To ensure the stability and reliability of the power network operation, a number of Grid Codes have been used to specify the technical boundary requirements for different countries and areas. With the fast propagation of the usage of Electrical Energy Storage (EES), it is quite important to study how the EES technology with its development can help the Grid Code realization. The paper provides a comprehensive study of Great Britain (GB) Grid Code mainly on its voltage and frequency relevant specifications, with a comparison of other countries’ grid operation regulations. The different types of EES technologies with their technical characteristics in relation to meeting Grid Codes have been analysed. From the study, apart from direct grid-connection to provide grid services on meeting Grid Codes, EES devices with different technologies can be used as auxiliary units in fossil-fuelled power plants and renewable generation to support the whole systems’ operation. The paper also evaluates the potentials of different types of EES technologies for implementing the relevant applications based on the Grid Codes. Some recommendations are given at the end, for the EES technology development to help the Grid Code realization and to support the relevant applications.
The current load balance in the grid is managed mainly through peaking fossil-fuelled power plants that respond passively to the load changes. Intermittency, which comes from renewable energy sources, imposes additional requirements for even more flexible and faster responses from conventional power plants. A major challenge is to keep conventional generation running closest to the design condition with higher load factors and to avoid switching off periods if possible. Thermal energy storage (TES) integration into the power plant process cycle is considered as a possible solution for this issue. In this article, a technical feasibility study of TES integration into a 375-MW subcritical oil-fired conventional power plant is presented. Retrofitting is considered in order to avoid major changes in the power plant process cycle. The concept is tested based on the complete power plant model implemented in the ProTRAX software environment. Steam and water parameters are assessed for different TES integration scenarios as a function of the plant load level. The best candidate points for heat extraction in the TES charging and discharging processes are evaluated. The results demonstrate that the integration of TES with power plant cycle is feasible and provide a provisional guidance for the design of the TES system that will result in the minimal influence on the power plant cycle.