Jianquan Wang

Dr. Jianquan Wang


Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 August 2019 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
TXTannan Xiao
Tannan Xiao
WTWeilin Tong
Weilin Tong
JWJianquan Wang
Jianquan Wang
Parallel computing is an effective tool to improve the efficiency of transient stability simulations. The method of forming the bordered block diagonal form matrix (BBDF method) is widely used. However, as the number of subnets increases, the computational complexity of the cut-node network and the communication overhead become large quickly, which limits the efficiency of the method. A new fully parallel BBDF (FBBDF) method is proposed to solve this problem. During the iterative solutions of network equations, the FBBDF method parallelizes the solutions of subnets and the solution of the cut-node network by utilizing the result of the cut-node network at previous iteration step for the solutions of subnets at current iteration step. The calculation time can be reduced from the total solution time of the largest subnet and the cut-node network to the largest solution time of subnets and the cut-node network. The whole network is divided via the factorization path graph. The test results show that the FBBDF method requires less computing time than the classic BBDF method and can increase the speedup of parallel computing to more than 16x with 40 threads in a 24886-node actual power system.

20 March 2020 in IET Generation, Transmission & Distribution
Verified
Journal Article
Open access
PDF file
TXTannan Xiao
Tannan Xiao
YZYu Zou
Yu Zou
YXYanhui Xia
Yanhui Xia
WTWeilin Tong
Weilin Tong
YGYifan Gao
Yifan Gao
JWJianquan Wang
Jianquan Wang
In many China's enterprise‐owned power grids (EPGs), the frequently changing operation state and the poor reliability of some outdated facilities may lead to inaccuracy or even malfunctions of the traditional pre‐decision‐making emergency control systems, which have already caused several blackouts in EPGs. To solve this problem, a real‐time decision‐making emergency control system based on the detailed time‐domain transient stability simulation is designed. Based on the trajectory characteristics of the stability restoration process of EPGs, the stability restoration criteria are proposed to significantly shorten the simulation time needed to judge the elimination of a certain stability problem. Fast decision‐making algorithms for frequency instability, rotor angle instability and branch overload with relatively low computational cost are introduced. Control strategies can be determined within a specific time after faults are detected. The corresponding countermeasures are directly executed when the strategy is obtained. The system configuration is designed to be capable of dealing with complicated and unanticipated faults, such as cascading outages and unexpected grid splitting. The test results of a 31‐node practical EPG show that the proposed algorithms and the system configuration are practical and efficient. This work is a meaningful exploration of the real‐time decision‐making emergency control system.

18 July 2019 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
TXTannan Xiao
Tannan Xiao
WTWeilin Tong
Weilin Tong
JWJianquan Wang
Jianquan Wang
In the power system parallel transient stability simulation (TSS), the parallel overhead will rise significantly with the increase in concurrency, which will seriously affect the efficiency of parallel computing. However, there are relatively few studies on the parallel overhead in the power system research field at present. In this paper, the geneses of the parallel overhead are introduced from the point of view of computer technology. The composition of the parallel overhead of the bordered block diagonal form (BBDF) method and the nested BBDF (NBBDF) method of the power system parallel TSS is analyzed. The time consumption of computing tasks and the parallel overhead of the BBDF method and the NBBDF method implemented by MPI and OpenMP under different thread scheduling patterns are tested in detail in 2383wp system and two practical power systems (13490-node and 24886-node). On this basis, an efficient implementation of the NBBDF method based on subnet-core mapping and mixed programming of MPI and OpenMP is suggested, which can further reduce the parallel overhead and increase the speedup ratio to more than 17x with 64 cores in a 24886-node system. At last, some rules are summarized based on the test results.

1 December 2013 in Journal of Alloys and Compounds
Verified
Journal Article
Closed access
BZBaoguo Zhang
Baoguo Zhang
JWJianquan Wang
Jianquan Wang
QZQu Zuopeng
Qu Zuopeng
XTXiujian Tang
Xiujian Tang
WWWanglong Wang
Wanglong Wang
PWPengxiao Wang
Pengxiao Wang

1 August 2019 in Frontiers of Information Technology & Electronic Engineering
Verified
Journal Article
Closed access
PDF file
YGYi-Fan Gao
Yi-Fan Gao
JWJianquan Wang
Jianquan Wang
TXTan-Nan Xiao
Tan-Nan Xiao
DJDao-Zhuo Jiang
Dao-Zhuo Jiang
To simplify the transient stability analysis of a large-scale power system and realize real-time emergency control, a fast transient stability simulation algorithm based on real-time dynamic...

30 October 2017 in Energies
Verified
Journal Article
Open access
PDF file
YGYifan Gao
Yifan Gao
JWJianquan Wang
Jianquan Wang
TXTannan Xiao
Tannan Xiao
DJDaozhuo Jiang
Daozhuo Jiang
In order to reduce the online calculations for power system simulations of transient stability, and dramatically improve numerical integration efficiency, a transient stability numerical integration algorithm for variable step sizes based on virtual input is proposed. The method for fully constructing the nonhomogeneous virtual input for a certain integration scheme is given, and the calculation method for the local truncation error of the power angle for the corresponding integration scheme is derived. A step size control strategy based on the predictor corrector variable step size method is proposed, which performs an adaptive control of the step size in the numerical integration process. The proposed algorithm was applied to both the IEEE39 system and a regional power system (5075 nodes, 496 generators) in China, and demonstrated a high level of accuracy and efficiency in practical simulations compared to the conventional numerical integration algorithm.