Weiguo Tu

Weiguo Tu


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 August 2024 in Environmental Monitoring and Assessment
Verified
Journal Article
Closed access
PDF file
TSTao Song
Tao Song
WTWeiguo Tu
Weiguo Tu
MSMingyue Su
Mingyue Su
HSHan Song
Han Song
SCShu Chen
Shu Chen
JGJingjing Guo
Jingjing Guo

6 November 2024 in Environmental Research
Verified
Journal Article
Closed access
TSTingqian Shan
Tingqian Shan
BWBin Wang
Bin Wang
WTWeiguo Tu
Weiguo Tu
FHFuyang Huang
Fuyang Huang
WYWenguang Yang
Wenguang Yang
XLXuemei Luo
Xuemei Luo

24 March 2023 in Environment, Development and Sustainability
Verified
Journal Article
Closed access
PDF file
YXYuting Xiao
Yuting Xiao
MFMing Fan
Ming Fan
JYJing Yao
Jing Yao
XLXiaoying Liang
Xiaoying Liang
CCCan Cai
Can Cai
WTWeiguo Tu
Weiguo Tu

23 August 2022 in Frontiers in Environmental Science
Verified
Journal Article
Open access
SLSen Li
Sen Li
YWYong Wu
Yong Wu
FNFuyu Nie
Fuyu Nie
WTWeiguo Tu
Weiguo Tu
XLXueling Li
Xueling Li
TSTao Song
Tao Song
In the present study, the Erigeron canadensis L., a typical invasive plant in Southwest China, was utilized as the raw material to prepare original biochar (ECL), a rare earth element La–modified biochar (La–ECL), and a rare earth element La coupling cationic surfactant [cetyltrimethylammonium chloride (CTAC)]–modified biochar (La/CTAC–ECL). These materials were then added to simulated permeable reactive barriers (PRBs) and their nitrate (NO3−) contaminant remediation performances were evaluated in groundwater. The results show that the breakthrough time for NO3− in a simulated PRB column increases as the concentration of the influent NO3− and the flow rate decreases, whereas with the increases of filler particle size and the height of the filler in the column initially increases, and then decreases. Considering an initial NO3− concentration of 50 mg L−1, and a filler particle size range of 0.8–1.2 mm, the maximum adsorption capacity of the La/CTAC–ECL column for NO3− is 18.99 mg g−1 for a filler column height of 10 cm and an influent flow rate of 15 ml min−1. The maximum quantity of adsorbed NO3− of 372.80 mg is obtained using a filler column height of 15 cm and an influent flow rate of 10 ml min−1. The Thomas and Yoon–Nelson models accurately predict the breakthrough of NO3− in groundwater in the simulated PRB column under different conditions, and the results are consistent with those from dynamic NO3− adsorption experiments. TEM, XRD, FTIR, and XPS analyses demonstrate that the modification using the La and CTAC improves the surface structure, porosity, permeability, and configuration of functional groups of the biochar. The mechanisms of NO3− removal from groundwater using the La/CTAC–ECL include pore filling, surface adsorption, ion exchange, and electrostatic adsorption. The composite La/CTAC–ECL exhibits a superior potential for the remediation of NO3− contaminated groundwater.


9 October 2024 in Process Safety and Environmental Protection
Verified
Journal Article
Closed access
YYYuankun Yang
Yuankun Yang
TMTian Ma
Tian Ma
SCShu Chen
Shu Chen
HSHan Song
Han Song
LLLunzhen Li
Lunzhen Li
WTWeiguo Tu
Weiguo Tu