Maher Abu-Madi

Dr. Maher Abu-Madi

orcid

Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 May 2013 in Water International
Verified
Journal Article
Open access
MAMaher Abu-Madi
Maher Abu-Madi
NTNemanja Trifunovic
Nemanja Trifunovic
This paper analyzes the intermittent water distribution system in the West Bank, Palestine. It quantifies the impacts of reduced supply duration on the hydraulics and costs of water distribution. It shows that designing systems based on intermittent supply criteria implies increasing the diameters of pipes significantly, which is expensive and infeasible. The paper recommends that studying the local conditions should precede the design of new systems to avoid reduced supply duration and related negative impacts. In addition, improving governance, revising tariffs, reducing leakage, saving water, involving the private sector, and improving water diplomacy should be considered in any water policy reform.

1 August 2013 in Environmental Pollution
Verified
Journal Article
Closed access
MAMaher Abu-Madi
Maher Abu-Madi
MRMa'Moun Abu Rayyan
Ma'Moun Abu Rayyan

1 August 2003 in Water Supply
Verified
Journal Article
Closed access
MAMaher Abu-Madi
Maher Abu-Madi
OBO. Braadbaart
O. Braadbaart
RAR. Al-Sa'Ed
R. Al-Sa'Ed
GAG. Alaerts
G. Alaerts
Despite water scarcity and high agricultural water consumption in the Middle East and North Africa region, substantial amounts of treated wastewater are discharged into seas without proper utilization. This can be attributed to either farmers' unwillingness to use or to pay for reclaimed wastewater. Therefore, a field survey was conducted in Jordan and Tunisia, which are considered as representative to the MENA region, using a prepared and pilot tested questionnaire. This study applies the contingent valuation method to elicit the willingness of farmers to pay for reclaimed wastewater. Logistic regression analysis is applied in an attempt to build a model that correlates qualitative responses of farmers to monetary stimuli. The water price seriously affects farming profitability and farmers' willingness to pay for reclaimed wastewater. Farmers prove to be unwilling to pay more than 0.05 $/m3 of reclaimed wastewater primarily because of quality concerns, comparatively easy access to freshwater, and price.

4 May 2021 in International Journal of Water Resources Development
Verified
Journal Article
Closed access
MHMaher Hamdan
Maher Hamdan
AAAhmad Abu-Awwad
Ahmad Abu-Awwad
MAMaher Abu-Madi
Maher Abu-Madi
Limited water resources are among the main obstacles to development in Palestine. This research investigates farmers’ perceptions and willingness to use treated wastewater (TWW) for irrigation. Despite the availability of large quantities of TWW, just 11% of the interviewed farmers use it in irrigation. Just 24% of them confirmed that they had participated in awareness workshops related to TWW, but 75% stated they would be willing to use TWW for irrigation. We find that the main obstacles to the use of TWW in irrigation are availability of freshwater, non-availability of TWW and psychological aversion.

1 May 2008 in Water Science & Technology
Verified
Journal Article
Closed access
MAMaher Abu-Madi
Maher Abu-Madi
Rashed M.Y. Al-Sa'edRashed M.Y. Al-Sa'ed
Rashed M.Y. Al-Sa'ed
OBO. Braadbaart
O. Braadbaart
GAG. Alaerts
G. Alaerts
Despite water scarcity and high agricultural water demand in the Middle East and North Africa region, substantial proportions of treated wastewater are discharged into the environment and seas without proper utilization. All countries of the region, low pricing of reclaimed wastewater is a common tool to make reuse attractive. However, low pricing of reclaimed wastewater is ineffectual due to farmers' access to freshwater for irrigation at low tariff. Therefore, increasing the prices of freshwater in such a way that does not jeopardize feasibility of agriculture would promote irrigation with reclaimed wastewater even at increased prices. On one hand, it increases the gap between the price of freshwater and that of reclaimed wastewater, making the later more attractive. On the other hand, it would be used as a financial resource for funding the investment costs of the infrastructure needed for conveyance and distribution of reclaimed wastewater. This paper studies the viability of increasing the prices of freshwater and reclaimed wastewater. The results show that irrigation with reclaimed wastewater even for restricted irrigation can be as profitable as, and sometimes better than, freshwater irrigation. Some of the permitted crops such as fruit trees can be more profitable than vegetables. Thus, it appears that the level of knowledge farmers and others on the benefits of reclaimed wastewater is still limited.

15 October 2018 in Water
Verified
Journal Article
Open access
PDF file
GÖGül Özerol
Gül Özerol
JSJuliane Schillinger
Juliane Schillinger
MAMaher Abu-Madi
Maher Abu-Madi
Transdisciplinary research offers a promising approach to development cooperation programs by integrating knowledge from academic and non-academic stakeholders, and from natural and social sciences. In the context of development research on water, there is little evidence on how stakeholder involvement takes place in the three stages of transdisciplinary research (problem definition, knowledge production, and knowledge application). This paper aims to create empirical evidence and insights on this question based on the Palestinian-Dutch Academic Cooperation Programme on Water (PADUCO). Six research projects, which have been implemented within the first phase of PADUCO, were examined using the data collected through a survey and document reviews. The results show that research problems were defined according to societal needs and contextual factors. Research teams were multidisciplinary and included non-academic members, whereas the institutional involvement of non-academic stakeholders was limited and unbalanced between the governmental and non-governmental actors. Although the application of the knowledge produced was mainly focused on academia, opportunities for broad dissemination were utilized, albeit to a limited extent. Finally, there was a lack of monitoring and evaluation of impacts, which is explained by the budget and time limitations of such small-scale projects and can be mitigated by programme-level measures.