Michael Nii Addy

Dr. Michael Nii Addy

orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 April 2020 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
MAMichael Nii Addy
Michael Nii Addy
EAEmmanuel Adinyira
Emmanuel Adinyira
JDJames Cofie Danku
James Cofie Danku
FDFlorence Dadzoe
Florence Dadzoe
Purpose: Developing countries in sub-Saharan Africa are faced with significant challenges as the economies continue to emerge. There is a huge infrastructural demand and various efforts to step up supply. Whilst stepping up the supply, the environmental concerns of these supplies require a lot of attention. With the need to reduce the environmental impact of buildings whilst promoting a green infrastructure, various studies have explored the obstacles to green building technology adoption. This study explores the impediments to the development of the green building market in sub-Saharan Africa.Design/methodology/approach: Using building consultants as the unit of analysis, this study explores the impediments using a structured survey questionnaire. The study area is Ghana, an emerging country in sub-Saharan Africa.Findings: Key impediments to the development of the market is lack of awareness, lack of education and lack of fiscal incentives. The analysis shows that all the variables identified are significant in impeding the growth of the market. The results suggest that within the domain of developing countries, environmental issues may not be of immediate concern as economic issues take centre stage. For sustainability of the environment, it is unequivocal that dissemination of knowledge to key stakeholders be done.Practical implications: Academic institutions and professional bodies have a pivotal role to play in raising awareness of green buildings. Governmental support such as various structures should be put in place to build up the local capacity of firms not only to compete with foreign counterparts but also to ensure innovative delivery of green buildings.Originality/value: The paper presents contextual realities on the green market restrictions within developing countries in sub-Saharan Africa through a deeper understanding of market barriers and recommends pathways for stakeholders.

3 April 2018 in Journal of Engineering, Design and Technology
Verified
Journal Article
Closed access
MAMichael Nii Addy
Michael Nii Addy
EAEmmanuel Adinyira
Emmanuel Adinyira
JAJoshua Ayarkwa
Joshua Ayarkwa
Purpose: The purpose of this paper is to empirically study the factors that facilitate adoption of building information modelling (BIM) among quantity surveyors (QSs) using the unified theory of acceptance and use of technology (UTAUT). Design/methodology/approach: Using a quantitative approach, factors identified in the UTAUT are examined. The empirical investigation has been conducted using survey questionnaire. The data set has been obtained from 73 practicing QSs in Ghana. Findings: The results indicated a significant positive impact of effort expectancy, facilitation conditions and hedonic motivation towards BIM adoption. Surprisingly social influence and performance expectancy have a negative impact on BIM adoption. Practical implications: The structures uncovered in the study show that not all UTAUT factors are applicable within the study area. The findings provide a good backdrop in the development of policy and a roadmap for BIM implementation in Ghana. Originality/value: The original contribution and value of the paper is the use of UTAUT2 to provide empirical evidence on factors that facilitate BIM adoption in Ghana amongst QSs.

1 October 2017 in Energy Procedia
Verified
Journal Article
Open access
MAMichael Nii Addy
Michael Nii Addy
EAE. Adinyira
E. Adinyira
JAJ. Ayarkwa
J. Ayarkwa

