Improvement of productivity in construction has been a major industry challenge, given its high impact on project results. It has received increased attention from construction researchers promoting different enhancement actions, since analyzing factors affecting labor productivity is an instrumental part in this process. This paper focuses on identifying and understanding the productivity factors affecting projects in a Chilean construction company on the basis of questionnaires administered to both direct workers and midlevel employees. Analysis of the questionnaire results helped to determine organizational and managerial weaknesses and facilitated comparison of the findings with previous productivity studies. The results proved to be useful in developing recommendations for productivity improvements. The main findings indicate that the critical areas affecting construction productivity were related to materials, tools, rework, equipment, truck availability, and the workers’ motivational dynamics. These results are similar to those obtained in previous studies in the United States and in Chile. Salary expectations were found to be the main reason for turnover in the studied company, which was an aspect not mentioned in previous studies. Finally, additional analyses seem to show that some factors affecting productivity are common to construction projects across boundaries, therefore validating data aggregation and the possibility of learning from experiences in different locations and even separated in time of occurrence.
1 January 2014 in Journal of Construction Engineering and Management
Variability is a well-known problem in construction projects, which leads to the general deterioration of project performance. During the last decade, the Last Planner System (LPS™), a production planning and control system based on lean production principles, has been increasingly applied in the construction industry to improve planning reliability reducing the negative impacts of variability. LPS™ promotes actions to increase planning reliability, monitoring the percentage of plan completed (PPC) in a short-term period. However, there is limited research evidence about the relationship between planning reliability and project performance. In this paper, the authors report on a detailed research analysing this relationship during the construction phase of a home building project at activity and project levels. By doing so, two indexes are proposed: an activity planning reliability index called the process reliability index (PRI), and a project aggregate labour productivity index, called the project productivity index (PPI). Statistical analyses using the proposed indexes were conducted showing positive and strong relationships between planning reliability and performance at activity and project levels. Finally, the research findings provide the guidelines of a preliminary methodology to forecast the impacts of planning reliability over project performance, when lean production methodologies are applied in project planning and control.