Train delays occur often in daily railway operations due to a variety of initiating incidents. On a heavily loaded mainline railway, a single train delay may lead to a series of secondary delays across the network. In this study, the authors describe a peer‐to‐peer system to solve train rescheduling problems in railway network bottlenecks. A designed Genetic Algorithm is chosen as the local search algorithm on each side. Based on the local search algorithm, different negotiation protocols are raised to find globally feasible solutions. The proposed approach is tested in a railway bottleneck section in the UK, and the computational result is compared with a centralised method to show its performance in terms of computation time and optimality.
25 September 2024 in Journal of Rail Transport Planning & Management
In this paper, the concept of Obstacle Detection and Track Intrusion Detection (OD&TID) systems related to the operation of trains is introduced, along with a potential concept for such a system. The main focus of the work presented here is the identification and description of system requirements and Use Cases (UC), their detailed classification, including general UCs for mainline railway and UCs specific to freight, as well as an analysis of the UCs and of the method used. The identified UCs have been organised with respect to the mode of operation, Grade of Automation (GoA), and operating conditions. The UCs were further analysed in different UC scenarios, including the pre-conditions, system response, actions made by OD&TID and associated systems and the post use conditions of the scenarios. The priority for implementation and complexity of each UC are discussed with respect to the probability of scenario occurrence and required interfaces. This work has been carried out as part of the process to evaluate implementation constraints, risks and requirements, and the operational scenarios of the OD&TID developed within the EU-funded Shift2Rail project SMART2, which aims to design and develop a prototype OD&TID system.
26 August 2021 in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
To increase operational efficiency, resilience and capacity of the railway system, the development of modern railway traffic management system (TMS) has attracted more and more attention in recent years. To support the development and implementation of the next generation of TMS and related applications, advanced data collection, transmission and processing approaches, digitalised databases, and virtual validation platforms, etc., are required. In the context of the TMS development (addressed by Technology Demonstrator 2.9 of Shift2Rail Innovation Programme 2), this support is to be provided by a scalable, interoperable and standardised communication platform for internal and external communication between different subsystems, applications and clients. This paper outlines the approach of the ongoing OPTIMA project aimed to develop a communication platform demonstrator for railway TMS based on a novel Integration Layer (IL) and its various interfaces to entities including integration layer services, TMS service, rail business service, external services and operator workstations. Further detailed discussion in this paper relates to the approach to validating the communication platform demonstrator as a functional entity, and as a virtual testing environment to validate railway traffic management and other applications. The validation approach for the applications tested on the communication platform demonstrator is also presented. The results of future implementation of this validation approach will be used to assess the functionality of the communications platform demonstrator developed, and the initial TMS applications tested on it, and form an important step towards developing and implementing IL based communications platforms for future TMSs.
Real-time train rescheduling is a widely used strategy to minimize knock-on delays in railway networks. While recent research has introduced intelligent solutions to railway traffic management, the tight interdependence of train timetables and the intrinsic complexity of railway networks have hindered the scalability of these approaches to large-scale systems. This paper proposes a multi-agent system (MAS) that addresses these challenges by decomposing the network into single-junction levels, significantly reducing the search space for real-time rescheduling. The MAS employs a Condorcet voting-based collaborative approach to ensure global feasibility and prevent overly localized optimization by individual junction agents. This decentralized approach enhances both the quality and scalability of train rescheduling solutions. We tested the MAS on a railway network in the UK and compared its performance with the First-Come-First-Served (FCFS) and Timetable Order Enforced (TTOE) routing methods. The computational results show that the MAS significantly outperforms FCFS and TTOE in the tested scenarios, yielding up to a 34.11% increase in network capacity as measured by the defined objective function, thus improving network line capacity.
Unpredictable fluctuant passenger flow usually exists in urban metro operations. In this situation, traditional predetermined metro timetables cannot always meet the variation of passenger flow, and thus the service quality of the metro system could be affected profoundly. In this paper, by introducing an innovative metro operation method without timetables, we develop a nonlinear integer programming model to continually optimise the train operation to deal with detected real-time passenger flow variations. We aim to minimise the total passenger waiting time in the research time horizon under the vehicle number constraint. A modified genetic algorithm integrated with a macroscopic metro simulator is adopted to solve the proposed model. A case study based on the Beijing Metro Line 19 is implemented to provide a quantitative result for evaluating the proposed passenger flow-oriented metro operation method without timetables. Compared to traditional timetable-based metro operation, the method could significantly improve the metro operation’s flexibility and the quality of services.