17 October 2024 in Built Environment Project and Asset Management
Verified
Journal Article
Closed access
Ernest KissiErnest Kissi
Ernest Kissi
KEKenneth Eluerkeh
Kenneth Eluerkeh
Clinton AigbavboaClinton Aigbavboa
Clinton Aigbavboa
MAMichael Nii Addy
Michael Nii Addy
PBProsper Babon-Ayeng
Prosper Babon-Ayeng
Purpose: With emerging technologies rapidly changing work processes, it is important to understand the skills and characteristics project managers (PMs) need to effectively manage projects in the digital era. This study determines the underlying competencies needed for digitalization among PMs in the construction industry. The study also identified the most significant competencies needed by PMs in the era of digitalization.Design/methodology/approach: The methodology adopted for the research study was quantitative. It was founded on a thorough review of pertinent literature, which went through a pilot survey study from six project management experts in the construction industry. Based on the comment and feedback, a questionnaire survey was developed and distributed to participants through a convenience sampling technique. The data retrieved were from 100 professional PMs out of 130 questionnaires distributed in the Ghanaian construction industry. Data collected were analyzed using fuzzy synthetic evaluation (FSE).Findings: Based on FSE, the three competency parameters (knowledge, skills, personal characteristics) generated significant indices indicating that all three competencies are significant among construction PMs in the digitalization era. Under the knowledge competency parameter, six sub-competencies comprising a total of 12 variables were identified. For skills, seven sub-competencies consisting of 23 variables were identified. Regarding personal attributes, six sub-competencies with 17 variables were highlighted. Under knowledge, technical knowledge was found to be the most important with an index of 4.212. For skills, leadership skills were rated highest with an index of 4.240. Regarding personal attributes, social or interpersonal skills were deemed most critical with an index of 4.199.Practical implications: The results provide guidance to both industry and academic stakeholders. For PMs and their employers, the study highlights priority areas for competency development and training related to the era of digitalization. It also informs educational institutions on how to structure project management curricula to best prepare students for jobs of the future. This study gives more insight into the competencies that need more attention for PMs in the digitalization era. As a result, firms that adopt the identified competency will benefit from implementing digitalization in project delivery.Originality/value: This study makes an original contribution as one of the first to empirically investigate the competencies required of construction PMs in the construction industry in the digitalization era. By focusing on the developing country context of Ghana, the study extends knowledge to an under-researched region and market. It provides a foundation for future comparative research across diverse global contexts.

1 August 2021 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
SYSitsofe Kwame Yevu
Sitsofe Kwame Yevu
AYAnn Tit Wan Yu
Ann Tit Wan Yu
Amos DarkoAmos Darko
Amos Darko
MAMichael Nii Addy
Michael Nii Addy
Recent recognition for increased digitization of construction processes presents an important need to accelerate electronic procurement systems (EPS) application on projects. The EPS uptake rate in construction is relatively low, and the decision process required to increase the uptake is complex due to the influences of several competing driving forces (DFs). Previous studies identified individual DFs based on experts’ qualitative judgements and knowledge, which are subjective and lack the inherent clustering influences of DFs on EPS application. This study developed a fuzzy-based evaluation model for assessing DFs influences on EPS application in construction projects. The model transforms qualitative judgments into quantitative and more-usable assessments using fuzzy sets for effective long-term planning and consistent implementation decisions. A data set of 121 expert responses, resulting in 6 clusters of DFs, was applied to fuzzy logic to develop the DFs influence evaluation model. The integrity and environment-related forces and process optimization–related forces were the top two DFs clusters influencing EPS uptake. The remaining four clusters had significant influences, resulting in an overall high influence threshold. This implies that significant influence levels of the DFs clusters are required to accelerate EPS uptake on projects. This study contributes to knowledge by developing an influence model integrating subjective expressions to indicate EPS uptake within a project’s environment. The model’s flexibility helps to assess influences based on a decision maker’s situation.

4 November 2014 in Structural Survey
Verified
Journal Article
Closed access
MAMichael Nii Addy
Michael Nii Addy
EAEmmanuel Adinyira
Emmanuel Adinyira
CKChristian Koranteng
Christian Koranteng
Purpose: – Building energy efficiency is an inescapable part of the solution to Africa's sustainable development; its implementation can result in cost effective ways that can contribute to economic and social development as well as environmental sustainability. Despite this, a number of factors including financial barriers and market barriers are perceived by policy makers and building designers to influence the efficient use of energy in buildings. The purpose of this paper is to investigate the perceptions of architects in relation to the challenges of building energy efficiency in Ghana.Design/methodology/approach: – From a review of pertinent literature 18 factors were identified as challenging. Empirical investigation was carried out using survey questionnaire. The consideration of overlapping aspects of the study largely motivated the use of factor analysis to analyse the data which made it possible to make scientific deductions and built explanations from the results.Findings: – The study derives five brands of uncorrelated variables that better explains challenges faced in implementing building energy efficiency in Ghana. These variables include financial barriers, information barrier, private sector participation, behavioural barriers and production barrier. The study provides insight on the contextual provision of realities faced in implementing building energy efficiency in Ghana.Originality/value: – Key contribution of the paper to the body of knowledge is manifested in the use of the principal component analysis. This has rigorously provided understanding into the complex structure and the relationship between the various knowledge areas of building energy efficiency barriers in Ghana.