A novel precast concrete beam-column connection partially reinforced with high-strength steel rebars of a yield strength greater than 630 MPa was introduced to avoid reinforcement obstruction in connection zones. Reversed cyclic loadings were applied to fullscale specimens to evaluate their seismic performance. For the first precast specimen, high-strength steel rebars acted as bottom longitudinal bars of the beams. For the second precast specimen, high-strength steel rebars were used as both bottom longitudinal bars and embedded bars that were anchored into the joint. The results show that the new precast connection exhibits a satisfactory seismic resistance. The anchored embedded bars are not necessary in the new system for a limited improvement in the structural performance. The mechanical equilibrium of the rectangular stress block method can be applied to estimate the strength of the new connection using the design philosophy of strong column-weak beam.
Building information model (BIM) is considered as a promising means to facilitate the application of precast concrete (PC). Ordinary BIMs involve the information on geometry, materials, manufacturing details, quantities and so on, which are determined after designing. However, the component details and mechanical behaviors of PC structures, which are usually ignored in the BIM during designing, could profoundly affect the final structural forms. In this paper, several different precast beam-to-column connections applied in China were modeled as the basic components with BIM software, and similar precast moment-resisting frame models were designed with these connections meeting requirements of building codes. Finally they were compared in terms of quantity and total cost. Conclusions came that it was important to build the structural system library of PC including the information of component details and mechanical behaviors in BIM.
Cable domes has been widely adopted around the world. A new tensile steel strip cable dome is proposed and a force-finding method of approaching initial shape is introduced. It is easy to be constructed by tow-lifting method without many scaffolds and connect rigid materials directly. The force-finding method of approaching initial shape is effective for the proposed structure.