Hesitant fuzzy evaluation strategy related to the interval-valued membership and nonmembership degrees should be an appropriate choice due to the lack of experience, ability and knowledge of some decision experts. In addition, it is important to reasonably model the interrelationship of these experts. In this work, firstly, the generalized interval-valued q-rung orthopair hesitant fuzzy sets (GIVqROHFSs) are defined, and some operational rules with respect to GIVqROF numbers are discussed. Secondly, two types of operators, which are denoted as GIVqROHFCA and GIVqROHFCGM, are developed. Thirdly, the desired properties and relationships of two operators are studied. Furthermore, a new multiple attributes group decision making (MAGDM) approach is proposed. Finally, three experiments are completed to illustrate the rationality of the developed method and the monotonicity of this approach concerning the parameter in the GIVqROHFCGM operator and the GIVqROHFCA operator which meets symmetrical characteristics, and shows the superiority and reliability of this new method in solving the GIVqROHF problems. The main advantages of this work include three points: (1) extending hesitant fuzzy sets to the interval-valued q-rung orthopair fuzzy case and proposing two types of aggregation operators for the GIVqROHF information; (2) considering the interaction among decision makers and among attributes in decision problems, and dealing with this interrelationship by fuzzy measure; (3) introducing the new decision method for the GIVqROHF environment and enriching the mathematical tools to solve multiple attributes decision-making problems.
Based on credibility theory and two-stage fuzzy optimization method, this paper presents a class of multi-product multi-period (MPMP) production planning problem. Some basic properties about the two-stage production-planning model are discussed. In addition, a heuristic algorithm, which combines fuzzy simulations and genetic algorithm (GA), is designed to solve the production planning problem, and a numerical example about the three-product three-period production planning problem is given to show the feasibility of the algorithm
In recent decades, the hesitant fuzzy set theory has been used as a main tool to describe the hesitant fuzzy phenomenon, which usually exists in multiple attributes of decision making. However, in the general case concerning numerous decision-making problems, values of attributes are real numbers, and some decision makers are hesitant about these values. Consequently, the possibility of taking a number contains several possible values in the real number interval [0, 1]. As a result, the hesitant possibility of hesitant fuzzy events cannot be inferred from the given hesitant fuzzy set which only presents the hesitant membership degree with respect to an element belonging to this one. To address this problem, this paper explores the axiomatic system of the hesitant possibility measure from which the hesitant fuzzy theory is constructed. Firstly, a hesitant possibility measure from the pattern space to the power set of [0, 1] is defined, and some properties of this measure are discussed. Secondly, a hesitant fuzzy variable, which is a symmetric set-valued function on the hesitant possibility measure space, is proposed, and the distribution of this variable and one of its functions are studied. Finally, two examples are shown in order to explain the practical applications of the hesitant fuzzy variable in the hesitant fuzzy graph model and decision-making considering hesitant fuzzy attributes. The relevant research results of this paper provide an important mathematical tool for hesitant fuzzy information processing from another new angle different from the theory of hesitant fuzzy sets, and can be utilized to solve decision problems in light of the hesitant fuzzy value of multiple attributes.
Since there are often few or no samples and asymmetry information in the problems, uncertainty theory is introduced to study uncertain multi-objective programming (UMP), which cannot be solved by probability theory. Generally speaking, there are two types of methods for solving the UMP problem: in deterministic method, using the numerical characteristics of an uncertain variable, the UMP problem is transformed into a deterministic multiobjective programming, and then solved by the weighting method and ideal point method; in the uncertain method, the UMP problem is transformed into an uncertain single-objective programming, and then is solved by the evaluation criteria of the uncertain variables. The theoretical analysis and the data results for numerical examples solved by the AC algorithm designed in the paper show that the two types of methods are obviously different. Further, using this comparison, the essential difference between the two methods is whether the uncertainty relation between objective functions sholud be considered. Therefore, when the uncertainty relation is closely related, the uncertain method is more appropriate; otherwise, the deterministic method should be chosen.