Yujie DONG

Dr. Yujie DONG

orcid

Research Focus & Metrics

Academic Career Length

27Years (2000-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2009 in Nuclear Engineering and Design
Verified
Journal Article
Closed access
ZZZuoyi Zhang
Zuoyi Zhang
ZWZongxin Wu
Zongxin Wu
DWDazhong Wang
Dazhong Wang
YXYuanhui Xu
Yuanhui Xu
YSYuliang Sun
Yuliang Sun
YDYujie DONG
Yujie DONG

1 March 2016 in Engineering
Verified
Journal Article
Open access
ZZZuoyi Zhang
Zuoyi Zhang
YDYujie DONG
Yujie DONG
FLFu Li
Fu Li
ZZZhengming Zhang
Zhengming Zhang
HWHaitao Wang
Haitao Wang
JWJinhua Wang
Jinhua Wang
After the first concrete was poured on December 9, 2012 at the Shidao Bay site in Rongcheng, Shandong Province, China, the construction of the reactor building for the world's first high-temperature gas-cooled reactor pebble-bed module (HTR-PM) demonstration power plant was completed in June, 2015. Installation of the main equipment then began, and the power plant is currently progressing well toward connecting to the grid at the end of 2017. The thermal power of a single HTR-PM reactor module is 250 MWth, the helium temperatures at the reactor core inlet/outlet are 250/750 °C, and a steam of 13.25 MPa/567 °C is produced at the steam generator outlet. Two HTR-PM reactor modules are connected to a steam turbine to form a 210 MWe nuclear power plant. Due to China's industrial capability, we were able to overcome great difficulties, manufacture first-of-a-kind equipment, and realize series major technological innovations. We have achieved successful results in many aspects, including planning and implementing R&D, establishing an industrial partnership, manufacturing equipment, fuel production, licensing, site preparation, and balancing safety and economics; these obtained experiences may also be referenced by the global nuclear community

16 August 2022 in Nuclear Science and Techniques
Verified
Journal Article
Open access
PDF file
ZZZuo-Yi Zhang
Zuo-Yi Zhang
YDYujie DONG
Yujie DONG
QSQi Shi
Qi Shi
FLFu Li
Fu Li
HWHaitao Wang
Haitao Wang
The HTR-PM600 high-temperature gas-cooled reactor nuclear power plant is based on the technology of the high-temperature gas-cooled reactor pebble-bed module (HTR-PM) demonstration project. It utilizes proven HTR-PM reactor and steam generator modules with a thermal power of 250 MWth and power generation of approximately 100 MWe per module. Six modules in parallel, connected to a steam turbine, form a 600-MWe nuclear power plant. In addition, its system configuration in the nuclear island is identical to that of the HTR-PM in which the technical risks are minimized. Under this principle, the HTR-PM600 achieves the same level of inherent safety as the HTR-PM. The concept of a ventilated low-pressure containment (VLPC) is unchanged; however, a large circular VLPC accommodating all six reactor modules is adopted rather than the previous small-cavity-type VLPC, which contains only one module, as defined for the HTR-PM. The layout of the nuclear island and its associated systems refer to single-unit pressurized water reactor (PWR) practices. With this layout, the HTR-PM600 achieves a volume size of the nuclear island that is comparable to a domestic PWR of the same power level. This will be a Generation IV nuclear energy technology that is economically competitive.

1 September 2017 in Energy
Verified
Journal Article
Closed access
ZDZhe Dong
Zhe Dong
YPYifei Pan
Yifei Pan
ZZZuoyi Zhang
Zuoyi Zhang
YDYujie DONG
Yujie DONG
XHXiaojin Huang
Xiaojin Huang

1 July 2018 in Energy
Verified
Journal Article
Closed access
ZDZhe Dong
Zhe Dong
YPYifei Pan
Yifei Pan
ZZZuoyi Zhang
Zuoyi Zhang
YDYujie DONG
Yujie DONG
XHXiaojin Huang
Xiaojin Huang

1 June 2009 in Annals of Nuclear Energy
Verified
Journal Article
Closed access
YZYanhua Zheng
Yanhua Zheng
LSLei Shi
Lei Shi
YDYujie DONG
Yujie DONG