Liyang Wang

Liyang Wang

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 November 2024 in International Journal of Managing Projects in Business
Verified
Journal Article
Closed access
LWLiyang Wang
Liyang Wang
YSYanfang Sun
Yanfang Sun
RTRobert L.K. Tiong
Robert L.K. Tiong
Purpose: This study aims to explore how institutional quality impacts private capital participation in large-scale infrastructure development, particularly in public–private partnership (PPP) projects, aiming to enhance incentives for private sector involvement.Design/methodology/approach: Building on new institutional theory, a triangular theoretical framework was constructed to analyze the high participation of private capital in PPP projects, focusing on seven key institutional factors. Data from 1,319 PPP projects across 36 Belt and Road Initiative (BRI) countries from 2015 to 2020 were then analyzed using a combination of necessary condition analysis (NCA) and fuzzy set qualitative comparative analysis (fsQCA) to evaluate the combined impact and interactions of these factors.Findings: Results indicate that high private capital participation does not hinge on a single institutional quality factor but results from the synergistic influence of multiple factors. The paths leading to high private capital participation can be categorized as regulatory-led, normative-cognitive synergistic, regulatory-normative synergistic and institutional failure-led. Among these, regulatory quality plays a central role in the regulatory-led; the synergy between political stability and voice and accountability is pivotal in the normative-cognitive synergistic, and the rule of law, in combination with voice and accountability, is essential to the regulatory-normative synergistic.Originality/value: This research systematically examines the multidimensional impact of institutional quality, revealing how different institutional factors interact to influence private capital’s willingness to participate and behavior. It enriches applied research in institutional economics within PPP projects and provides a new theoretical perspective and methodological framework to the scholarly community.

4 April 2022 in Buildings
Verified
Journal Article
Open access
PDF file
YSYanfang Sun
Yanfang Sun
LWLiyang Wang
Liyang Wang
TZTao Zhang
Tao Zhang
Public–private partnership (PPP) projects have been widely applied in infrastructure construction. Leveraging private capital is the key to promoting the high-quality development of PPP projects. This study examines the combined effect of seven factors determining private enterprises that participate in PPP and collects materials from 102 PPP sewage treatment projects to examine the causal configuration path of private enterprises participating in PPP (PEP3P) from an overall perspective by using necessary condition analysis (NCA) and fuzzy-set qualitative comparative analysis (fsQCA). The findings support the fact that any single antecedent condition is not a necessary condition for PEP3P and is instead the combined effect of different factors that commonly form the diversified causal configuration paths of PEP3P. There is an obvious asymmetry between the configuration paths of the high participation and low participation of private enterprises. The enterprise technology level (ETL) and doing business (DB) are important internal driving forces and give external traction for PEP3P, while the enterprise credit level (ECL) and project investment scale (PIS) are important factors that restrict private enterprises from participating in PPP. This research fills a theoretical gap for PEP3P and can be applied to developing strategies for attracting private enterprises to participate in PPP.