Weifeng Wang Wang

Weifeng Wang Wang


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 November 2023 in Ceramics International
Verified
Journal Article
Closed access
MWMengzhu Wang
Mengzhu Wang
HDHelei Dong
Helei Dong
XMXiaobiao Mao
Xiaobiao Mao
WWWeifeng Wang Wang
Weifeng Wang Wang
XJXiong Jijun
Xiong Jijun
QTQiulin Tan
Qiulin Tan

26 September 2024 in Sensors
Verified
Journal Article
Open access
PDF file
DWDoudou Wang
Doudou Wang
WGWenchuan Guo
Wenchuan Guo
ZZZou Zou
Zou Zou
TMTian Ma
Tian Ma
WWWeifeng Wang Wang
Weifeng Wang Wang
GCGuoxiang Chen
Guoxiang Chen
A terahertz photonic crystal fiber with two sensing channels was designed. Graphene coated on the micro-grooves in the cladding was used as plasma material to introduce tunability. The dispersion relation, mode coupling, and sensing characteristics of the fiber were studied using the finite element method. Ultrahigh sensitivity of 2.014 THz/RIU and 0.734 GHz/°C were obtained for analytes with refractive index in the range of 1.33 to 1.4 and environment temperature in the range of 10–60 °C, respectively. Refractive index resolution can reach the order of 10−5. The dual parameter simultaneous detection, dynamic tunable characteristics, and working in the low-frequency range of terahertz enable the designed photonic crystal fiber to have application prospects in the field of biosensing.

21 March 2025 in Processes
Verified
Journal Article
Open access
PDF file
ZWZhenping Wang
Zhenping Wang
XGXiao yun Gui
Xiao yun Gui
WWWeifeng Wang Wang
Weifeng Wang Wang
XZXuanchong Zhao
Xuanchong Zhao
XJXiaohan Ji
Xiaohan Ji
To solve the problems of numerous influencing factors, such as the high uncertainty and leakage risk of gas production pipelines in high-sulfur gas fields, a dynamic analysis of a gas production pipeline’s leakage risk using a dynamic Bayesian network is proposed. By means of Bow-tie model analysis, the primary risk sources of gas pipeline leakage and different accidents are summarized. A temporal dimension was introduced to construct a dynamic Bayesian network model, utilizing the Leaky noisy-OR gate model to rectify and compute conditional probability, thereby facilitating dynamic risk prediction of gas pipeline leakage. Taking the first section of the pipeline of a municipal gas collection station as an example, with the help of GeNIe 4.0 Academic software, the influence degree of each basic event on pipeline gas leakage was revealed. The change curve of gas leakage probability over time was drawn, and the occurrence probability of potential consequences of accidents was computed. The results indicate that the status of flanges, valves, and pipelines are key factors in determining the occurrence of gas leakage accidents, and six risk sources, including medium corrosion in gas leakage accidents, were determined, with these having practical conspicuousness for strengthening the leakage protection of gas pipelines and providing proper support for the formulation of relevant safety measures.

23 January 2020 in Advances in Materials Science and Engineering
Verified
Journal Article
Open access
PDF file
DZDuo Zhang
Duo Zhang
WWWeifeng Wang Wang
Weifeng Wang Wang
JDJun Deng
Jun Deng
HWHu Wen
Hu Wen
XZXiaowei Zhai
Xiaowei Zhai
If an airtight wall in a coal mine leaks air, it may cause spontaneous combustion of residual coal in the gob and even cause a full‐blown fire or gas explosion. In this study, we developed a new type of foamed concrete, low‐alkalinity sulphoaluminate cement (LASC), to control air leakage. The performance of filling materials that were prepared by adding various dosages of foam to LASC was studied. The longer the curing period for the foam filling material of LASC, the better the crystallinity of the hydrated product. With an increasing foam dosage, the initial setting time gradually extends while the fluidity of the foam slurry decreases. The bubble rate of the filling material increases and the density decreases with increasing foam dosage. The compressive strength of the LASC filling material decreases with increasing foam dosage and increases with increasing curing time. In the LASC filling materials, the optimal volume ratio of foam dosage to gel slurry is 2. The crystallinity, initial gel time, and compressive strength of the LASC foaming materials are better than those of ordinary Portland cement (OPC) foaming materials. When the crossheading is filled with LASC foam cement, the deformation of the surrounding rock is less than 19 cm, and the air leakage prevention is better than that achieved with loess and fly‐ash‐cement foam. Thus, the proposed LASC foam material can be applied to the filling of the crossheading to efficiently prevent leakage in underground coal mines.

4 May 2023 in Fire and Materials
Verified
Journal Article
Closed access
WWWeifeng Wang Wang
Weifeng Wang Wang
XJXiaohan Ji
Xiaohan Ji
LSLin Shi
Lin Shi
CLCuizhen Lu
Cuizhen Lu
HLHanfei Liu
Hanfei Liu
XGXiaoyun Gui
Xiaoyun Gui

9 April 2025 in Journal of Thermal Analysis and Calorimetry
Verified
Journal Article
Closed access
PDF file
WWWeifeng Wang Wang
Weifeng Wang Wang
XSXiaopeng Shang
Xiaopeng Shang
YHYuhang Huo
Yuhang Huo
HYHongyin Yi
Hongyin Yi
ZLZhuoyang Li
Zhuoyang Li
Chi-Min ShuChi-Min Shu
Chi-Min Shu