Abdulaziz Abdulrahman Bubshait

Prof. Abdulaziz Abdulrahman Bubshait

King Fahd University of Petroleum and Minerals, Dhahran, Ash Sharqīyah, Saudi Arabia
orcid

Research Focus & Metrics

Academic Career Length

35Years (1992-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2003 in International Journal of Project Management
Verified
Journal Article
Closed access
ABAbdulaziz Abdulrahman Bubshait
Abdulaziz Abdulrahman Bubshait

1 July 1998 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
ABAbdulaziz Abdulrahman Bubshait
Abdulaziz Abdulrahman Bubshait
MCMichael J. Cunningham
Michael J. Cunningham
During a construction project, delays may result from many circumstances. Delays may be caused by the owner, the contractor, by acts of God, or a third party. They may occur early or late in the job, alone or with other delays. Negotiating a fair and timely damage settlement is beneficial to all parties. Network-based scheduling is an excellent vehicle for negotiating settlement of changes, disputes, and delays throughout the project. In the construction industry, however, there is no single, standard, and “accepted” procedure to determine the impact of schedule delays due to change orders or other unplanned developments. In this paper three delay measurement processes were studied. These procedures were employed to measure delay impact, utilizing computerized critical path method (CPM) analyses, performed on genuine construction schedules. Results indicate that outcomes of delay analyses are not predictable, nor can one method be used universally. However, in given circumstances, one procedure can be mor...

1 August 1994 in International Journal of Project Management
Verified
Journal Article
Closed access
ABAbdulaziz Abdulrahman Bubshait
Abdulaziz Abdulrahman Bubshait
SASoliman A Almohawis
Soliman A Almohawis

15 January 2023 in Energies
Verified
Journal Article
Open access
PDF file
MAMazen A Al-Sinan
Mazen A Al-Sinan
ABAbdulaziz Abdulrahman Bubshait
Abdulaziz Abdulrahman Bubshait
FAFatimah Alamri
Fatimah Alamri
Combating climate change by reducing greenhouse gas (GHG) emissions has become an obligation for countries that ratified the Paris Agreement. Saudi Arabia, as a member of the Paris Agreement, pledged to achieve net zero emissions (NZE) by 2060. This endeavor is challenging for all countries. This paper provides an analysis and assessment of the Saudi measures to achieve NZE by 2060. The analysis reveals that Saudi Arabia will reduce the total net emissions to 49.67 Mt of CO2eq, whereas under a business-as-usual scenario, the emissions would reach 1.724 million tons (Mt) of CO2 equivalent (CO2eq). The study reveals that sectors conducting environmental, social, and governance ratings (ESG) and those where the government is a stakeholder are on the right track and will facilitate the government’s efforts in reaching NZE. The gap in reaching NZE will be mainly due to the Saudi steel and cement industries.

1 July 2001 in International Journal of Project Management
Verified
Journal Article
Closed access
SASadi A. Assaf
Sadi A. Assaf
ABAbdulaziz Abdulrahman Bubshait
Abdulaziz Abdulrahman Bubshait
SASulaiman Atiyah
Sulaiman Atiyah
MAMohammed Al-Shahri
Mohammed Al-Shahri

25 May 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
MAMazen A Al-Sinan
Mazen A Al-Sinan
ABAbdulaziz Abdulrahman Bubshait
Abdulaziz Abdulrahman Bubshait
Recently, research on innovative approaches to and practices for plastic waste management in a circular economy has gained momentum. Plastic waste pollution poses a serious environmental concern. At the same time, the cement industry is among the biggest sources of CO2 emissions, which poses another environmental challenge. This makes plastic sand bricks an attractive alternative to concrete blocks and bricks. This paper looks at the recent studies regarding the development of plastic sand bricks and the different percentages of plastic and sand used in the bricks. The literature review reveals that there is a lack of studies that evaluate plastic sand construction materials from an economic perspective. Such studies are essential if the industry is to invest in and adopt this alternative construction material. Plastic sand bricks could be a workable solution for combating issues related to solid waste. The compressive strength decreased with increasing ratios of plastic to sand. Plastic sand bricks weighed less than the conventional bricks. Issues requiring further investigation include: dealing with varying proportions and types of plastic, the lack of understanding of the long-term performance of plastic sand bricks, the flammability and fire resistance of plastic sand bricks, and the absence of appropriate standards and regulations for recycling plastic into plastic sand bricks. This paper allows us to look ahead in terms of some specific technical needs, the translation of the emerging technology into practice, and new ideas to decrease plastic pollution.