Franz Tscheikner-Gratl

Franz Tscheikner-Gratl

orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 February 2018 in Structure and Infrastructure Engineering
Verified
Journal Article
Open access
DWDaniel Winkler
Daniel Winkler
Markus HaltmeierMarkus Haltmeier
Markus Haltmeier
Manfred KleidorferManfred Kleidorfer
Manfred Kleidorfer
WRWolfgang Rauch
Wolfgang Rauch
FTFranz Tscheikner-Gratl
Franz Tscheikner-Gratl
Pipe failure modelling is an important tool for strategic rehabilitation planning of urban water distribution infrastructure. Rehabilitation predictions are mostly based on existing network data and historical failure records, both of varying quality. This paper presents a framework for the extraction and processing of such data to use it for training of decision tree-based machine learning methods. The performance of trained models for predicting pipe failures is evaluated for simple as well as more advanced, ensemble-based, decision tree methods. Bootstrap aggregation and boosting techniques are used to improve the accuracy of the models. The models are trained on 50% of the available data and their performance is evaluated using confusion matrices and receiver operating characteristic curves. While all models show very good performance, the boosted decision tree approach using random undersampling turns out to have the best performance and thus is applied to a real world case study. The applicability of decision tree methods for practical rehabilitation planning is demonstrated for the pipe network of a medium sized city.

24 January 2017 in Water
Verified
Journal Article
Open access
PDF file
FTFranz Tscheikner-Gratl
Franz Tscheikner-Gratl
PEPatrick Egger
Patrick Egger
WRWolfgang Rauch
Wolfgang Rauch
Manfred KleidorferManfred Kleidorfer
Manfred Kleidorfer
The decisions taken in rehabilitation planning for the urban water networks will have a long lasting impact on the functionality and quality of future services provided by urban infrastructure. These decisions can be assisted by different approaches ranging from linear depreciation for estimating the economic value of the network over using a deterioration model to assess the probability of failure or the technical service life to sophisticated multi-criteria decision support systems. Subsequently, the aim of this paper is to compare five available multi-criteria decision-making (MCDM) methods (ELECTRE, AHP, WSM, TOPSIS, and PROMETHEE) for the application in an integrated rehabilitation management scheme for a real world case study and analyze them with respect to their suitability to be used in integrated asset management of water systems. The results of the different methods are not equal. This occurs because the chosen score scales, weights and the resulting distributions of the scores within the criteria do not have the same impact on all the methods. Independently of the method used, the decision maker must be familiar with its strengths but also weaknesses. Therefore, in some cases, it would be rational to use one of the simplest methods. However, to check for consistency and increase the reliability of the results, the application of several methods is encouraged.

21 October 2019 in Urban Water Journal
Verified
Journal Article
Open access
FTFranz Tscheikner-Gratl
Franz Tscheikner-Gratl
NCNicolas Caradot
Nicolas Caradot
FCFrédéric Cherqui
Frédéric Cherqui
Joao P LeitaoJoao P Leitao
Joao P Leitao
MAMehdi Ahmadi
Mehdi Ahmadi
Francois ClemensFrancois Clemens
Francois Clemens
Sewer asset management gained momentum and importance in recent years due to economic considerations, since infrastructure maintenance and rehabilitation directly represent major investments. Because physical urban water infrastructure has life expectancies of up to 100 years or more, contemporary urban drainage systems are strongly influenced by historical decisions and implementations. The current decisions taken in sewer asset management will, therefore, have a long-lasting impact on the functionality and quality of future services provided by these networks. These decisions can be supported by different approaches ranging from various inspection techniques, deterioration models to assess the probability of failure or the technical service life, to sophisticated decision support systems crossing boundaries to other urban infrastructure. This paper presents the state of the art in sewer asset management in its manifold facets spanning a wide field of research and highlights existing research gaps while giving an outlook on future developments and research areas.

