Taking a deep excavation in Suzhou soft soils adopting three support schemes as the background, the excavation performance metrics, including the heave and lateral deformation of diaphragm walls, surface vertical deformation, vertical deformation of surrounding buildings, and earth pressure, are thoroughly investigated based on 15 excavation cases collected in the soft soil area of Suzhou. Based on the analysis of monitoring data, some findings were achieved: the foundation pit deformation is greatly affected by the spatial effect. The existing station can constrain the foundation pit deformation. Benefiting from the combination of various support solutions, the average maximum deflection of the diaphragm wall is 0.10% He. The maximum lateral movement depth of the diaphragm wall (δhm) is mainly located at (He-7, He+12.5). The vertical deformation of the wall top is greatly affected by the excavation exposure time and soil conditions. The heave range of the wall top is (−0.08∼0.26%) He. Under the action of the displacement of the diaphragm wall to outside the pit and the upward displacement of the wall top, the ground surface is uplifted, and the maximum uplift is (0.02∼0.14%) He, ranging from 0.12δhm to 1.13δhm. The maximum surface settlement is (−0.01% ∼ −0.15%) He, ranging from −0.22δhm to −3.11δhm. The form of building heave is mainly affected by the surface heave and the distance from the diaphragm wall (d). When d is within a certain range, there is a heave settlement difference between the adjacent side and the opposite side of the excavation, and the adjacent side undergoes mostly subsidence, while the opposite side undergoes mostly uplift. The peak value of the apparent earth pressure (AEP) envelope is 0.59γHe, which falls within (0.47∼0.78) He. The calculation scheme proposed by Kim can be used to predict the AEP for multiple soil types.
Deep foundation pit construction adjacent to a subway station in a soft soil area was numerically simulated with Midas GTS NX calculation software. The influence of the deep foundation pit construction on the deformation and stress of the subway station structure was studied, and the influence of the foundation pit retaining structure on the station was analyzed. The results show that during the foundation pit excavation process, the subway station slab rose as a whole and was greatly affected by the deformation of the common ground connecting wall, with the most unfavorable position changing as the excavation area changed. The excavation of foundation pits in different zones had a considerable influence on the east‐to‐west displacement of the common diaphragm wall outside the foundation pit. The maximum positive bending moment of the common diaphragm wall changed little, while the negative bending moment increased greatly during construction. Overall, the foundation pit excavation had a great impact on the negative moment of the common diaphragm wall. During the foundation pit excavation process, the subway station column lifted upward, and the maximum displacement, which was located at the west end of the station near the foundation pit, gradually weakened from west to east. As the foundation pit excavation process continued, the maximum axial force of the station column increased by 10.38%, and the pressure was the largest in the middle column. As the thickness of the diaphragm wall increased, the stiffness of the foundation pit retaining structure increased. After earthwork excavation and unloading, the locations in the retaining structure with high stiffnesses could resist deformations. The whole foundation pit was offset due to the high stiffness of the foundation pit retaining structure, which increased the horizontal deformation of the existing station structure. With increasing thickness, the relative horizontal deformation of the station slab gradually increased, mainly because the difference between the depths of the old and new diaphragm walls caused the embedded soil of the two same deep foundation pits to differ. Furthermore, there were great differences in the Earth pressure behind the wall. As the depth of the diaphragm wall increased, the active Earth pressure behind the diaphragm wall increased.
The impact of shield construction on the close lateral passing of high-speed railways can threaten the safety of operating high-speed railways. To study the deformation characteristics of the shield structure after the application of isolation piles from the ground surface and the deformation characteristics of the bridge piers of an overpassing high-speed railway, we analyze the mechanism of isolation pile restraint control and establish a three-dimensional numerical model of a shield structure to study the situation of a high-speed railway with a metro interval under passing a high-speed railway passenger line project. Combined with the measured data and numerical simulation data of the same construction stage, we study the impact of shield structure lateral passing on high-speed railway piers and surrounding ground surface in terms of the disturbance changes and the effect of isolation, as well as the effect of the lateral passing of the shield tunnel on the surface of the bridge piers and the surrounding area and the control effect of the isolation piles on the deformation. The results show that the isolation pile can block the development of the soil layer rupture surface and the stress path. The isolation pile has a good control effect on the vertical displacement of the bridge pier. The vertical displacement of the bridge pier decreases from 0.6 mm to 1.1 mm after the single- and double-track tunneling, and the displacement changes along the depth direction from non-uniform to relatively uniform. The vertical displacement of the ground surface includes both uplift and settlement, which occur at the same time. When the shield tunneling advances, the form of the ground settlement trough is changed from a “V” shape formed by the right single-track tunneling to a “W” shape after the double-track tunneling. The isolation pile can effectively control the influence range of tunnel excavation; its lateral displacement form changes regularly, and the lateral uplift is always in a “double-C outward expansion” shape. The initial excavation greatly disturbs the initial stress field, so it is necessary to pay attention to the control and management of measures to destroy the initial stress field.
1 November 2017 in Journal of Central South University
To reduce the effects of earthquakes on the ancient Small Wild Goose Pagoda, a shape memory alloy-suspension pendulum damping system (SMA-SPDS) is developed by combining superelastic SMAs with damping pendulum theory. A MATLAB/Simulink simulation model of the SMA-SPDS is established and tested on a 1:10 scale model of the Pagoda. After verifying and comparing the simulation data with experimental results, a shock absorption analysis is performed on the prototype Pagoda. The optimum engineering design for the prototype structure of the Small Wild Goose Pagoda using SMA-SPDS for shock absorption protection in the future is put forward. The results show that the performance of the SMA-SPDS system is stable, and it can improve the integrity of the original structure of the Pagoda for better performance during earthquakes. In addition, with an increment in seismic intensity, the SMA-SPDS shows an apparent controlling effect. The Simulink simulation results of the model structure of the Small Wild Goose Pagoda are in good agreement with the test results. The Simulink simulation method can simulate the seismic response of the model structure of the Small Wild Goose Pagoda well, with and without SMA-SPDS, to obtain a more real damping effect of setting SMA-SPDS on the prototype structure; the engineering optimization of the location, quantity, and system performance parameters of SMA-SPDS in the prototype structure of the Small Wild Goose Pagoda has a remarkable effect, which can make the damping effect of SMA-SPDS reach more than 43% floor.
This study adopts the east approach bridge of the Section II extra-long-span bridge on the Urumqi Ring Expressway (West Line) as an engineering prototype. A three-dimensional nonlinear finite element push-out model of headed stud connectors was developed in ABAQUS/Explicit and validated against existing test data. On this basis, parametric analyses were carried out to investigate the effects of material and geometric parameters on the shear performance of the studs. The results indicate that the load–slip response can be divided into four stages: elastic, plastic-damage development, plateau, and softening. Compared with C50 concrete, UHPC markedly increases the initial stiffness of the connectors and raises the peak shear resistance by approximately 30–40%. For the smallest stud diameter, the ductility decreases by up to about 10% and the post-peak degradation becomes more rapid, i.e., ductility deterioration is more pronounced; this unfavorable effect is particularly significant when small stud diameter is combined with shallow embedment depth. Increasing the stud diameter enhances both stiffness and peak shear resistance, whereas increasing the embedment depth delays post-peak degradation, improves residual capacity and energy dissipation, and promotes a transition in failure mode from concrete-governed failure to ductile bending–shear failure of the stud. Based on these parametric results, a larger stud height-to-diameter ratio is recommended for UHPC composite structures to achieve coordinated optimization of connection stiffness, load-carrying capacity, and ductility performance.