Water inrush hazard seriously threatens construction safety of subsea tunnels in unfavorable geological areas. In recent years, a large number of subsea tunnels have been built worldwide, some of which have experienced many water inrush disasters, especially in Japan and Norway. In this paper, a systematic methodology is proposed to rigorously review the current literature about water inrush in subsea tunnels. Emphasis is placed on recorded causes and evolution processes of water inrush, as well as relevant mitigation measures. In particular, the geological conditions that generate such water inrush hazards are initially discussed by counting cases of tunnel water inrush in the past decades (43 cases of water inrush hazards in tunnels (including mountain tunnels)). The process of formation of failure modes of water inrush, and the corresponding research methods (including theoretical, numerical and experimental) are reviewed, and can be used to pave the ways for hazard prevention and future research. This is followed by a summary of the prevention methods and mitigation measures used in practice, and a short discussion of the achievements and limitations of each method. Then combined with the evolution characteristics of the failure area, the water inrush process of different modes is divided into three stages, with a proposed a grouting scheme for each stage. Finally, concluding remarks, current research gaps and future research directions on subsea tunnel water inrush are provided and discussed.
Relying on the Dujiangyan Irrigation Project, the Siguniang Mountain Rail Transit project, and the Balang Mountain No.1 Large Longitudinal Slope Tunnel Project, this paper systematically studies the mechanical response of the surrounding rock and support structure induced by TBM tunneling in composite stratum by using the methods of indoor test, similar model test and numerical simulation. In model tests with different rock dip angles (0°, 10°, 20°, 30°), the main findings are as follows: (1) The maximum settlement of the arch crown reaches −4.89 mm (monitoring surface 2, 20° dip angle), the displacement of the arch waist is smaller than that of the arch crown, and the deformation of the soft rock section is more significant. (2) The peak radial surrounding rock pressure generally occurs at a distance of 5 cm from the tunnel wall, with the highest pressure in the soft rock area of the arch waist reaching 16.807 kPa (monitoring surface 4). (3) The lining stress increases with the increase in rock dip angle, and the stress distribution on the same monitoring surface shows as arch waist > arch crown > arch shoulder, with the maximum stress concentrated in the soft rock area of the arch waist. Then, the finite difference method is used for numerical simulation to analyze the convergence deformation mechanism in the composite formation. The results indicate a strong consistency between the simulated displacement/stress patterns of the surrounding rock and lining structure and the experimental data. The research results provide a theoretical basis and experimental reference for the design and construction of similar projects.