1 July 2022 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
EKEu Wang Kim
Eu Wang Kim
MPMin Seo Park
Min Seo Park
KKKyoungmin Kim
Kyoungmin Kim
KKKyong Ju Kim
Kyong Ju Kim
During a long-term construction project, numerous stakeholders participate and collaborate with each other. In such scenario, the processes of creating, storing, and managing project documents are highly complicated. Due to the nature of the construction projects, problems arise in document management such as loss of documents and difficulties in tracking, which can result in claim failure and huge damage. This study proposes a method to efficiently record, search, and manage construction documents that can protect legal rights in preparation for claims/disputes. This study designed a system that can generate, transfer, and synchronize blocks based on email communication whenever an event occurs. It also provides functions such as document search, history tracking, automatic extraction of related document, and authenticity verification for document management. The findings of the study have established that reliability of documents is secured during the recording, storing, and managing processes, and thus claim- and dispute-supporting tasks are supported.

19 February 2021 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
KKKyong Ju Kim
Kyong Ju Kim
KKKyoungmin Kim
Kyoungmin Kim
EKEu Wang Kim
Eu Wang Kim
TNThi Ha Tho Nguyen
Thi Ha Tho Nguyen
Bid-riggings have persisted as an issue in the construction industry with its estimated damages being the most troublesome element. This study identifies the current limitations in estimating these damages and proposes an alternative approach to estimate the damages from bid-rigging in design-build (DB) construction projects. This study investigated a hypothetical competitive scenario that reflected the pricing model in DB contracts aimed at both winning the project and making profits. The alternative approach utilized a simulation model based on each bidder’s historical bidding data that could reproduce competitive bidding in DB-delivery. The feasibility of the proposed model was demonstrated with a case study conducted on a real railway construction project. This proposed model can also be used in determining an optimal bid price for DB construction projects.

13 September 2022 in Buildings
Verified
Journal Article
Open access
PDF file
KKKyong Ju Kim
Kyong Ju Kim
BHBonghee Han
Bonghee Han
MPMin Seo Park
Min Seo Park
KKKyoungmin Kim
Kyoungmin Kim
EKEu Wang Kim
Eu Wang Kim
Most construction projects are delayed, and many are subject to claims or disputes. Therefore, delay analysis is a critical component of any construction project to determine who is responsible for delays. This research examines four different techniques for estimating delay impacts using the impacted as-planned (IAP) method. A sample network was introduced as an example to discuss several concerns. The advantages and limitations of each approach were identified, and recommendations were given for each approach. When inserting an activity or activities representing delay events in IAP, it is necessary to use both constraints and logical relations among delay events, their logical predecessors, and successors. Constraints representing the actual date of delay events are the simplest and easiest. However, constraints should not be used in “single insertion” and “inserting only owner- or contractor-caused delay” approach. In addition, in the case of using constraints, it is critical to ensure that the impact of delay events is less than the duration of those delay events. Constraints should be avoided in this scenario, and delay events should be logically connected to their logical predecessors and successors without constraints. This study also identified through an example that inserting delay events only by logic can cause wrong analysis results. The results of this study will be helpful for delay analysts in identifying what kinds of problems occur in IAP methods and how to prevent those problems.

29 April 2024 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
KKKyong Ju Kim
Kyong Ju Kim
DKDeok Soo Kim
Deok Soo Kim
KKKyoungmin Kim
Kyoungmin Kim
EKEu Wang Kim
Eu Wang Kim
YSYeon Ju Shin
Yeon Ju Shin
Bid-rigging has long been a problem in the construction area. This research identified the existing problems in evaluating damages from bid-rigging in Design-Bid-Build (DBB) and lowest-bid construction projects. Traditional econometric assessment based on stochastics requires sufficient historical data to obtain reliable estimates. Thus, it is crucial to collect and analyze data from pertinent projects for its utilization. To ensure the accuracy of the estimation, a substantial amount of data on the outcomes of DBB bids should have been gathered. In many construction projects, that requirement could not be met. Furthermore, econometric analysis cannot reflect the differences caused by the details of individual projects. This study proposes an alternative approach based on detailed cost estimates, weights of major work groups and their historical bid rates when historical data from similar projects are scarce. This approach can reflect the distinct characteristics of individual projects. The proposed model was applied to 23 gas pipeline construction projects under DBB and the lowest bid. This study identified the impacts of the different compositions of major work groups. Bid rates of the main work groups could not only be used to evaluate the damages caused by bid-rigging, but could also be used to determine reliable bid prices and provide a bidding strategy to aid the bidder’s decision-making process in future bids for similar projects.