1 March 2019 in Water Research
Verified
Journal Article
Open access
FTFranz Tscheikner-Gratl
Franz Tscheikner-Gratl
Vasilis BellosVasilis Bellos
Vasilis Bellos
ASAlma Schellart
Alma Schellart
ARAntonio Moreno Rodenas
Antonio Moreno Rodenas
MMManoranjan Muthusamy
Manoranjan Muthusamy
STSimon Tait
Simon Tait
This paper aims to stimulate discussion based on the experiences derived from the QUICS project (Quantifying Uncertainty in Integrated Catchment Studies). First it briefly discusses the current state of knowledge on uncertainties in sub-models of integrated catchment models and the existing frameworks for analysing uncertainty. Furthermore, it compares the relative approaches of both building and calibrating fully integrated models or linking separate sub-models. It also discusses the implications of model linkage on overall uncertainty and how to define an acceptable level of model complexity. This discussion includes, whether we should shift our attention from uncertainties due to linkage, when using linked models, to uncertainties in model structure by necessary simplification or by using more parameters. This discussion attempts to address the question as to whether there is an increase in uncertainty by linking these models or if a compensation effect could take place and that overall uncertainty in key water quality parameters actually decreases. Finally, challenges in the application of uncertainty analysis in integrated catchment water quality modelling, as encountered in this project, are discussed and recommendations for future research areas are highlighted.

19 February 2015 in Urban Water Journal
Verified
Journal Article
Closed access
FTFranz Tscheikner-Gratl
Franz Tscheikner-Gratl
Robert SitzefreiRobert Sitzefrei
Robert Sitzefrei
WRWolfgang Rauch
Wolfgang Rauch
Manfred KleidorferManfred Kleidorfer
Manfred Kleidorfer
Due to the changes in water management, from the construction of new systems to the rehabilitation of existing networks, integrated strategic rehabilitation management has become more and more important. Consequently, this paper shows a method that considers sewer and water distribution networks against environmental factors (e.g. street network and connected buildings) in a priority model. This approach aids in not only identifying areas where rehabilitation is technically necessary but also economically recommendable (e.g. completely depreciated). This is achieved by implementing factors of structural resiliency, vulnerability of the network, capital value and other network components (e.g. manholes, house connections). This model is applied to a medium sized case study in which the rehabilitation areas identified by the developed model are compared to the actual rehabilitation plans of the water and sewage companies. Results also show the application of the estimated ranking for rehabilitation planning with a fixed budget.

1 July 2019 in Water Research
Verified
Journal Article
Open access
ARAntonio Moreno Rodenas
Antonio Moreno Rodenas
FTFranz Tscheikner-Gratl
Franz Tscheikner-Gratl
JLJeroen Langeveld
Jeroen Langeveld
FCFrancois H.L.R. Clemens
Francois H.L.R. Clemens
Receiving water quality simulation in highly urbanised areas requires the integration of several processes occurring at different space-time scales. These integrated catchment models deliver results with a significant uncertainty level associated. Still, uncertainty analysis is seldom applied in practice and the relative contribution of the individual model elements is poorly understood. Often the available methods are applied to relatively small systems or individual sub-systems, due to limitations in organisational and computational resources. Consequently this work presents an uncertainty propagation and decomposition scheme of an integrated water quality modelling study for the evaluation of dissolved oxygen dynamics in a large-scale urbanised river catchment in the Netherlands. Forward propagation of the measured and elicited uncertainty input-parametric distributions was proposed and contrasted with monitoring data series. Prior ranges for river water quality-quantity parameters lead to high uncertainty in dissolved oxygen predictions, thus the need for formal calibration to adapt to the local dynamics is highlighted. After inferring the river process parameters with system measurements of flow and dissolved oxygen, combined sewer overflow pollution loads became the dominant uncertainty source along with rainfall variability. As a result, insights gained in this paper can help in planning and directing further monitoring and modelling efforts in the system. When comparing these modelling results to existing national guidelines it is shown that the commonly used concentration-duration-frequency tables should not be the only metric used to select mitigation alternatives and may need to be adapted in order to cope with uncertainties.