Modular design, Axiomatic design (AD) and Theory of inventive problem solving (TRIZ) have been increasingly popularized in concept design of modern mechanical product. Each method has their own advantages and drawbacks. The benefit of modular design is reducing the product design period, and AD has the capability of problem analysis, while TRIZ’s expertise is innovative idea generation. According to the complementarity of these three approaches, an innovative and systematic methodology is proposed to design big complex mechanical system. Firstly, the module partition is executed based on scenario decomposition. Then, the behavior attributes of modules are listed to find the design contradiction, including motion form, spatial constraints, and performance requirements. TRIZ tools are employed to deal with the contradictions between behavior attributes. The decomposition and mapping of functional requirements and design parameters are carried out to construct the structural hierarchy of each module. Then, modules are integrated considering the connections between each other. Finally, the operation steps in application scenario are designed in temporal and spatial dimensions. Design of cutter changing robot for shield tunneling machine is taken as an example to validate the feasibility and effectiveness of the proposed method.
6 February 2023 in Advances in Mechanical Engineering
Cutterhead is the key component of the mega shaft boring machine (SBM), whose complex structure and huge size lead to high manufacturing difficulty and cost, and its reliability is difficult to guarantee under huge loads. It is difficult to design the cutterhead only referring to the existing small horizontal tunnel boring machine cutterhead. In order to brainstorm innovative ideas, the paper incorporates the TRIZ into AD to address the following issues. Firstly, engineering conflicts in designing process are eliminated by TRIZ tools to generating innovative ideas. Then, the decomposition of functional requirements and design parameters are employed based on independence axiom of AD, transferring the abstract ideas into concrete design solutions. Moreover, fuzzy comprehensive evaluation is adopted to choose a better design scheme from alternatives of critical component. Finally, the feasibility and practicality of the proposed approach has been demonstrated through case study of designing a novel mega SBM cutterhead. The cutterhead structure is significantly improved with embedded movable cutter boxes, which can excavate step by step to reduce the driving torque, and the manufacturing and transportation cost has been greatly reduced. The method can help designer to innovative design the key components of large-scale underground tunneling equipment.
25 February 2021 in Arabian Journal for Science and Engineering
TBM tunnel surrounding rock classification is a key indicator for supporting decision-making and ensuring safe construction. And predicting the surrounding rock type accurately in advance is of great significance for TBM intelligent construction. This paper established the surrounding rock classification model based on support vector machine (LIBSVM), including preprocesses historical tunneling parameters, extracts data information that can accurately reflect the relationship between rock and machine, analyzes the correlation between different parameters and surrounding rock categories, and obtains highly relevant parameters. Based on the long short-term memory (LSTM), the prediction model of total thrust, cutter head torque, gripper pressure, cutter head rotate speed, and propulsion speed are established, which is the strongly correlated parameters with surrounding rock. Combining the parameter prediction model with the surrounding rock classification algorithm, the LSTM-SVM tunnel surrounding rock classification prediction model is established. The results showed that the coefficient of determination of the total thrust model, the cutter head torque, the gripper pressure, the cutter head speed, and the propulsion speed were 0.9825, 0.9396, 0.9974, 0.9843, and 0.9636. The overall prediction accuracy of the surrounding rock category can reach 86.0686%, which can provide a certain reference for predicting the surrounding rock condition in a short distance.
3 December 2021 in Geotechnical and Geological Engineering