jiajia feng

Ms. jiajia feng


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
MJMei-xian Jiang
Mei-xian Jiang
JFJiajia Feng
Jiajia Feng
GWGuanghua Wu
Guanghua Wu
LZLin Zhou
Lin Zhou
FMFangzheng Ma
Fangzheng Ma
YZYUQIU ZHANG
YUQIU ZHANG
As container ports become increasingly important to the global supply chain, a growing number of ports are improving their competencies by consolidating multiple terminal resources internally. In addition, in the context of energy conservation and emission reduction, ports measure competitiveness not only in terms of terminal size, throughput and service level, but also in terms of low energy consumption and low pollution. Therefore, a nonlinear mixed-integer programming model considering the cost of carbon is developed for the multi-terminal berth and quay crane joint robust scheduling problem under uncertain environments to minimize the sum of expectation and variance of total cost under all randomly generated samples. The model considers the water depth and interference of quay cranes, etc. The expected vessel arrival time and the average operational efficiency plus relaxation are used as their actual values when scheduling. Finally, an improved adaptive genetic algorithm is developed by combining the simulated annealing mechanism, and numerical experiments are designed. The results show that the joint berth and quay crane scheduling with uncertainties and a multi-terminal coordination mechanism can effectively reduce the operating cost, including carbon costs and the vessel departure delay rate, and can improve resource utilization. Meanwhile, the scheduling with the multi-terminal coordination mechanism can obtain more significant improvement effects than the scheduling with uncertainties.

Verified
Journal Article
Open access
PDF file
MJMei-xian Jiang
Mei-xian Jiang
JZJian Zhou
Jian Zhou
JFjiajia feng
jiajia feng
LZLin Zhou
Lin Zhou
FMFangzheng Ma
Fangzheng Ma
GWGuanghua Wu
Guanghua Wu
In this work, we study the integrated berth and crane scheduling problem in a tidal port with multiple terminals, considering the uncertainties, tides, maximum coverage of cranes and interference between cranes. For coping with the uncertainties, a certain number of randomly generated samples are used to evaluate the solutions, and slack variables are introduced to reduce the impact caused by the variation in vessel arrival and crane operational efficiency. A novel nonlinear mixed integer programming model is first formulated for the problem to minimize the sum of expectation and variance of costs under all samples. An improved adaptive genetic algorithm, combining a simulated annealing mechanism and greedy construction strategy, is developed and implemented by MATLAB. The feasibility and validity of the algorithm and the benefits of multi-terminal collaborative scheduling strategy under uncertainty are evaluated through numerical experiments. The results show that the algorithm can obtain feasible scheduling solutions with higher quality. Compared to the strategy that considers either the uncertainty or the multi-terminal collaborative mechanism, the resulting solution considering both can effectively reduce the cost and improve the competitiveness of the port.