 500 kPa. The results indicate that finer tailings exhibited slightly more shear resistance than that of coarser tailings irrespective of the deposition method. For normally deposited specimen, the dilatant and contractant behavior in vertical height was observed when the normal effective stress was less than 300 kPa and greater than 300 kPa, respectively. Under the vertical deposition method, the finer tailings showed contractant height behavior when subjected to a normal effective stress of 300 kPa. The friction angle and the cohesion of vertically deposited specimens were slightly higher and slightly lower, respectively, than that of normally deposited ones. The breakage of tailings particles was observed to be proportional to the particle size of the tailings.

22 October 2018 in Scientia Iranica
Verified
Journal Article
Closed access
PDF file
ASAbdullah Saand
Abdullah Saand
DZDr. Muhammad Auchar Zardari
Dr. Muhammad Auchar Zardari
MKManthar Ali Keerio
Manthar Ali Keerio
SSSabir Hussain Shaikh
Sabir Hussain Shaikh
DBDaddan Khan Bangwar
Daddan Khan Bangwar
Due to increased use of brick masonry for construction of buildings in Pakistan, huge quantities of Brick Kiln Waste (BKW) are generated which not only create disposal problems but are a hazard to the environment. In order to get rid of such problems, it is necessary to investigate suitability of the BKW as a stabilizer to the clayey soils. For this purpose, an experimental program was carried out to stabilize clayey soil with the BKW ranging from 5 to 40%. Basic geotechnical tests were performed on the clayey soil blended with the BKW. The results showed that the clayey soil became coarser and more suitable as a subgrade material with addition of the BKW. There was negligible reduction in dry density up to 7% when the BKW added was 40%. As expected, the cohesion and friction angle of the blended soils respectively decreased and increased with inclusion of the BKW. As compared to the clayey soil, the ultimate bearing capacity of the blended soil having 40% of the BKW increased by 21%. This study shows that clayey soils stabilized with the BKW could be used as a partial fill material for highway embankments and foundations of buildings.